RED RIVER SH 37 (0189-04-022)

Items: 101

County: RED RIVER
Length: N/A
Highway: SH 37
District: PARIS
Control Number: 0189-04-022
DBE Goal: N/A
Project: STP 2020(396)
Guaranty: N/A
Time: 204 WORKING DAYS
Engineer's Estimate: $8,340,180.67
Date: 12/03/2019 (6 years ago)
Contract Number: N/A
Type: REHABILITATION OF EXISTING ROAD
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$8,340,180.67
1
$7,901,676.74
Over/Under Est: -5.26% -$438,503.93
Over/Under Est: 0.59% $49,167.30
Amt Left: 6.17% $487,671.23
Over/Under Est: 13.22% $1,102,803.22
Amt Left: 19.51% $1,541,307.15
Delta: -12.56% -$1,053,635.92
Over/Under Est: 13.45% $1,122,142.30
Amt Left: 19.75% $1,560,646.23
Delta: -0.20% -$19,339.08

Bid Items & Bid Tabulations

101 Total 0 of 101
RED RIVER  |  SH 37  |  PARIS  |  0189-04-022  |  12/03/2019  |  $8,340,180.67  |  STP 2020(396)  |  REHAB OF EXIST ROAD  |  204 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
RICHARD DRAKE CONSTRUCTION COMPANY, L.P.
AUSTIN BRIDGE & ROAD SERVICES, LP
EAST TEXAS BRIDGE, INC.
PREPARING ROW
STA 536.360 $1,050.000 $468.600 $440.000 $500.000 $700.000
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 20.000 $500.000 $426.000 $400.000 $400.000 $300.000
PREP ROW (TREE)(GREATER THAN 24" DIA)
EA 20.000 $1,100.000 $532.500 $500.000 $500.000 $500.000
REMOVING CONC (RIPRAP)
SY 6.000 $16.000 $21.300 $25.000 $115.000 $50.000
REMOVING CONC (DRIVEWAYS)
SY 179.000 $25.000 $21.300 $25.000 $60.000 $20.000
EXCAVATION (ROADWAY)
CY 129.000 $20.000 $40.540 $25.000 $75.000 $20.000
SUBGRADE WIDENING (ORD COMP)
STA 19.720 $200.000 $629.440 $1,050.000 $1,800.000 $500.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 26.000 $30.000 $16.920 $100.000 $85.000 $30.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 177.000 $25.000 $37.030 $50.000 $75.000 $30.000
BACKFILL (TY B)
STA 470.980 $110.000 $115.650 $300.000 $220.000 $200.000
ROAD GRADER WORK (ORD COMP)
STA 524.930 $150.000 $123.080 $275.000 $150.000 $300.000
BROADCAST SEED (TEMP) (WARM)
SY 164,453.000 $0.100 $0.060 $0.050 $0.050 $0.100
BROADCAST SEED (TEMP) (COOL)
SY 164,453.000 $0.100 $0.060 $0.060 $0.050 $0.100
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
SY 324,931.000 $0.260 $0.190 $0.200 $0.190 $0.220
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 3,974.000 $3.000 $0.370 $0.500 $0.300 $0.500
VEGETATIVE WATERING
MG 2,110.000 $18.000 $22.300 $24.000 $26.000 $7.000
AGGR(TY-B GR-4 SAC-B)
CY 912.000 $90.000 $137.680 $130.000 $210.000 $95.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 49,297.000 $4.950 $2.910 $4.180 $4.250 $4.250
D-GR HMA(SQ) TY-B PG64-22
TON 171.000 $75.000 $126.790 $115.400 $175.000 $150.000
D-GR HMA(SQ) TY-C PG64-22
TON 3,285.000 $107.000 $85.650 $96.800 $90.000 $105.000
D-GR HMA TY-B PG64-22
TON 20,786.000 $75.000 $80.000 $90.650 $96.000 $105.000
SUPERPAVE MIXTURES SP-C SAC-A PG64-22
TON 26,222.000 $92.000 $86.380 $93.800 $98.250 $108.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 1,100.000 $70.000 $103.250 $85.400 $82.000 $100.000
PLANE ASPH CONC PAV(0" TO 6")
SY 14,161.000 $2.500 $5.060 $4.000 $4.500 $2.750
PLANE ASPH CONC PAV(0" TO 8")
SY 236,983.000 $2.900 $2.930 $3.000 $2.750 $2.750
CONC STR REPAIR (STANDARD)
SF 4.000 $250.000 $1,000.000 $1,000.000 $1,625.000 $400.000
RIPRAP (CONC)(4 IN)
CY 53.000 $520.000 $505.880 $500.000 $550.000 $500.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 38.000 $150.000 $177.180 $280.000 $350.000 $125.000
RIPRAP (MOW STRIP)(4 IN)
CY 242.000 $435.000 $505.880 $450.000 $550.000 $450.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 1,628.000 $38.000 $29.820 $35.000 $42.500 $30.000
RETROFIT RAIL (TY T631)
LF 3,625.000 $85.000 $100.110 $90.000 $95.000 $100.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 2.000 $600.000 $692.250 $500.000 $1,100.000 $600.000
HEADWALL (CH - PW - 0) (DIA= 60 IN)
EA 2.000 $12,000.000 $15,975.000 $12,500.000 $12,000.000 $12,000.000
HEADWALL (CH - PW - S) (DIA= 60 IN)
EA 2.000 $12,000.000 $17,040.000 $14,000.000 $13,000.000 $14,000.000
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
EA 1.000 $5,500.000 $8,520.000 $6,000.000 $6,500.000 $3,000.000
SET (TY II) (12 IN) (CMP) (6: 1) (P)
EA 4.000 $500.000 $559.130 $600.000 $775.000 $750.000
SET (TY II) (12 IN) (RCP) (6: 1) (P)
EA 14.000 $550.000 $612.380 $500.000 $700.000 $750.000
SET (TY II) (15 IN) (RCP) (6: 1) (P)
EA 6.000 $700.000 $612.380 $500.000 $750.000 $750.000
SET (TY II) (18 IN) (CMP) (6: 1) (P)
EA 2.000 $700.000 $852.000 $800.000 $895.000 $900.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 6.000 $600.000 $852.000 $600.000 $875.000 $900.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 2.000 $1,070.000 $1,278.000 $1,100.000 $1,100.000 $1,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $600.000 $1,278.000 $1,000.000 $1,000.000 $1,200.000
REMOV & RE - LAY PIPE (60 IN)
LF 6.000 $75.000 $106.500 $200.000 $200.000 $200.000
REMOV STR (HEADWALL)
EA 1.000 $875.000 $1,597.500 $500.000 $750.000 $1,000.000
REMOV STR (PIPE)
LF 30.000 $20.000 $21.300 $50.000 $6.000 $20.000
MOBILIZATION
LS 1.000 $757,896.430 $400,000.000 $397,047.000 $940,000.000 $700,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $5,000.000 $10,920.320 $6,500.000 $24,650.000 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 680.000 $47.000 $40.470 $38.000 $68.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 680.000 $9.200 $8.520 $8.000 $6.000 $16.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,340.000 $2.600 $2.660 $2.500 $2.200 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,340.000 $1.100 $0.800 $0.750 $0.500 $1.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 1,350.000 $15.000 $20.100 $25.000 $10.000 $25.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 6,540.000 $3.250 $8.010 $15.000 $7.000 $7.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 1,350.000 $15.000 $20.100 $25.000 $16.500 $10.000
DRIVEWAYS (CONC)
SY 179.000 $98.000 $106.500 $100.000 $133.000 $125.000
DRIVEWAYS (ACP)
SY 977.000 $34.000 $72.390 $33.500 $61.000 $40.000
TURNOUTS (ACP)
SY 138.000 $50.000 $135.140 $41.300 $105.000 $40.000
DRIVEWAYS (BASE)
SY 590.000 $12.000 $11.690 $35.000 $47.000 $25.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 93,150.000 $0.120 $0.210 $0.150 $0.230 $0.250
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 46,575.000 $0.270 $0.250 $0.160 $0.230 $0.350
MTL W-BEAM GD FEN (STEEL POST)
LF 1,850.000 $25.000 $21.300 $21.500 $23.250 $23.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 600.000 $15.000 $12.780 $12.000 $15.000 $15.000
MTL THRIE-BEAM GD FEN ADJUSTMENT
LF 4.000 $200.000 $639.000 $500.000 $850.000 $550.000
REMOVE METAL BEAM GUARD FENCE
LF 9,062.500 $3.100 $2.130 $2.000 $3.750 $2.500
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $245.000 $319.500 $150.000 $125.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 18.000 $2,575.000 $2,662.500 $2,500.000 $2,480.000 $2,600.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 8.000 $1,000.000 $1,570.880 $1,000.000 $1,000.000 $1,200.000
CRASH CUSH ATTEN (DES SOURCE)
EA 2.000 $1,750.000 $4,473.000 $2,000.000 $3,000.000 $2,300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 16.000 $1,400.000 $2,662.500 $2,000.000 $2,850.000 $2,300.000
CRASH CUSH ATTEN (STKPL)
EA 2.000 $900.000 $1,278.000 $1,000.000 $900.000 $1,200.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 30.000 $300.000 $257.160 $240.000 $240.000 $300.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 2.000 $325.000 $361.660 $270.000 $270.000 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 26.000 $460.000 $625.770 $560.000 $560.000 $600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $550.000 $656.920 $590.000 $590.000 $700.000
REMOVE SM RD SN SUP&AM
EA 28.000 $80.000 $144.030 $70.000 $70.000 $200.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 23.000 $25.000 $25.560 $15.000 $28.000 $25.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 86.000 $55.000 $69.100 $45.000 $40.000 $65.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 34.000 $28.000 $41.540 $25.000 $45.000 $35.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,800.000 $0.480 $0.530 $0.500 $0.500 $0.550
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 240.000 $3.500 $3.200 $3.000 $3.000 $3.300
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 48.000 $20.000 $53.250 $50.000 $50.000 $55.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 11,220.000 $0.250 $0.270 $0.250 $0.250 $0.300
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 32,086.000 $0.270 $0.270 $0.250 $0.250 $0.300
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 9,015.000 $0.850 $1.650 $1.450 $1.000 $2.000
REFL PAV MRK TY I (W)8"(BRK)(090MIL)
LF 70.000 $0.850 $1.070 $1.500 $1.000 $1.100
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 2,800.000 $0.850 $0.910 $0.850 $0.850 $1.000
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 284.000 $9.500 $6.390 $6.000 $6.000 $7.000
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 4.000 $124.000 $153.360 $144.000 $144.000 $160.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 4.000 $120.000 $188.510 $177.000 $177.000 $200.000
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 48.000 $36.000 $63.900 $60.000 $60.000 $70.000
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
LF 800.000 $3.700 $4.260 $4.000 $4.000 $5.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 109,467.000 $0.380 $0.450 $0.420 $0.420 $0.460
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 11,220.000 $0.400 $0.510 $0.480 $0.480 $0.520
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 32,086.000 $0.400 $0.470 $0.440 $0.440 $0.480
REFL PAV MRKR TY I-C
EA 44.000 $3.700 $4.260 $4.000 $4.000 $5.000
REFL PAV MRKR TY II-A-A
EA 962.000 $3.400 $3.830 $3.600 $3.600 $5.000
THERMOPLASTIC PIPE (SIZE)(PP)
LF 24.000 $45.000 $0.000 $0.000 $0.000 $0.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $17,487.630 $19,500.000 $16,250.000 $20,000.000
TMA (STATIONARY)
DAY 192.000 $185.000 $371.500 $300.000 $255.000 $300.000
TMA (MOBILE OPERATION)
HR 80.000 $75.000 $102.040 $50.000 $68.000 $80.000
1
RC PIPE (CL III)(12 IN)
LF 24.000 $45.000 $47.930 $45.000 $37.000 $40.000
Totals: $8,341,260.670 $7,901,676.769 $8,389,347.970 $9,442,983.895 $9,462,322.970