Show Job Controls
Bid Cobra

RED RIVER US 82 (0046-01-064)

Items: 120

County: RED RIVER
Length: N/A
Highway: US 82
District: PARIS
Control Number: 0046-01-064
DBE Goal: N/A
Project: NH 2019(724)
Guaranty: N/A
Time: 367 WORKING DAYS
Engineer's Estimate: $12,485,245.92
Date: 04/02/2019 (7 years ago)
Contract Number: N/A
Type: WIDEN NON-FREEWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$12,485,245.92
1
$14,202,161.56
Over/Under Est: 13.75% $1,716,915.64
Over/Under Est: 21.02% $2,624,641.70
Amt Left: 6.39% $907,726.06
Over/Under Est: 26.15% $3,264,961.52
Amt Left: 10.9% $1,548,045.88
Delta: -4.24% -$640,319.82
$15,874,842.31
Over/Under Est: 27.15% $3,389,596.39
Amt Left: 11.78% $1,672,680.75
Delta: -0.79% -$124,634.87

Bid Items & Bid Tabulations

120 Total 0 of 120
RED RIVER  |  US 82  |  PARIS  |  0046-01-064  |  04/02/2019  |  $12,485,245.92  |  NH 2019(724)  |  WIDEN NON-FREEWAY  |  367 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
D. L. LENNON INCORPORATED - CONTRACTOR
LONGVIEW BRIDGE AND ROAD, LTD.
EAST TEXAS BRIDGE, INC.
PREPARING ROW
STA 888.000 $505.000 $312.000 $496.000 $445.000 $700.000
REMOVING CONC (DRIVEWAYS)
SY 58.000 $16.000 $15.750 $30.000 $22.000 $25.000
REMOVING CONCRETE(MOW STRIP)
LF 600.000 $6.000 $15.750 $30.000 $12.000 $10.000
OBLITERATING ABANDONED ROAD
SY 314.000 $3.250 $13.650 $40.000 $15.000 $10.000
EXCAVATION (ROADWAY)
CY 19,752.000 $6.500 $8.030 $8.000 $8.500 $8.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 13,577.000 $7.750 $8.030 $8.000 $10.000 $12.000
BACKFILL (TY A)
STA 704.760 $270.000 $155.000 $300.000 $225.000 $375.000
BROADCAST SEED (TEMP) (WARM)
SY 119,582.000 $0.090 $0.040 $0.040 $0.120 $0.050
BROADCAST SEED (TEMP) (COOL)
SY 119,582.000 $0.090 $0.040 $0.040 $0.130 $0.050
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
SY 239,153.000 $0.250 $0.180 $0.170 $0.240 $0.190
VEGETATIVE WATERING
MG 3,587.000 $15.000 $15.600 $12.000 $1.000 $4.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 1,800.000 $1.500 $1.160 $1.100 $1.400 $1.250
PROOF ROLLING
HR 40.000 $73.000 $52.500 $50.000 $100.000 $50.000
FL BS (RDWY DEL) (TY A GR 4)
TON 17,584.000 $18.000 $39.590 $38.000 $33.000 $33.000
REWORK BS MTL (TY C) (8") (ORD COMP)
SY 34,280.000 $2.000 $2.260 $3.350 $1.750 $3.500
CEMENT
TON 820.000 $135.000 $168.000 $175.000 $210.000 $170.000
CEM TRT (MX EXST & NW BS MTL)(DC)(8")
SY 57,884.000 $1.470 $2.360 $3.650 $2.250 $3.000
SALV HAUL & STKPL RCL APH PV (6")
SY 34,280.000 $2.400 $3.970 $6.300 $3.600 $4.200
PRIME COAT (RC-250)
GAL 16,208.000 $5.090 $6.830 $8.500 $4.800 $6.250
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 413.000 $83.000 $131.250 $115.000 $200.000 $170.000
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
TON 1,904.000 $95.000 $125.000 $130.000 $125.000 $110.000
D-GR HMA TY-B PG64-22
TON 12,735.000 $73.000 $102.500 $107.500 $102.500 $106.000
D-GR HMA TY-C SAC-A PG64-22
TON 62,899.000 $72.000 $102.000 $107.000 $102.000 $105.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 3,200.000 $100.000 $63.000 $68.000 $85.000 $70.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 11,000.000 $150.000 $97.200 $102.200 $130.000 $100.000
PLAN & TEXT ASPH CONC PAV(0" TO 6")
SY 6,647.000 $2.500 $3.410 $3.350 $5.450 $5.000
PLAN & TEXT ASPH CONC PAV (0" TO 10")
SY 5,231.000 $6.650 $5.460 $3.880 $6.850 $6.000
TEMPORARY SPL SHORING
SF 2,190.000 $30.000 $56.200 $55.300 $35.000 $40.000
CL A CONC (COLLAR)
EA 9.000 $400.000 $787.500 $850.000 $1,150.000 $1,000.000
CL A CONC (PLUG)
EA 2.000 $1,200.000 $892.500 $500.000 $1,400.000 $1,000.000
RIPRAP (CONC)(5 IN)
CY 178.000 $550.000 $498.750 $475.000 $435.000 $500.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 66.000 $200.000 $333.170 $115.000 $175.000 $120.000
RIPRAP (MOW STRIP)(4 IN)
CY 299.000 $415.000 $420.000 $400.000 $500.000 $420.000
RETROFIT RAIL (TY T631)
LF 500.000 $96.000 $102.900 $85.000 $110.000 $95.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 38.000 $409.000 $393.750 $375.000 $485.000 $500.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 29.000 $530.000 $472.500 $450.000 $550.000 $700.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 10.000 $560.000 $525.000 $500.000 $745.000 $750.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 82.000 $635.000 $577.500 $550.000 $550.000 $700.000
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
LF 32.000 $815.000 $682.500 $650.000 $880.000 $800.000
CONC BOX CULV (10 FT X 3 FT)(EXTEND)
LF 38.000 $950.000 $787.500 $750.000 $875.000 $800.000
RC PIPE (CL III)(18 IN)
LF 824.000 $45.000 $42.000 $40.000 $41.000 $45.000
RC PIPE (CL III)(24 IN)
LF 336.000 $58.000 $57.750 $55.000 $50.000 $60.000
RC PIPE (CL III)(30 IN)
LF 110.000 $75.000 $89.250 $85.000 $90.000 $95.000
RC PIPE (CL III)(36 IN)
LF 32.000 $115.000 $126.000 $120.000 $130.000 $120.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 4.000 $3,664.000 $3,937.500 $3,750.000 $5,000.000 $4,500.000
WINGWALL (PW - 2) (HW=3 FT)
EA 1.000 $2,625.000 $7,875.000 $7,500.000 $6,500.000 $4,500.000
WINGWALL (PW - 2) (HW=4 FT)
EA 2.000 $5,500.000 $8,400.000 $8,000.000 $5,800.000 $4,500.000
WINGWALL (PW - 2) (HW=5 FT)
EA 1.000 $6,700.000 $12,075.000 $11,500.000 $8,000.000 $6,500.000
WINGWALL (PW - 2) (HW=6 FT)
EA 4.000 $8,500.000 $13,125.000 $12,500.000 $11,000.000 $9,500.000
WINGWALL (PW - 2) (HW=7 FT)
EA 2.000 $10,966.000 $16,275.000 $15,500.000 $11,000.000 $12,000.000
WINGWALL (PW - 2) (HW=8 FT)
EA 2.000 $14,420.000 $18,900.000 $18,000.000 $17,500.000 $17,000.000
WINGWALL (PW - 2) (HW=9 FT)
EA 1.000 $25,350.000 $22,575.000 $21,500.000 $20,000.000 $18,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 56.000 $576.000 $892.500 $850.000 $590.000 $585.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 20.000 $1,075.000 $1,102.500 $1,050.000 $940.000 $1,000.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $1,300.000 $1,312.500 $1,250.000 $1,075.000 $1,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 1.000 $2,050.000 $1,937.250 $1,845.000 $1,750.000 $2,000.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $3,541.000 $4,383.750 $4,175.000 $3,500.000 $4,000.000
REMOV STR (WINGWALL)
EA 7.000 $750.000 $787.500 $750.000 $1,200.000 $1,000.000
REMOV STR (HEADWALL)
EA 7.000 $641.000 $787.500 $750.000 $1,200.000 $1,000.000
REMOV STR (BOX CULVERT)
LF 4.000 $175.000 $105.000 $100.000 $650.000 $250.000
REMOV STR (PIPE)
EA 37.000 $240.000 $5.250 $5.000 $275.000 $500.000
MOBILIZATION
LS 1.000 $743,418.110 $325,000.000 $360,541.000 $1,500,000.000 $1,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 23.000 $3,000.000 $4,853.840 $4,967.000 $6,000.000 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 1,370.000 $23.000 $31.500 $30.000 $50.000 $50.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 150.000 $35.000 $35.700 $34.000 $100.000 $80.000
ROCK FILTER DAMS (REMOVE)
LF 1,520.000 $12.000 $7.350 $7.000 $1.000 $33.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 57.000 $50.000 $283.340 $50.000 $250.000 $50.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,070.000 $2.650 $0.250 $2.400 $3.300 $3.300
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,070.000 $1.050 $0.530 $0.500 $1.400 $1.400
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 975.000 $5.250 $12.030 $25.000 $12.000 $50.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 800.000 $20.000 $8.350 $25.000 $8.000 $10.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 975.000 $10.000 $12.030 $25.000 $12.000 $12.000
INTERSECTIONS (ACP)
SY 5,830.000 $40.000 $16.260 $22.000 $23.000 $20.000
DRIVEWAYS (CONC)
SY 58.000 $72.000 $89.250 $90.000 $115.000 $100.000
TURNOUTS (ACP)
SY 72.000 $35.000 $174.000 $195.000 $100.000 $35.000
DRIVEWAYS (BASE)
SY 1,733.000 $12.000 $31.500 $22.000 $12.000 $12.000
DRIVEWAYS (ACP)(TYPE 1)
SY 710.000 $37.000 $54.530 $47.000 $50.000 $35.000
DRIVEWAYS (ACP) (TYPE 2)
SY 6,718.000 $31.000 $24.770 $31.000 $32.000 $35.000
RUMBLE STRIPS (SHOULDER)
LF 190,976.000 $0.130 $0.170 $0.280 $0.150 $0.200
RUMBLE STRIPS (CENTERLINE)
LF 88,938.000 $0.120 $0.170 $0.280 $0.160 $0.200
MTL W-BEAM GD FEN (STEEL POST)
LF 1,950.000 $22.680 $22.050 $22.500 $24.750 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,770.000 $1,837.500 $1,950.000 $1,880.000 $1,875.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 400.000 $10.000 $15.750 $10.000 $11.000 $11.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 1.000 $1,150.000 $945.000 $1,000.000 $1,100.000 $1,100.000
REMOVE METAL BEAM GUARD FENCE
LF 2,645.000 $3.450 $2.100 $2.000 $2.200 $2.200
GUARDRAIL END TREATMENT (INSTALL)
EA 22.000 $2,196.000 $2,835.000 $2,550.000 $2,800.000 $2,800.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 4.000 $1,110.000 $1,155.000 $1,000.000 $1,100.000 $1,100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 24.000 $205.000 $210.000 $200.000 $220.000 $220.000
CRASH CUSH ATTEN (DES SOURCE)
EA 4.000 $1,677.000 $3,675.000 $3,000.000 $3,300.000 $3,300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $1,400.000 $3,937.500 $3,000.000 $3,300.000 $3,300.000
CRASH CUSH ATTEN (STKPL)
EA 6.000 $589.000 $1,312.500 $1,000.000 $1,100.000 $1,100.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $24,000.000 $21,735.000 $19,950.000 $24,000.000 $22,000.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 13.000 $217.000 $267.750 $450.000 $355.000 $250.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 17.000 $445.000 $572.250 $600.000 $635.000 $600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $568.000 $667.800 $800.000 $850.000 $900.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $665.000 $932.400 $1,200.000 $990.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 20.000 $55.000 $152.250 $110.000 $120.000 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $22.000 $25.200 $25.000 $22.000 $25.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 28.000 $56.000 $105.000 $45.000 $50.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 107.000 $39.000 $30.450 $25.000 $27.500 $30.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 100,400.000 $0.170 $0.110 $0.100 $0.110 $0.110
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 100,400.000 $0.170 $0.110 $0.100 $0.110 $0.110
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 154.000 $0.630 $1.000 $1.000 $1.200 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 10,119.000 $1.000 $1.000 $1.000 $1.200 $2.000
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 646.000 $1.050 $1.050 $1.000 $1.100 $1.100
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 2,328.000 $0.790 $8.400 $8.000 $8.800 $8.800
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 252.000 $7.200 $5.780 $5.500 $6.000 $6.000
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 13.000 $132.000 $126.000 $120.000 $130.000 $140.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 9.000 $146.000 $147.000 $140.000 $155.000 $155.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 7,440.000 $0.750 $0.530 $0.500 $0.550 $0.550
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 188,034.000 $0.800 $0.380 $0.360 $0.400 $0.400
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 12,910.000 $0.350 $0.530 $0.500 $0.550 $0.550
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 136,467.000 $0.360 $0.400 $0.380 $0.420 $0.420
REFL PAV MRKR TY I-C
EA 468.000 $2.600 $3.360 $3.200 $3.500 $3.500
REFL PAV MRKR TY II-A-A
EA 5,130.000 $2.460 $3.360 $3.200 $3.500 $3.500
ELIM EXT PAV MRK & MRKS (4")
LF 125,500.000 $0.550 $1.540 $0.380 $0.750 $2.000
FULL - WIDTH MOWING
CYC 4.000 $30,000.000 $17,500.000 $5,000.000 $5,000.000 $10,000.000
MEMBRANE UNDERSEAL
GAL 7,934.000 $2.700 $5.550 $6.500 $7.250 $4.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,569.000 $6,000.000 $18,000.000 $15,000.000 $20,000.000
TMA (STATIONARY)
DAY 295.000 $166.000 $400.000 $750.000 $120.000 $300.000
Totals: $12,485,245.920 $14,202,161.560 $15,109,887.620 $15,750,207.440 $15,874,842.310