Show Job Controls
Bid Cobra

REAGAN SH 137 (0494-10-017)

Items: 107

County: REAGAN
Length: N/A
Highway: SH 137
District: SAN ANGELO
Control Number: 0494-10-017
DBE Goal: N/A
Project: F 2022(653)
Guaranty: N/A
Time: 430 WORKING DAYS
Engineer's Estimate: $24,085,404.91
Date: 06/01/2022 (4 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$24,085,404.91
1
$29,854,259.38
Over/Under Est: 23.95% $5,768,854.47
$32,240,907.99
Over/Under Est: 33.86% $8,155,503.08
Amt Left: 7.99% $2,386,648.61
Subcontractor Percentage Amount
BEAVER CONTRACTORS, LLC 5.80% $1,865,490.90
W. S. CONSTRUCTION COMPANY 4.13% $1,328,358.18
BARRICADES UNLIMITED 0.99% $318,420.00
TRP CONSTRUCTION GROUP, LLC 0.99% $318,420.00
DIIBS SPECIALISTS, LLC 0.66% $212,280.00
CONTRACTORS SERVICE, LTD. 0.35% $112,572.73
J. H. ODEN CONTRACTING COMPANY 0.19% $61,110.91
SURFACE PREPARATION TECHNOLOGIES, LLC 0.07% $22,514.55
Total: 13.18% $4,239,167.27

Bid Items & Bid Tabulations

107 Total 0 of 107
REAGAN  |  SH 137  |  SAN ANGELO  |  0494-10-017  |  06/01/2022  |  $24,085,404.91  |  F 2022(653)  |  HWY IMPRV  |  430 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
DELHUR INDUSTRIES, INC.
PREPARING ROW
STA 683.000 $500.000 $174.660 $1,764.130
REMOVING CONC (RIPRAP)
SY 20.000 $10.000 $363.330 $55.000
REMOVING CONC (DRIVEWAYS)
SY 746.000 $9.000 $56.940 $22.000
REMOVING STAB BASE & ASPH PAV (10"-12")
SY 40,364.000 $3.000 $1.990 $2.460
EXCAVATION (ROADWAY)
CY 39,036.000 $15.000 $12.950 $12.930
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 80,735.000 $20.000 $16.240 $10.180
BACKFILL (TY A OR B)
STA 695.000 $100.000 $125.900 $388.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 206,266.000 $0.150 $0.180 $0.190
DRILL SEEDING (TEMP) (WARM)
SY 103,133.000 $0.120 $0.130 $0.130
DRILL SEEDING (TEMP) (COOL)
SY 103,133.000 $0.110 $0.130 $0.130
FL BS (CMP IN PLC)(TY A GR 5)(6")
SY 4,121.000 $27.000 $15.890 $9.520
FL BS (RDWY DEL)(TY A GR 5)
TON 112,658.000 $15.000 $17.470 $28.570
FL BS (CMP IN PLC)(TY A GR 5)(9")
SY 52,566.000 $11.000 $15.400 $14.290
FOG SEAL (CSS-1H)
GAL 24,244.000 $4.000 $7.060 $4.540
ASPH (CRS-2P)
GAL 96,795.000 $3.500 $4.250 $4.810
AGGR(TY-PB GR-3 SAC-B)
CY 5,333.000 $92.000 $220.810 $136.900
ASPH (AC-20-5TR OR AC-20XP)
GAL 60,581.000 $4.250 $5.390 $5.360
CONC PVMT (CONT REINF - CRCP) (12")
SY 176.000 $75.000 $180.600 $189.200
CEM STABIL BKFL
CY 365.000 $165.000 $374.980 $379.020
CUT & RESTORING PAV
SY 870.000 $95.000 $120.760 $72.000
TRENCH EXCAVATION PROTECTION
LF 246.000 $15.000 $10.750 $10.870
TEMPORARY SPL SHORING
SF 20,281.000 $15.000 $22.650 $60.500
RIPRAP (CONC)(4 IN)
CY 9.000 $500.000 $705.600 $713.210
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 143.000 $80.000 $192.420 $60.000
RIPRAP (MOW STRIP)(4 IN)
CY 135.000 $500.000 $716.350 $770.000
GABIONS (3' X 3')(GALV)
CY 56.000 $275.000 $317.340 $110.000
CONC BOX CULV (7 FT X 4 FT)
LF 98.000 $525.000 $797.880 $1,079.550
CONC BOX CULV (8 FT X 4 FT)
LF 186.000 $550.000 $889.280 $1,197.750
CONC BOX CULV (10 FT X 4 FT)
LF 275.000 $850.000 $1,164.800 $1,578.130
RC PIPE (CL III)(18 IN)
LF 406.000 $60.000 $112.490 $135.430
RC PIPE (CL III)(24 IN)
LF 358.000 $80.000 $141.720 $173.130
RC PIPE (CL III)(36 IN)
LF 924.000 $130.000 $211.610 $276.380
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 10.000 $5,500.000 $9,206.400 $9,305.730
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 12.000 $7,800.000 $10,550.400 $10,664.230
WINGWALL (PW - 1) (HW=6 FT)
EA 4.000 $20,000.000 $24,796.800 $25,064.330
WINGWALL (PW - 2) (HW=6 FT)
EA 2.000 $13,000.000 $24,864.000 $25,132.250
SET (TY II) (18 IN) (RCP) (4: 1) (P)
EA 137.000 $1,215.000 $1,948.800 $1,969.830
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,300.000 $1,948.800 $1,969.830
CLEAN EXIST CULVERTS
EA 2.000 $2,100.000 $2,419.200 $2,445.300
REMOV STR (PIPE)
EA 6.000 $500.000 $1,048.320 $1,179.300
MOBILIZATION
LS 1.000 $2,183,400.000 $1,058,740.600 $1,106,572.600
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $6,500.000 $15,688.400 $28,341.270
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 1,563.000 $30.000 $56.740 $36.300
ROCK FILTER DAMS (REMOVE)
LF 1,563.000 $11.000 $16.990 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 110.000 $3.800 $4.200 $4.400
TEMP SEDMT CONT FENCE (REMOVE)
LF 110.000 $0.900 $1.050 $1.100
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 45,457.000 $7.000 $4.200 $6.600
BIODEG EROSN CONT LOGS (REMOVE)
LF 45,457.000 $1.000 $1.870 $1.100
CONSTRUCTING DETOURS
SY 5,506.000 $61.000 $47.620 $66.000
ONE-WAY TRAF CONT (PILOT CAR)
HR 1,492.000 $100.000 $172.160 $264.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 6.000 $5,000.000 $6,776.440 $3,685.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 7,040.000 $35.000 $99.180 $76.300
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $50.000 $134.630 $94.500
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 18,040.000 $6.000 $11.900 $4.800
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 520.000 $12.000 $38.740 $7.200
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 7,040.000 $6.700 $14.820 $9.600
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $9.000 $41.800 $9.600
DRIVEWAYS (CONC)
SY 746.000 $100.000 $172.400 $145.200
DRIVEWAYS AND TURNOUTS (SURF TREAT)
SY 6,259.000 $25.000 $55.860 $39.840
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 136,548.000 $0.190 $0.090 $0.090
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 68,274.000 $0.190 $0.090 $0.090
MTL W-BEAM GD FEN (STEEL POST)
LF 1,750.000 $35.000 $36.750 $41.800
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 100.000 $50.000 $28.350 $58.300
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,000.000 $3,202.500 $3,850.000
MAILBOX INSTALL-D (TWG-POST) TY 1
EA 4.000 $280.000 $504.000 $440.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 1.000 $660.000 $766.500 $770.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 6.000 $225.000 $388.500 $330.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 93.000 $600.000 $703.500 $1,072.500
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 34.000 $710.000 $819.000 $1,204.500
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $880.000 $1,018.500 $1,413.500
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 6.000 $800.000 $1,417.500 $1,683.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 5.000 $1,000.000 $1,312.500 $1,727.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 35.000 $31.000 $25.200 $165.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 12.000 $90.000 $131.250 $137.500
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 37,964.000 $0.650 $0.950 $0.990
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 75.000 $3.800 $21.000 $22.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 24,004.000 $0.650 $0.950 $0.990
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,710.000 $0.700 $10.640 $2.200
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 1,416.000 $1.250 $1.050 $1.100
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,748.000 $0.660 $1.370 $1.430
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 347.000 $7.000 $8.400 $8.800
REFL PAV MRK TY II (W) 4" (BRK)
LF 8,012.000 $0.140 $0.160 $0.170
REFL PAV MRK TY II (W) 4" (DOT)
LF 1,416.000 $0.500 $0.530 $0.550
REFL PAV MRK TY II (W) 4" (SLD)
LF 135,468.000 $0.100 $0.130 $0.130
REFL PAV MRK TY II (W) 8" (SLD)
LF 1,748.000 $0.300 $0.530 $0.550
REFL PAV MRK TY II (W) 24" (SLD)
LF 347.000 $2.750 $2.100 $2.200
REFL PAV MRK TY II (Y) 4" (SLD)
LF 223,536.000 $0.130 $0.120 $0.120
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 8,012.000 $0.300 $0.550 $0.570
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 135,468.000 $0.300 $0.530 $0.550
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 223,536.000 $0.300 $0.530 $0.550
PREFAB PAV MRK TY C (W) (ARROW)
EA 6.000 $205.000 $315.000 $330.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 8.000 $280.000 $787.500 $825.000
PREFAB PAV MRK TY C (W) (WORD)
EA 6.000 $230.000 $472.500 $495.000
REFL PAV MRKR TY I-C
EA 600.000 $3.500 $4.200 $4.400
REFL PAV MRKR TY II-A-A
EA 2,795.000 $3.000 $3.680 $3.850
ELIM EXT PAV MRK & MRKS (4")
LF 1,486.000 $0.500 $2.100 $2.200
FULL - WIDTH MOWING
CYC 2.000 $3,900.000 $6,647.870 $110,000.000
LITTER REMOVAL
CYC 2.000 $1,800.000 $18,124.820 $55,000.000
SP MIXES SP-B SAC-B PG64-22
TON 57,626.000 $95.000 $103.000 $113.170
SP MIXES SP-C SAC-A PG70-22
TON 37,699.000 $100.000 $129.310 $129.660
TACK COAT
GAL 42,045.000 $3.000 $5.000 $4.060
CEMENT
TON 777.000 $195.000 $388.000 $302.500
ASPHALT BINDER (PG 64-22)
TON 1,825.000 $570.000 $1,250.370 $964.550
FOAMED ASPHALT TREAT (9")(DC)
SY 346,043.000 $3.000 $5.710 $4.080
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 870.000 $100.000 $74.120 $110.000
TMA (STATIONARY)
DAY 439.000 $200.000 $231.710 $168.000
TMA (MOBILE OPERATION)
DAY 30.000 $200.000 $511.280 $1,045.000
Totals: $24,085,404.910 $29,854,259.380 $32,240,907.990