Show Job Controls
Bid Cobra

RANDALL SL 335 (2635-02-038)

Items: 62

County: RANDALL
Length: N/A
Highway: SL 335
District: AMARILLO
Control Number: 2635-02-038
DBE Goal: 200.0%
Project: STP 2B24(243)VRU
Guaranty: N/A
Time: 97 WORKING DAYS
Engineer's Estimate: $7,187,371.00
Date: 07/09/2024 (1 year ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
JOE CHAPPELL
CC SYSOMBATH
WES KIMMELL
DARRELL CALDWELL
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$7,187,371.00
Over/Under Est: -3.62% -$260,272.47
$8,099,052.30
Over/Under Est: 12.68% $911,681.30
Amt Left: 16.92% $1,171,953.77
$8,673,130.75
Over/Under Est: 20.67% $1,485,759.75
Amt Left: 25.21% $1,746,032.22
Delta: -7.09% -$574,078.45
$8,940,269.21
Over/Under Est: 24.39% $1,752,898.21
Amt Left: 29.06% $2,013,170.68
Delta: -3.08% -$267,138.46
$9,017,665.50
Over/Under Est: 25.47% $1,830,294.50
Amt Left: 30.18% $2,090,566.97
Delta: -0.87% -$77,396.29
Subcontractor Percentage Amount
J. LEE MILLIGAN, INC. 25.36% $1,766,996.28
TRP CONSTRUCTION GROUP, LLC 1.59% $110,785.65
DK CONTRACTING, LLC 0.65% $45,289.73
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 0.65% $45,289.73
URBAN HEIGHTS INVESTMENTS LLC 0.21% $14,632.07
BARRICADES UNLIMITED 0.20% $13,935.30
PROFESSIONAL TRAFFIC CONTROL LLC 0.18% $12,541.77
Total: 28.84% $2,009,470.53

Bid Items & Bid Tabulations

62 Total 0 of 62
RANDALL  |  SL 335  |  AMARILLO  |  2635-02-038  |  07/09/2024  |  $7,187,371.00  |  STP 2B24(243)VRU  |  HAZARD ELIM & SAFETY  |  97 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
L A FULLER & SONS CONSTRUCTION, LTD.
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
RK HALL, LLC
DUININCK, INC.
PREPARING ROW
STA 149.000 $20.000 $0.010 $16.000 $50.000 $53.080 $150.000
EXCAVATION (ROADWAY)
CY 9,618.000 $20.000 $8.500 $22.400 $20.000 $18.670 $11.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 20,213.000 $27.500 $17.750 $27.000 $30.000 $24.160 $33.500
BACKFILL (TY A)
STA 149.000 $225.000 $227.350 $285.000 $400.000 $262.430 $365.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 34.000 $800.000 $640.870 $600.000 $600.000 $632.500 $660.000
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 34.000 $1,100.000 $586.200 $465.000 $500.000 $484.000 $505.000
FL BS (CMP IN PLC)(TY A OR B GR 4)(6")
SY 37,713.000 $20.000 $10.900 $18.000 $30.000 $23.460 $32.000
REWORK BS MTL (TY B)(18")(DENS CONT)
SY 14,834.000 $18.000 $14.840 $25.750 $25.000 $39.880 $25.250
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 267.000 $340.000 $392.920 $395.000 $450.000 $446.010 $430.000
LIME TRT (EXST MATL)(8")
SY 22,785.000 $6.000 $4.880 $7.500 $7.500 $8.210 $10.000
PRIME COAT (MC-30)
GAL 9,429.000 $6.000 $8.050 $5.300 $5.750 $4.730 $5.250
EMULS ASPH (EROSN CONT)(MULTI)
GAL 3,157.000 $6.000 $8.800 $5.250 $8.500 $4.120 $5.800
PLANE ASPH CONC PAV(0" TO 2")
SY 4,475.000 $7.000 $5.600 $6.100 $10.000 $5.610 $7.200
RIPRAP (CONC)(4 IN)
CY 13.800 $800.000 $830.200 $960.000 $1,200.000 $880.000 $915.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 12.000 $1,085.000 $1,790.800 $1,700.000 $2,250.000 $1,540.000 $1,600.000
RC PIPE (CL III)(30 IN)
LF 60.000 $200.000 $209.350 $255.000 $350.000 $176.000 $185.000
RC PIPE (CL III)(36 IN)
LF 36.000 $250.000 $252.250 $335.000 $400.000 $253.000 $265.000
RC PIPE (CL IV)(24 IN)
LF 41.000 $200.000 $158.800 $135.000 $340.000 $159.500 $165.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (C)
EA 1.000 $10,000.000 $20,671.950 $26,000.000 $25,000.000 $33,000.000 $34,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $2,500.000 $3,847.750 $4,400.000 $3,500.000 $2,475.000 $2,600.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 3.000 $4,150.000 $3,854.900 $4,400.000 $5,500.000 $3,850.000 $4,000.000
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 3.000 $8,500.000 $8,365.900 $6,700.000 $7,500.000 $4,675.000 $4,900.000
CLEAN EXIST CULVERTS
EA 4.000 $4,000.000 $1,823.900 $1,600.000 $2,800.000 $5,500.000 $5,700.000
REMOV STR (SET)
EA 10.000 $1,000.000 $780.250 $1,620.000 $500.000 $825.000 $860.000
REMOV STR (PIPE)
LF 23.000 $50.000 $123.000 $115.000 $185.000 $16.500 $17.000
REMOV STR (BOX CULVERT)
LF 4.000 $160.000 $1,139.700 $500.000 $300.000 $110.000 $115.000
REMOV STR (DRIVEWAY CULVERT)
EA 2.000 $1,250.000 $2,535.900 $2,400.000 $2,500.000 $550.000 $575.000
MOBILIZATION
LS 1.000 $580,000.000 $658,680.350 $800,000.000 $854,000.000 $894,026.920 $860,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $22,500.000 $3,642.950 $35,000.000 $25,000.000 $22,470.050 $42,500.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 500.000 $6.000 $15.080 $10.000 $6.000 $5.230 $5.450
BIODEG EROSN CONT LOGS (REMOVE)
LF 500.000 $3.000 $1.790 $4.000 $2.000 $1.650 $1.700
DRIVEWAYS (ACP)
SY 1,227.000 $60.000 $64.000 $53.000 $35.000 $39.560 $57.500
RUMBLE STRIPS (SHOULDER)
LF 27,580.000 $0.400 $0.080 $0.500 $0.300 $0.250 $0.100
RUMBLE STRIPS (CENTERLINE)
LF 23,060.000 $0.400 $0.080 $0.500 $0.450 $0.250 $0.100
RELOCATE EXISTING MAILBOX
EA 6.000 $200.000 $379.500 $640.000 $350.000 $379.500 $395.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 6.000 $1,000.000 $915.200 $920.000 $850.000 $915.200 $955.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $1,125.000 $953.700 $945.000 $300.000 $953.700 $995.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 7.000 $1,575.000 $1,347.500 $1,270.000 $1,250.000 $1,347.500 $1,400.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,275.000 $1,546.600 $1,435.000 $1,450.000 $1,546.600 $1,600.000
RELOCATE SM RD SN SUP&AM TY S80
EA 5.000 $300.000 $925.100 $855.000 $900.000 $925.100 $965.000
REMOVE SM RD SN SUP&AM
EA 13.000 $200.000 $168.700 $230.000 $100.000 $275.000 $115.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 104.000 $150.000 $124.300 $270.000 $120.000 $124.300 $130.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 14.000 $150.000 $130.900 $270.000 $125.000 $130.900 $135.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 14,380.000 $0.400 $0.660 $0.650 $0.600 $0.660 $0.690
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 720.000 $2.000 $5.850 $1.750 $1.500 $3.330 $1.700
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 2,245.000 $2.000 $1.100 $1.050 $1.000 $1.100 $1.150
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 130.000 $10.000 $11.000 $10.600 $10.000 $11.000 $11.500
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 8.000 $175.000 $247.500 $240.000 $225.000 $247.500 $260.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 8.000 $210.000 $330.000 $320.000 $300.000 $330.000 $345.000
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 34,015.000 $0.650 $0.770 $0.750 $0.700 $0.770 $0.800
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 5,270.000 $0.750 $0.820 $0.800 $0.750 $0.830 $0.860
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 31,885.000 $0.650 $0.770 $0.750 $0.700 $0.770 $0.800
D-GR HMA TY-B SAC-B PG64-22
TON 12,894.000 $140.000 $154.080 $160.000 $165.000 $179.780 $165.000
TACK COAT
GAL 9,378.000 $7.000 $8.050 $8.500 $6.000 $7.130 $9.000
SP MIXES SP-D SAC-A PG70-28
TON 10,833.000 $161.000 $165.860 $180.000 $180.000 $206.280 $195.000
TACK COAT
GAL 159.000 $7.000 $9.200 $8.500 $15.000 $11.460 $9.000
UNDERSEAL COURSE
GAL 23,995.000 $7.000 $13.330 $5.100 $7.500 $6.740 $5.400
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $17,500.000 $42,790.350 $31,000.000 $18,500.000 $13,346.910 $17,000.000
TMA (STATIONARY)
DAY 95.000 $350.000 $654.550 $515.000 $600.000 $698.210 $285.000
TMA (MOBILE OPERATION)
HR 40.000 $100.000 $106.200 $100.000 $75.000 $104.930 $125.000
REC REFL PAV MRKR TY I-C
EA 116.000 $38.000 $49.500 $47.650 $45.000 $49.500 $51.500
REC REFL PAV MRKR TY II-A-A
EA 980.000 $38.000 $44.000 $42.350 $40.000 $44.000 $46.000
Totals: $7,187,371.000 $6,927,098.530 $8,099,052.300 $8,673,130.750 $8,940,269.210 $9,017,665.500