PREPARING ROW
|
AC
|
1.490
|
$3,000.000
|
$66,929.000
|
$20,000.000
|
$50,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
1,233.000
|
$15.000
|
$11.000
|
$38.300
|
$25.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
14,331.000
|
$11.000
|
$9.700
|
$7.500
|
$25.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
25.000
|
$16.000
|
$52.900
|
$24.000
|
$25.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
25,040.000
|
$6.000
|
$4.300
|
$3.350
|
$10.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
3,594.000
|
$8.000
|
$4.400
|
$4.650
|
$10.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
1,027.000
|
$50.000
|
$20.900
|
$22.500
|
$40.000
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
372.000
|
$50.000
|
$89.900
|
$23.000
|
$60.000
|
|
|
REMOVING CONC (PAVERS)
|
SY
|
223.000
|
$14.000
|
$27.400
|
$11.300
|
$60.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
12,881.000
|
$4.000
|
$3.650
|
$10.400
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
25,257.000
|
$16.000
|
$15.100
|
$21.450
|
$35.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
2,932.000
|
$35.000
|
$11.300
|
$24.400
|
$35.000
|
|
|
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
|
SY
|
9,744.000
|
$0.400
|
$1.250
|
$0.500
|
$1.000
|
|
|
FL BS (CMP IN PLC)(TY A OR B GR 4)(8")
|
SY
|
23,892.000
|
$18.000
|
$9.900
|
$18.550
|
$30.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
269.000
|
$200.000
|
$219.800
|
$240.000
|
$300.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
23,892.000
|
$2.500
|
$5.800
|
$6.750
|
$20.000
|
|
|
CEMENT
|
TON
|
99.000
|
$190.000
|
$248.200
|
$200.000
|
$250.000
|
|
|
CEMENT TREAT (NEW BASE) (8")
|
SY
|
15,774.000
|
$3.000
|
$4.600
|
$6.150
|
$15.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
5,975.000
|
$4.000
|
$5.200
|
$5.750
|
$6.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
9,080.000
|
$3.000
|
$5.700
|
$5.150
|
$7.000
|
|
|
AGGR(TY-B GR-4 SAC-B)
|
CY
|
217.000
|
$125.500
|
$225.900
|
$290.000
|
$250.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
|
TON
|
43,772.000
|
$137.000
|
$162.500
|
$222.000
|
$200.000
|
|
|
TACK COAT
|
GAL
|
31,864.000
|
$5.500
|
$4.800
|
$6.250
|
$6.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
296.000
|
$400.000
|
$1,682.000
|
$2,660.000
|
$300.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
221,460.000
|
$1.700
|
$1.550
|
$2.100
|
$2.500
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
7,719.000
|
$80.000
|
$111.800
|
$108.200
|
$125.000
|
|
|
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
|
SY
|
119.000
|
$360.000
|
$1,006.000
|
$1,830.000
|
$1,100.000
|
|
|
CEM STABIL BKFL
|
CY
|
802.000
|
$160.000
|
$145.100
|
$160.000
|
$200.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
764.000
|
$160.000
|
$635.000
|
$175.000
|
$260.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
827.000
|
$2.000
|
$63.100
|
$61.000
|
$10.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,419.000
|
$25.000
|
$54.100
|
$50.000
|
$40.000
|
|
|
SOIL NAIL ANCHORS
|
LF
|
97,540.000
|
$15.000
|
$19.100
|
$15.700
|
$31.000
|
|
|
DRILL SHAFT (SIGN MTS) (12 IN)
|
LF
|
70.000
|
$120.000
|
$155.100
|
$138.000
|
$60.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
187.000
|
$200.000
|
$248.200
|
$222.000
|
$185.000
|
|
|
DRILL SHAFT (SIGN MTS) (36 IN)
|
LF
|
64.000
|
$350.000
|
$372.200
|
$335.000
|
$225.000
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
67.000
|
$220.000
|
$744.500
|
$665.000
|
$500.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
112.000
|
$250.000
|
$192.300
|
$335.000
|
$200.000
|
|
|
CL A CONC (MISC)
|
CY
|
49.000
|
$460.000
|
$543.500
|
$505.000
|
$1,500.000
|
|
|
CL B CONC (MISC)
|
CY
|
42.000
|
$430.000
|
$1,769.500
|
$1,000.000
|
$1,500.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
1,899.000
|
$500.000
|
$468.100
|
$465.000
|
$750.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
1,191.000
|
$60.000
|
$188.800
|
$148.000
|
$150.000
|
|
|
RETAINING WALL (SOIL NAIL)(FACIA)
|
SF
|
30,430.000
|
$55.000
|
$67.500
|
$63.000
|
$45.000
|
|
|
CONC STR REPR(RAPID DECK REP(FULL DPT))
|
SF
|
1,050.000
|
$260.000
|
$212.800
|
$222.000
|
$100.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1,555.000
|
$500.000
|
$694.000
|
$470.000
|
$435.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
131.000
|
$500.000
|
$823.500
|
$555.000
|
$510.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
56.000
|
$500.000
|
$569.500
|
$605.000
|
$556.000
|
|
|
RESIZING AND SEALING JOINTS
|
LF
|
1,062.000
|
$100.000
|
$47.900
|
$120.000
|
$50.000
|
|
|
RAIL (TY SSTR)
|
LF
|
13,125.000
|
$60.000
|
$74.800
|
$64.500
|
$65.000
|
|
|
RAIL (TY T80PP)
|
LF
|
654.000
|
$200.000
|
$341.200
|
$440.000
|
$395.000
|
|
|
JOINT SEALANT
|
LF
|
700.000
|
$30.000
|
$94.600
|
$180.000
|
$75.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
5.000
|
$80.000
|
$638.500
|
$490.000
|
$350.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
8.000
|
$130.000
|
$521.000
|
$390.000
|
$500.000
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
1,194.000
|
$120.000
|
$123.900
|
$250.000
|
$350.000
|
|
|
INLET (COMPL)(PCO)(5FT)(NONE)
|
EA
|
2.000
|
$5,100.000
|
$5,474.500
|
$13,800.000
|
$6,000.000
|
|
|
INLET (COMPL)(POD)(FG)(3FTX3FT)
|
EA
|
3.000
|
$4,800.000
|
$4,298.000
|
$8,325.000
|
$4,500.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
|
EA
|
1.000
|
$5,000.000
|
$7,707.500
|
$11,400.000
|
$7,000.000
|
|
|
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
|
EA
|
16.000
|
$3,550.000
|
$6,653.000
|
$10,000.000
|
$6,000.000
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
|
EA
|
89.000
|
$6,500.000
|
$6,957.000
|
$10,450.000
|
$6,000.000
|
|
|
INLET (COMPL)(PAZD)(RC)(4FTX4FT)
|
EA
|
4.000
|
$6,000.000
|
$5,961.500
|
$10,175.000
|
$5,000.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
5.000
|
$1,600.000
|
$2,181.000
|
$2,325.000
|
$2,500.000
|
|
|
ADJUSTING INLETS
|
EA
|
23.000
|
$3,300.000
|
$3,186.500
|
$4,900.000
|
$2,500.000
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
92.000
|
$2,000.000
|
$2,965.500
|
$2,500.000
|
$2,700.000
|
|
|
ADJUSTING MANHOLES(CAP)
|
EA
|
1.000
|
$930.000
|
$4,817.500
|
$4,000.000
|
$2,700.000
|
|
|
REMOV STR (INLET)
|
EA
|
9.000
|
$670.000
|
$1,244.000
|
$2,655.000
|
$2,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
38.000
|
$30.000
|
$40.200
|
$180.000
|
$250.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,000,000.000
|
$3,005,547.000
|
$3,460,000.000
|
$3,500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
40.000
|
$17,000.000
|
$3,565.000
|
$25,500.000
|
$55,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
444.000
|
$50.000
|
$43.400
|
$55.000
|
$50.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
444.000
|
$7.000
|
$12.400
|
$7.550
|
$7.000
|
|
|
BLADING WORK (EROSION & SEDMT CONT)
|
HR
|
13.000
|
$185.000
|
$251.700
|
$430.000
|
$165.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
120.000
|
$7.000
|
$9.600
|
$20.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,440.000
|
$5.000
|
$5.000
|
$6.950
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,400.000
|
$1.000
|
$1.250
|
$3.650
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,720.000
|
$6.000
|
$8.100
|
$8.000
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,720.000
|
$2.250
|
$2.500
|
$3.350
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
9,581.000
|
$18.000
|
$33.900
|
$17.300
|
$20.000
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
29,170.000
|
$15.000
|
$11.300
|
$8.350
|
$5.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
3,130.000
|
$15.000
|
$10.200
|
$21.250
|
$5.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
60.000
|
$15.000
|
$17.800
|
$25.700
|
$5.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
12,810.000
|
$8.000
|
$6.000
|
$7.100
|
$5.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
6,210.000
|
$8.000
|
$8.900
|
$13.750
|
$5.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
120.000
|
$11.000
|
$14.200
|
$12.250
|
$5.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
29,170.000
|
$15.000
|
$10.300
|
$8.300
|
$5.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
3,130.000
|
$15.000
|
$9.700
|
$21.000
|
$5.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
60.000
|
$15.000
|
$14.900
|
$25.000
|
$5.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (54 )
|
LF
|
10,967.000
|
$190.000
|
$129.400
|
$92.000
|
$90.000
|
|
|
PERM CTB (SGL SLOPE) (TY 4) (54 )
|
LF
|
480.000
|
$250.000
|
$395.800
|
$300.000
|
$270.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) SPECIAL
|
LF
|
1,013.000
|
$300.000
|
$1,061.000
|
$950.000
|
$740.000
|
|
|
PERM CTB (SGL SLOPE) (TY 4) SPECIAL
|
LF
|
70.000
|
$250.000
|
$1,085.500
|
$910.000
|
$590.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
2,941.000
|
$23.000
|
$24.600
|
$21.100
|
$25.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
3,654.000
|
$23.000
|
$24.700
|
$21.950
|
$25.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
1.000
|
$2,100.000
|
$2,961.000
|
$1,400.000
|
$1,450.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
750.000
|
$26.000
|
$38.200
|
$37.750
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
13.000
|
$2,250.000
|
$2,767.000
|
$2,665.000
|
$2,100.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
21,542.000
|
$3.500
|
$1.850
|
$7.500
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
10.000
|
$250.000
|
$248.200
|
$335.000
|
$1,500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
13.000
|
$2,850.000
|
$3,672.500
|
$3,700.000
|
$3,050.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
9.000
|
$350.000
|
$248.200
|
$335.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
11.000
|
$2,000.000
|
$3,335.500
|
$2,775.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,500.000
|
$3,335.500
|
$1,400.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
1.000
|
$15,000.000
|
$29,926.000
|
$29,000.000
|
$27,250.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$15,000.000
|
$11,124.000
|
$8,325.000
|
$10,550.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
11,944.000
|
$7.000
|
$5.800
|
$1.000
|
$3.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
113.000
|
$530.000
|
$744.500
|
$280.000
|
$900.000
|
|
|
REPLACE LUMINAIRE W/LED (250W EQ)
|
EA
|
9.000
|
$650.000
|
$496.300
|
$890.000
|
$585.000
|
|
|
IN RD IL (TY SP) 38S-8 (250W EQ) LED
|
EA
|
9.000
|
$4,000.000
|
$4,839.000
|
$5,275.000
|
$3,650.000
|
|
|
IN RD IL (TY SP) 38S-8-8 (250W EQ) LED
|
EA
|
47.000
|
$4,600.000
|
$5,583.500
|
$6,630.000
|
$4,000.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
14.000
|
$3,400.000
|
$4,032.500
|
$4,665.000
|
$3,500.000
|
|
|
IN RD IL (TY ST) 50T-8-8 (400W EQ) LED
|
EA
|
2.000
|
$7,760.000
|
$4,839.000
|
$6,660.000
|
$4,600.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
13,331.000
|
$9.500
|
$9.600
|
$5.550
|
$10.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
1,656.000
|
$20.000
|
$22.300
|
$33.300
|
$26.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
16,794.000
|
$1.250
|
$1.700
|
$1.950
|
$1.150
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
35,148.000
|
$1.300
|
$1.800
|
$2.250
|
$1.250
|
|
|
GROUND BOX TY A (122311)
|
EA
|
6.000
|
$450.000
|
$589.500
|
$835.000
|
$700.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
14.000
|
$900.000
|
$868.500
|
$1,275.000
|
$900.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
2.000
|
$500.000
|
$620.500
|
$445.000
|
$600.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
2.000
|
$7,000.000
|
$7,196.500
|
$7,700.000
|
$6,500.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
1,913.000
|
$37.000
|
$37.200
|
$33.300
|
$26.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
996.000
|
$33.000
|
$37.200
|
$33.300
|
$30.000
|
|
|
REFURBISH ALUMINUM SIGNS (TY O)
|
EA
|
2.000
|
$1,500.000
|
$496.300
|
$445.000
|
$180.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$770.000
|
$974.000
|
$870.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
23.000
|
$905.000
|
$1,054.500
|
$945.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
37.000
|
$1,025.000
|
$1,315.000
|
$1,175.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
9.000
|
$1,235.000
|
$1,551.000
|
$1,400.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
5.000
|
$370.000
|
$775.500
|
$695.000
|
$500.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
2.000
|
$2,300.000
|
$3,722.500
|
$3,330.000
|
$2,300.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
80.000
|
$120.000
|
$124.100
|
$110.000
|
$85.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
10,435.000
|
$7.000
|
$7.400
|
$6.650
|
$5.500
|
|
|
REMOVE LRSA
|
EA
|
19.000
|
$1,300.000
|
$1,551.000
|
$1,390.000
|
$1,200.000
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
2.000
|
$40,000.000
|
$40,015.000
|
$35,800.000
|
$28,000.000
|
|
|
INS OH SN SUP(60 FT BRDG)
|
EA
|
1.000
|
$27,000.000
|
$58,626.000
|
$52,500.000
|
$32,000.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
4.000
|
$10,000.000
|
$9,306.000
|
$8,325.000
|
$8,500.000
|
|
|
REMOVE OVERHD SIGN SUP (SIGN ONLY)
|
EA
|
1.000
|
$1,105.000
|
$1,551.000
|
$1,400.000
|
$1,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
146.000
|
$32.000
|
$15.800
|
$20.000
|
$34.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
32.000
|
$25.000
|
$15.800
|
$20.000
|
$34.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
57.000
|
$25.000
|
$22.600
|
$20.000
|
$35.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
35.000
|
$37.500
|
$53.400
|
$48.000
|
$42.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
8.000
|
$35.000
|
$53.400
|
$48.000
|
$42.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
6.000
|
$81.500
|
$93.100
|
$155.000
|
$28.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
65.000
|
$140.000
|
$93.100
|
$155.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)SRF
|
EA
|
136.000
|
$130.000
|
$124.100
|
$165.000
|
$31.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
3,013.000
|
$0.250
|
$1.250
|
$1.110
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
|
LF
|
929.000
|
$0.500
|
$1.250
|
$1.110
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
9,060.000
|
$0.350
|
$1.250
|
$1.110
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
1,462.000
|
$0.350
|
$1.250
|
$1.110
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
202.000
|
$1.000
|
$8.100
|
$7.210
|
$6.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
9,049.000
|
$0.700
|
$4.000
|
$3.610
|
$3.250
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
7,906.000
|
$0.500
|
$4.000
|
$3.610
|
$3.250
|
|
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
|
LF
|
315.000
|
$30.000
|
$0.500
|
$0.440
|
$0.400
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
12,307.000
|
$1.000
|
$1.000
|
$0.890
|
$0.800
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
3,794.000
|
$0.850
|
$4.300
|
$3.880
|
$3.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
623.000
|
$3.500
|
$8.700
|
$7.770
|
$7.000
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
10.000
|
$6.500
|
$186.100
|
$165.000
|
$150.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(090MIL)
|
EA
|
14.000
|
$130.000
|
$310.200
|
$280.000
|
$250.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(090MIL)
|
EA
|
8.000
|
$200.000
|
$248.200
|
$225.000
|
$200.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
10.000
|
$160.000
|
$248.200
|
$225.000
|
$200.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(090MIL)
|
EA
|
10.000
|
$200.000
|
$1,241.000
|
$1,100.000
|
$1,000.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
|
EA
|
27.000
|
$130.000
|
$37.200
|
$33.000
|
$30.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
|
LF
|
69.000
|
$5.000
|
$12.400
|
$11.000
|
$10.000
|
|
REFL PAV MRK TY I (W)12"(DOT)(090MIL)
|
LF
|
582.000
|
$2.500
|
$4.300
|
$4.000
|
$3.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
4,292.000
|
$0.500
|
$2.500
|
$2.250
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
219.000
|
$0.250
|
$1.250
|
$1.110
|
$1.000
|
|
|
FRICTIONAL ASPH SURF PRESERV TRTMT
|
SY
|
6,699.000
|
$1.650
|
$7.700
|
$6.900
|
$8.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
3,942.000
|
$105.000
|
$145.400
|
$155.000
|
$120.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
5.000
|
$16,000.000
|
$24,176.000
|
$25,000.000
|
$15,500.000
|
|
|
HPPM W/RET REQ TY I(W)4"(BRK)(090MIL)
|
LF
|
20,500.000
|
$0.350
|
$0.500
|
$0.440
|
$0.400
|
|
|
HPPM W/RET REQ TY I(W)4"(SLD)(090MIL)
|
LF
|
35,019.000
|
$0.300
|
$0.500
|
$0.440
|
$0.400
|
|
|
HPPM W/RET REQ TY I(Y)4"(SLD)(090MIL)
|
LF
|
48,989.000
|
$0.300
|
$0.500
|
$0.440
|
$0.400
|
|
|
PAVEMENT SEALER 4"
|
LF
|
219.000
|
$0.600
|
$1.250
|
$1.110
|
$1.000
|
|
|
TMA (STATIONARY)
|
DAY
|
75.000
|
$350.000
|
$796.000
|
$450.000
|
$365.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
4,308.000
|
$70.000
|
$70.100
|
$85.000
|
$35.000
|
|
Totals: |
$26,010,565.050
|
$30,998,613.060
|
$34,542,702.570
|
$35,342,668.150
|