RANDALL IH 27 (0168-09-181)

Items: 171

County: RANDALL
Length: N/A
Highway: IH 27
District: AMARILLO
Control Number: 0168-09-181
DBE Goal: N/A
Project: F 2021(518)
Guaranty: N/A
Time: 847 WORKING DAYS
Engineer's Estimate: $26,010,565.05
Date: 05/06/2021 (5 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$26,010,565.05
$30,998,613.06
Over/Under Est: 19.18% $4,988,048.01
$34,542,702.57
Over/Under Est: 32.8% $8,532,137.52
Amt Left: 11.43% $3,544,089.51
$35,342,668.15
Over/Under Est: 35.88% $9,332,103.10
Amt Left: 14.01% $4,344,055.09
Delta: -2.32% -$799,965.58
Subcontractor Percentage Amount
JB PINNACLE GROUP, LLC 12.45% $3,429,260.24
OSCAR ORDUNO, INC. 6.11% $1,682,954.22
ALAMO BROTHERS CONCRETE INC 4.64% $1,278,053.61
ARTEX ELECTRIC, INC. 2.47% $680,343.20
H & F TRUCKING 2.45% $674,834.34
HJC FARMS, INC. 1.92% $528,849.77
WILLIAMS DITCHING, LLC 1.36% $374,601.92
BARRICADES UNLIMITED 1.34% $369,093.07
TORO BRAVO CONSTRUCTION, LLC 0.51% $140,475.72
DUSTROL, INC. 0.50% $137,721.29
PRIMATE CONSTRUCTION, LP 0.35% $96,404.91
URBAN INFRACONSTRUCTION LLC 0.23% $63,351.80
J. H. ODEN CONTRACTING COMPANY 0.21% $57,842.94
INNOVATIVE ROADWAY SOLUTIONS, LLC 0.19% $52,334.09
TORO BRAVO CONSTRUCTION, LLC 0.19% $52,334.09
APOLLO CONSTRUCTORS, INC. 0.07% $19,280.98
LMSE TRUCKING, LLC 0.00% $0.00
IBCTX, LLC 0.00% $0.00
GHC TRANSPORT, L.L.C. 0.00% $0.00
Total: 34.99% $9,637,736.19

Bid Items & Bid Tabulations

171 Total 0 of 171
RANDALL  |  IH 27  |  AMARILLO  |  0168-09-181  |  05/06/2021  |  $26,010,565.05  |  F 2021(518)  |  HWY IMPRV  |  847 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ALLEN BUTLER CONSTRUCTION, INC.
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
PREPARING ROW
AC 1.490 $3,000.000 $66,929.000 $20,000.000 $50,000.000
REMOVING CONC (PAV)
SY 1,233.000 $15.000 $11.000 $38.300 $25.000
REMOVING CONC (RIPRAP)
SY 14,331.000 $11.000 $9.700 $7.500 $25.000
REMOVING CONC (SIDEWALKS)
SY 25.000 $16.000 $52.900 $24.000 $25.000
REMOVING CONC (CURB)
LF 25,040.000 $6.000 $4.300 $3.350 $10.000
REMOVING CONC (CURB AND GUTTER)
LF 3,594.000 $8.000 $4.400 $4.650 $10.000
REMOVING CONC (CTB)
LF 1,027.000 $50.000 $20.900 $22.500 $40.000
REMOVING CONC (RETAINING WALLS)
SY 372.000 $50.000 $89.900 $23.000 $60.000
REMOVING CONC (PAVERS)
SY 223.000 $14.000 $27.400 $11.300 $60.000
REMOVING STAB BASE AND ASPH PAV (6")
SY 12,881.000 $4.000 $3.650 $10.400 $15.000
EXCAVATION (ROADWAY)
CY 25,257.000 $16.000 $15.100 $21.450 $35.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 2,932.000 $35.000 $11.300 $24.400 $35.000
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
SY 9,744.000 $0.400 $1.250 $0.500 $1.000
FL BS (CMP IN PLC)(TY A OR B GR 4)(8")
SY 23,892.000 $18.000 $9.900 $18.550 $30.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 269.000 $200.000 $219.800 $240.000 $300.000
LIME TRT (SUBGRADE)(8")
SY 23,892.000 $2.500 $5.800 $6.750 $20.000
CEMENT
TON 99.000 $190.000 $248.200 $200.000 $250.000
CEMENT TREAT (NEW BASE) (8")
SY 15,774.000 $3.000 $4.600 $6.150 $15.000
PRIME COAT (MC-30)
GAL 5,975.000 $4.000 $5.200 $5.750 $6.000
ASPH (MULTI OPTION)
GAL 9,080.000 $3.000 $5.700 $5.150 $7.000
AGGR(TY-B GR-4 SAC-B)
CY 217.000 $125.500 $225.900 $290.000 $250.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
TON 43,772.000 $137.000 $162.500 $222.000 $200.000
TACK COAT
GAL 31,864.000 $5.500 $4.800 $6.250 $6.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 296.000 $400.000 $1,682.000 $2,660.000 $300.000
PLANE ASPH CONC PAV (2")
SY 221,460.000 $1.700 $1.550 $2.100 $2.500
CONC PVMT (CONT REINF - CRCP) (10")
SY 7,719.000 $80.000 $111.800 $108.200 $125.000
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
SY 119.000 $360.000 $1,006.000 $1,830.000 $1,100.000
CEM STABIL BKFL
CY 802.000 $160.000 $145.100 $160.000 $200.000
CUT & RESTORE CONC PAVING
SY 764.000 $160.000 $635.000 $175.000 $260.000
TRENCH EXCAVATION PROTECTION
LF 827.000 $2.000 $63.100 $61.000 $10.000
TEMPORARY SPL SHORING
SF 1,419.000 $25.000 $54.100 $50.000 $40.000
SOIL NAIL ANCHORS
LF 97,540.000 $15.000 $19.100 $15.700 $31.000
DRILL SHAFT (SIGN MTS) (12 IN)
LF 70.000 $120.000 $155.100 $138.000 $60.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 187.000 $200.000 $248.200 $222.000 $185.000
DRILL SHAFT (SIGN MTS) (36 IN)
LF 64.000 $350.000 $372.200 $335.000 $225.000
DRILL SHAFT (SIGN MTS) (54 IN)
LF 67.000 $220.000 $744.500 $665.000 $500.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 112.000 $250.000 $192.300 $335.000 $200.000
CL A CONC (MISC)
CY 49.000 $460.000 $543.500 $505.000 $1,500.000
CL B CONC (MISC)
CY 42.000 $430.000 $1,769.500 $1,000.000 $1,500.000
CL C CONC (RAIL FOUNDATION)
CY 1,899.000 $500.000 $468.100 $465.000 $750.000
RETAINING WALL (CAST - IN - PLACE)
SF 1,191.000 $60.000 $188.800 $148.000 $150.000
RETAINING WALL (SOIL NAIL)(FACIA)
SF 30,430.000 $55.000 $67.500 $63.000 $45.000
CONC STR REPR(RAPID DECK REP(FULL DPT))
SF 1,050.000 $260.000 $212.800 $222.000 $100.000
RIPRAP (CONC)(4 IN)
CY 1,555.000 $500.000 $694.000 $470.000 $435.000
RIPRAP (CONC)(FLUME)
CY 131.000 $500.000 $823.500 $555.000 $510.000
RIPRAP (MOW STRIP)(4 IN)
CY 56.000 $500.000 $569.500 $605.000 $556.000
RESIZING AND SEALING JOINTS
LF 1,062.000 $100.000 $47.900 $120.000 $50.000
RAIL (TY SSTR)
LF 13,125.000 $60.000 $74.800 $64.500 $65.000
RAIL (TY T80PP)
LF 654.000 $200.000 $341.200 $440.000 $395.000
JOINT SEALANT
LF 700.000 $30.000 $94.600 $180.000 $75.000
RC PIPE (CL III)(24 IN)
LF 5.000 $80.000 $638.500 $490.000 $350.000
RC PIPE (CL III)(36 IN)
LF 8.000 $130.000 $521.000 $390.000 $500.000
RC PIPE (CL IV)(18 IN)
LF 1,194.000 $120.000 $123.900 $250.000 $350.000
INLET (COMPL)(PCO)(5FT)(NONE)
EA 2.000 $5,100.000 $5,474.500 $13,800.000 $6,000.000
INLET (COMPL)(POD)(FG)(3FTX3FT)
EA 3.000 $4,800.000 $4,298.000 $8,325.000 $4,500.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
EA 1.000 $5,000.000 $7,707.500 $11,400.000 $7,000.000
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
EA 16.000 $3,550.000 $6,653.000 $10,000.000 $6,000.000
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
EA 89.000 $6,500.000 $6,957.000 $10,450.000 $6,000.000
INLET (COMPL)(PAZD)(RC)(4FTX4FT)
EA 4.000 $6,000.000 $5,961.500 $10,175.000 $5,000.000
ADJUSTING MANHOLES
EA 5.000 $1,600.000 $2,181.000 $2,325.000 $2,500.000
ADJUSTING INLETS
EA 23.000 $3,300.000 $3,186.500 $4,900.000 $2,500.000
ADJUSTING INLET (CAP)
EA 92.000 $2,000.000 $2,965.500 $2,500.000 $2,700.000
ADJUSTING MANHOLES(CAP)
EA 1.000 $930.000 $4,817.500 $4,000.000 $2,700.000
REMOV STR (INLET)
EA 9.000 $670.000 $1,244.000 $2,655.000 $2,000.000
REMOV STR (PIPE)
LF 38.000 $30.000 $40.200 $180.000 $250.000
MOBILIZATION
LS 1.000 $2,000,000.000 $3,005,547.000 $3,460,000.000 $3,500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 40.000 $17,000.000 $3,565.000 $25,500.000 $55,000.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 444.000 $50.000 $43.400 $55.000 $50.000
CONSTRUCTION EXITS (REMOVE)
SY 444.000 $7.000 $12.400 $7.550 $7.000
BLADING WORK (EROSION & SEDMT CONT)
HR 13.000 $185.000 $251.700 $430.000 $165.000
SANDBAGS FOR EROSION CONTROL
EA 120.000 $7.000 $9.600 $20.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,440.000 $5.000 $5.000 $6.950 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,400.000 $1.000 $1.250 $3.650 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,720.000 $6.000 $8.100 $8.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,720.000 $2.250 $2.500 $3.350 $1.000
CONSTRUCTING DETOURS
SY 9,581.000 $18.000 $33.900 $17.300 $20.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 29,170.000 $15.000 $11.300 $8.350 $5.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 3,130.000 $15.000 $10.200 $21.250 $5.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 60.000 $15.000 $17.800 $25.700 $5.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 12,810.000 $8.000 $6.000 $7.100 $5.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 6,210.000 $8.000 $8.900 $13.750 $5.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 120.000 $11.000 $14.200 $12.250 $5.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 29,170.000 $15.000 $10.300 $8.300 $5.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 3,130.000 $15.000 $9.700 $21.000 $5.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 60.000 $15.000 $14.900 $25.000 $5.000
PERM CTB (SGL SLOPE) (TY 1) (54 )
LF 10,967.000 $190.000 $129.400 $92.000 $90.000
PERM CTB (SGL SLOPE) (TY 4) (54 )
LF 480.000 $250.000 $395.800 $300.000 $270.000
PERM CTB (SGL SLOPE) (TY 1) SPECIAL
LF 1,013.000 $300.000 $1,061.000 $950.000 $740.000
PERM CTB (SGL SLOPE) (TY 4) SPECIAL
LF 70.000 $250.000 $1,085.500 $910.000 $590.000
CONC CURB & GUTTER (TY I)
LF 2,941.000 $23.000 $24.600 $21.100 $25.000
CONC CURB & GUTTER (TY II)
LF 3,654.000 $23.000 $24.700 $21.950 $25.000
CURB RAMPS (TY 1)
EA 1.000 $2,100.000 $2,961.000 $1,400.000 $1,450.000
MTL W-BEAM GD FEN (STEEL POST)
LF 750.000 $26.000 $38.200 $37.750 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 13.000 $2,250.000 $2,767.000 $2,665.000 $2,100.000
REMOVE METAL BEAM GUARD FENCE
LF 21,542.000 $3.500 $1.850 $7.500 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $250.000 $248.200 $335.000 $1,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 13.000 $2,850.000 $3,672.500 $3,700.000 $3,050.000
GUARDRAIL END TREATMENT (REMOVE)
EA 9.000 $350.000 $248.200 $335.000 $1,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 11.000 $2,000.000 $3,335.500 $2,775.000 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,500.000 $3,335.500 $1,400.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 1.000 $15,000.000 $29,926.000 $29,000.000 $27,250.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $15,000.000 $11,124.000 $8,325.000 $10,550.000
CHAIN LINK FENCE (REMOVE)
LF 11,944.000 $7.000 $5.800 $1.000 $3.000
REMOVE RD IL ASM (TRANS-BASE)
EA 113.000 $530.000 $744.500 $280.000 $900.000
REPLACE LUMINAIRE W/LED (250W EQ)
EA 9.000 $650.000 $496.300 $890.000 $585.000
IN RD IL (TY SP) 38S-8 (250W EQ) LED
EA 9.000 $4,000.000 $4,839.000 $5,275.000 $3,650.000
IN RD IL (TY SP) 38S-8-8 (250W EQ) LED
EA 47.000 $4,600.000 $5,583.500 $6,630.000 $4,000.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 14.000 $3,400.000 $4,032.500 $4,665.000 $3,500.000
IN RD IL (TY ST) 50T-8-8 (400W EQ) LED
EA 2.000 $7,760.000 $4,839.000 $6,660.000 $4,600.000
CONDT (PVC) (SCH 40) (2")
LF 13,331.000 $9.500 $9.600 $5.550 $10.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 1,656.000 $20.000 $22.300 $33.300 $26.000
ELEC CONDR (NO.8) BARE
LF 16,794.000 $1.250 $1.700 $1.950 $1.150
ELEC CONDR (NO.8) INSULATED
LF 35,148.000 $1.300 $1.800 $2.250 $1.250
GROUND BOX TY A (122311)
EA 6.000 $450.000 $589.500 $835.000 $700.000
GROUND BOX TY A (122311)W/APRON
EA 14.000 $900.000 $868.500 $1,275.000 $900.000
REMOVE ELECTRICAL SERVICES
EA 2.000 $500.000 $620.500 $445.000 $600.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 2.000 $7,000.000 $7,196.500 $7,700.000 $6,500.000
ALUMINUM SIGNS (TY G)
SF 1,913.000 $37.000 $37.200 $33.300 $26.000
ALUMINUM SIGNS (TY O)
SF 996.000 $33.000 $37.200 $33.300 $30.000
REFURBISH ALUMINUM SIGNS (TY O)
EA 2.000 $1,500.000 $496.300 $445.000 $180.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $770.000 $974.000 $870.000 $750.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 23.000 $905.000 $1,054.500 $945.000 $800.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 37.000 $1,025.000 $1,315.000 $1,175.000 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 9.000 $1,235.000 $1,551.000 $1,400.000 $1,100.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 5.000 $370.000 $775.500 $695.000 $500.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 2.000 $2,300.000 $3,722.500 $3,330.000 $2,300.000
REMOVE SM RD SN SUP&AM
EA 80.000 $120.000 $124.100 $110.000 $85.000
INSTALL LRSS (STRUCT STEEL)
LB 10,435.000 $7.000 $7.400 $6.650 $5.500
REMOVE LRSA
EA 19.000 $1,300.000 $1,551.000 $1,390.000 $1,200.000
INS OH SN SUP(40 FT CANT)
EA 2.000 $40,000.000 $40,015.000 $35,800.000 $28,000.000
INS OH SN SUP(60 FT BRDG)
EA 1.000 $27,000.000 $58,626.000 $52,500.000 $32,000.000
REMOVE OVERHD SIGN SUP
EA 4.000 $10,000.000 $9,306.000 $8,325.000 $8,500.000
REMOVE OVERHD SIGN SUP (SIGN ONLY)
EA 1.000 $1,105.000 $1,551.000 $1,400.000 $1,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 146.000 $32.000 $15.800 $20.000 $34.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 32.000 $25.000 $15.800 $20.000 $34.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 57.000 $25.000 $22.600 $20.000 $35.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 35.000 $37.500 $53.400 $48.000 $42.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 8.000 $35.000 $53.400 $48.000 $42.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 6.000 $81.500 $93.100 $155.000 $28.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 65.000 $140.000 $93.100 $155.000 $25.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)SRF
EA 136.000 $130.000 $124.100 $165.000 $31.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 3,013.000 $0.250 $1.250 $1.110 $1.000
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
LF 929.000 $0.500 $1.250 $1.110 $1.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 9,060.000 $0.350 $1.250 $1.110 $1.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 1,462.000 $0.350 $1.250 $1.110 $1.000
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 202.000 $1.000 $8.100 $7.210 $6.500
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 9,049.000 $0.700 $4.000 $3.610 $3.250
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 7,906.000 $0.500 $4.000 $3.610 $3.250
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 315.000 $30.000 $0.500 $0.440 $0.400
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 12,307.000 $1.000 $1.000 $0.890 $0.800
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 3,794.000 $0.850 $4.300 $3.880 $3.500
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 623.000 $3.500 $8.700 $7.770 $7.000
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 10.000 $6.500 $186.100 $165.000 $150.000
REFL PAV MRK TY I(W)(DBL ARROW)(090MIL)
EA 14.000 $130.000 $310.200 $280.000 $250.000
REFL PAV MRK TY I(W)(UTURN ARW)(090MIL)
EA 8.000 $200.000 $248.200 $225.000 $200.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 10.000 $160.000 $248.200 $225.000 $200.000
REFL PAV MRK TY I(W)(EXIT GORE)(090MIL)
EA 10.000 $200.000 $1,241.000 $1,100.000 $1,000.000
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 27.000 $130.000 $37.200 $33.000 $30.000
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
LF 69.000 $5.000 $12.400 $11.000 $10.000
REFL PAV MRK TY I (W)12"(DOT)(090MIL)
LF 582.000 $2.500 $4.300 $4.000 $3.500
ELIM EXT PAV MRK & MRKS (4")
LF 4,292.000 $0.500 $2.500 $2.250 $2.000
PAV SURF PREP FOR MRK (4")
LF 219.000 $0.250 $1.250 $1.110 $1.000
FRICTIONAL ASPH SURF PRESERV TRTMT
SY 6,699.000 $1.650 $7.700 $6.900 $8.000
D-GR HMA TY-B PG64-22
TON 3,942.000 $105.000 $145.400 $155.000 $120.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 5.000 $16,000.000 $24,176.000 $25,000.000 $15,500.000
HPPM W/RET REQ TY I(W)4"(BRK)(090MIL)
LF 20,500.000 $0.350 $0.500 $0.440 $0.400
HPPM W/RET REQ TY I(W)4"(SLD)(090MIL)
LF 35,019.000 $0.300 $0.500 $0.440 $0.400
HPPM W/RET REQ TY I(Y)4"(SLD)(090MIL)
LF 48,989.000 $0.300 $0.500 $0.440 $0.400
PAVEMENT SEALER 4"
LF 219.000 $0.600 $1.250 $1.110 $1.000
TMA (STATIONARY)
DAY 75.000 $350.000 $796.000 $450.000 $365.000
TMA (MOBILE OPERATION)
HR 4,308.000 $70.000 $70.100 $85.000 $35.000
Totals: $26,010,565.050 $30,998,613.060 $34,542,702.570 $35,342,668.150