Show Job Controls
Bid Cobra

RANDALL US 60 (0168-08-073)

Items: 71

County: RANDALL
Length: N/A
Highway: US 60
District: AMARILLO
Control Number: 0168-08-073
DBE Goal: N/A
Project: NH 2021(372)
Guaranty: N/A
Time: 139 WORKING DAYS
Engineer's Estimate: $3,792,889.68
Date: 02/05/2021 (5 years ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$3,792,889.68
$4,103,043.60
Over/Under Est: 8.18% $310,153.92
$4,141,349.82
Over/Under Est: 9.19% $348,460.14
Amt Left: 0.93% $38,306.22
$4,772,985.28
Over/Under Est: 25.84% $980,095.60
Amt Left: 16.33% $669,941.68
Delta: -15.25% -$631,635.46

Bid Items & Bid Tabulations

71 Total 0 of 71
RANDALL  |  US 60  |  AMARILLO  |  0168-08-073  |  02/05/2021  |  $3,792,889.68  |  NH 2021(372)  |  INTERS IMPRVS  |  139 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
RK HALL, LLC
REMOVING STAB BASE & ASPH PAV (18")
SY 10,278.000 $11.000 $15.750 $20.000 $8.800
EXCAVATION (ROADWAY)
CY 5,824.000 $15.000 $11.550 $19.000 $21.690
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 2,942.000 $40.000 $16.000 $19.000 $16.980
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 9.000 $700.000 $685.000 $650.000 $587.930
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 9.000 $600.000 $590.000 $560.000 $587.930
FL BS (CMP IN PLC)(TY A OR B GR4)(12")
SY 24,637.000 $17.000 $19.550 $20.000 $35.300
FL BS (CMP IN PLC)(TY A OR B GR4)(10")
SY 352.000 $40.000 $38.500 $18.000 $54.770
CEMENT
TON 268.000 $190.000 $175.000 $200.000 $198.640
CEMENT TREAT (SUBGRADE) (8")
SY 24,637.000 $4.000 $4.600 $6.000 $5.280
PRIME COAT (MC-30)
GAL 6,160.000 $4.000 $4.500 $4.000 $8.620
EMULS ASPH (EROSN CONT)(MULTI)
GAL 4,356.000 $3.000 $4.000 $3.500 $2.570
ASPH (MULTI OPTION)
GAL 9,363.000 $3.200 $4.100 $4.000 $5.300
AGGR(TY-B GR-4 SAC-B)
CY 224.000 $132.680 $140.000 $240.000 $434.930
PLANE ASPH CONC PAV (6")
SY 1,785.000 $3.000 $18.600 $19.000 $19.800
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 784.000 $275.000 $215.000 $180.000 $275.000
CONC BOX CULV (4 FT X 2 FT)
LF 20.000 $500.000 $845.000 $1,276.000 $930.770
CONC BOX CULV (5 FT X 3 FT)
LF 20.000 $600.000 $1,000.000 $1,300.000 $1,105.290
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 6.000 $1,000.000 $900.000 $1,700.000 $988.940
CONC BOX CULV (10 FT X 3 FT)(EXTEND)
LF 10.000 $1,000.000 $1,530.000 $1,855.000 $1,687.020
RC PIPE (CL III)(24 IN)
LF 195.000 $200.000 $210.000 $179.000 $232.690
JCTBOX(COMPL)(PJB)(5FTX6FT)
EA 1.000 $8,000.000 $7,900.000 $14,870.000 $8,725.960
INLET (COMPL)(PSL)(FG)(5FTX6FT-3FTX3FT)
EA 1.000 $8,000.000 $14,775.000 $16,125.000 $16,288.460
JCT BOX (COMPL)(SPL)
EA 1.000 $25,000.000 $17,400.000 $18,575.000 $19,197.110
SET (TY I)(S= 5 FT)(HW= 5 FT)(6:1) (C)
EA 3.000 $10,000.000 $15,825.000 $20,000.000 $17,451.920
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 8.000 $2,200.000 $2,640.000 $3,255.000 $2,908.660
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 4.000 $3,500.000 $4,220.000 $3,845.000 $4,653.850
REMOV STR (SET)
EA 9.000 $1,000.000 $1,100.000 $350.000 $1,163.460
REMOV STR (HEADWALL)
EA 8.000 $1,100.000 $1,100.000 $350.000 $1,163.460
REMOV STR (PIPE)
LF 200.000 $26.000 $16.000 $25.000 $17.450
REMOV STR (BOX CULVERT)
LF 16.000 $70.000 $160.000 $30.000 $174.520
MOBILIZATION
LS 1.000 $255,000.000 $400,000.000 $400,000.000 $423,500.260
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $15,000.000 $22,000.000 $15,000.000 $7,774.750
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 300.000 $6.500 $7.000 $8.000 $11.690
BIODEG EROSN CONT LOGS (REMOVE)
LF 300.000 $2.000 $4.400 $3.000 $4.040
REMOVE METAL BEAM GUARD FENCE
LF 360.000 $5.000 $4.250 $10.000 $5.500
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $350.000 $425.000 $1,500.000 $275.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $500.000 $425.000 $1,500.000 $550.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 15.000 $2,100.000 $1,675.000 $1,900.000 $2,200.000
IN RD IL (TY ST) 40T-8 (250W EQ) LED
EA 27.000 $3,900.000 $3,200.000 $3,100.000 $4,675.000
IN RD IL (TY ST) 40T-8-8(250W EQ) LED
EA 56.000 $4,300.000 $3,840.000 $4,250.000 $5,775.000
CONDT (PVC) (SCH 40) (2")
LF 19,155.000 $8.500 $8.550 $7.250 $4.400
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,215.000 $20.000 $23.550 $22.000 $38.500
ELEC CONDR (NO.8) BARE
LF 22,500.000 $1.330 $1.200 $1.250 $1.210
ELEC CONDR (NO.8) INSULATED
LF 45,000.000 $1.500 $1.400 $1.350 $1.380
GROUND BOX TY A (122311)W/APRON
EA 6.000 $950.000 $1,070.000 $825.000 $1,430.000
GROUND BOX TY C (162911)W/APRON
EA 10.000 $1,200.000 $1,150.000 $970.000 $1,650.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $500.000 $760.000 $510.000 $550.000
ELC SRV TY A 240/480 060(NS)SS(E)TP(O)
EA 4.000 $6,000.000 $5,475.000 $5,400.000 $8,250.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 64.000 $775.000 $910.000 $585.000 $792.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $900.000 $1,160.000 $925.000 $1,001.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 4.000 $1,100.000 $955.000 $1,125.000 $1,210.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,200.000 $1,240.000 $825.000 $1,320.000
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
EA 15.000 $130.000 $160.000 $72.000 $137.500
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 135.000 $135.000 $160.000 $120.000 $137.500
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 36.000 $125.000 $160.000 $125.000 $137.500
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 1,065.000 $0.350 $4.220 $4.000 $4.400
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 2,415.000 $0.380 $4.220 $4.000 $4.400
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 827.000 $6.250 $7.650 $8.000 $8.000
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 37.000 $130.070 $69.000 $66.000 $71.980
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 37.000 $153.240 $76.750 $73.000 $79.980
REF PAV MRK TY I(W)18"(YLD TRI)(090MIL)
EA 118.000 $20.000 $2.900 $3.000 $3.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 9,238.000 $0.450 $0.330 $0.310 $0.340
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 47,934.000 $0.450 $0.330 $0.310 $0.340
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 50,133.000 $0.390 $0.330 $0.310 $0.340
REFL PAV MRKR TY II-C-R
EA 1,156.000 $3.590 $6.900 $6.540 $7.190
PAV SURF PREP FOR MRK (RPM)
EA 1,156.000 $0.380 $0.150 $0.130 $0.140
SP MIXES SP-C SAC-A PG70-28
TON 8,172.000 $120.000 $130.000 $130.000 $132.960
TACK COAT
GAL 6,406.000 $5.000 $3.500 $3.000 $7.340
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $11,871.000 $21,250.000 $15,000.000 $11,274.170
TMA (STATIONARY)
DAY 140.000 $380.000 $260.000 $200.000 $459.850
TMA (MOBILE OPERATION)
HR 160.000 $80.000 $60.000 $30.000 $98.290
Totals: $3,792,889.680 $4,103,043.600 $4,141,349.820 $4,772,985.280