Show Job Controls
Bid Cobra

RANDALL US 87 (0067-01-089)

Items: 132

County: RANDALL
Length: 0.8880 MILES
Highway: US 87
District: AMARILLO
Control Number: 0067-01-089
DBE Goal: 0.0%
Project: F 2026(460)
Guaranty: $69,000.00
Time: 162 WORKING DAYS
Engineer's Estimate: $3,452,502.45
Date: 03/04/2026 (3 months ago)
Contract Number: 3263020
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00215071
Contract Type: Federal
Project Description: CONSTRUCT CONTINUOUS ADA PATH (SUP)
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$3,452,502.45
1
Awarded
$3,206,580.20
Over/Under Est: -7.12% -$245,922.25
$3,484,848.40
Over/Under Est: 0.94% $32,345.95
Amt Left: 8.68% $278,268.20
Over/Under Est: 10.17% $351,132.80
Amt Left: 18.62% $597,055.05
Delta: -9.15% -$318,786.85
$4,685,972.90
Over/Under Est: 35.73% $1,233,470.45
Amt Left: 46.14% $1,479,392.70
Delta: -23.20% -$882,337.65
$4,707,653.38
Over/Under Est: 36.35% $1,255,150.93
Amt Left: 46.81% $1,501,073.18
Delta: -0.46% -$21,680.48

Bid Items & Bid Tabulations

132 Total 0 of 132
RANDALL  |  US 87  |  AMARILLO  |  0067-01-089  |  03/04/2026  |  $3,452,502.45  |  F 2026(460)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  162 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
STX CIVIL
ALTUS CONSTRUCTION LLC
L A FULLER & SONS CONSTRUCTION, LTD.
GILVIN-TERRILL, LTD.
TI-ZACK CONCRETE, LLC
PREP ROW (TREE REMOVE) (0"-12" DIA)
EA 14.000 $1,000.000 $367.000 $495.479 $800.000 $2,000.000 $900.000
PREP ROW (TREE REMOVE) (12"-24" DIA)
EA 5.000 $1,500.000 $550.000 $908.378 $950.000 $2,000.000 $1,300.000
PREP ROW (TREE REMOVE) (24"-36" DIA)
EA 4.000 $2,500.000 $428.000 $2,064.497 $1,200.000 $2,000.000 $2,500.000
REMOV CONC (PAV)
SY 386.000 $35.000 $18.000 $20.644 $16.000 $40.000 $25.000
REMOV CONC (MOWSTRIP)
SY 19.000 $15.000 $20.000 $26.115 $52.000 $40.000 $12.000
REMOV CONC (DRIVEWAYS)
SY 220.000 $30.000 $15.000 $20.232 $37.000 $40.000 $20.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 499.000 $30.000 $13.000 $50.543 $23.000 $40.000 $15.000
REMOV CONC (CURB & GUTTER)
LF 1,030.000 $12.000 $8.000 $15.018 $8.500 $20.000 $10.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 169.000 $12.000 $8.000 $10.776 $7.400 $20.000 $10.000
REMOV CONC (SAWCUT)
LF 179.000 $5.000 $67.000 $29.728 $2.800 $20.000 $6.000
REMOV CONC (FLUME)
SY 113.000 $15.000 $20.000 $74.321 $23.000 $30.000 $20.000
RMV (3") TRT/UNTRT BASE & ASPH PAV
SY 587.000 $10.000 $12.000 $50.825 $17.000 $30.000 $7.500
RMV (10") TRT/UNTRT BASE & ASPH PAV
SY 1,100.000 $10.000 $15.000 $30.992 $23.500 $30.000 $19.500
OBLITERATING ABANDONED ROAD
SY 452.000 $15.000 $25.000 $5.161 $17.000 $30.000 $45.000
EXCAV (SPECIAL)
CY 135.000 $60.000 $67.000 $61.934 $32.000 $35.000 $15.000
EMBANK (FNL)(DC)(TY B)
CY 1,665.000 $40.000 $30.000 $37.771 $42.000 $150.000 $90.000
FURN & PLACE TOPSOIL (3")
SY 950.000 $5.000 $10.000 $2.642 $4.000 $10.000 $105.000
BROADCAST SEED (PERM_URBAN_SAND)
SY 12,287.000 $0.500 $0.500 $0.745 $0.350 $0.750 $0.320
BROADCAST SEED (TEMP_WARM_COOL)
SY 13,237.000 $0.250 $0.500 $0.206 $0.350 $0.750 $0.320
SOIL RET BLKT(SL_MOD_SAND_LONG)
SY 12,287.000 $4.000 $8.000 $2.476 $2.100 $5.000 $1.900
RDSIDE AMENITY (WHEEL STOP REMOV&RESET)
EA 25.000 $100.000 $190.000 $346.370 $100.000 $200.000 $269.490
D-GR HMA TY-D SAC-A PG70-28
TON 436.000 $185.000 $342.000 $113.134 $230.000 $400.000 $252.000
TACK COAT
GAL 670.000 $9.000 $6.000 $4.153 $7.000 $10.000 $9.450
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 1,000.000 $100.000 $70.000 $46.572 $143.000 $200.000 $267.550
PLANE ASPH CONC PAV (0" TO 1.5")
SY 5,058.000 $5.200 $3.000 $2.642 $2.900 $10.000 $7.390
CONC PAV (JOINT REINF) (8")
SY 450.000 $20.000 $220.000 $132.426 $155.000 $160.000 $148.590
CEM STABIL BKFL
CY 3.000 $325.000 $675.000 $185.804 $260.000 $1,000.000 $707.150
TRENCH EXCAVATION PROTECTION
LF 1,107.000 $4.000 $10.000 $24.385 $5.500 $20.000 $12.630
TEMPORARY SPL SHORING
SF 2,716.000 $30.000 $20.000 $46.645 $32.400 $70.000 $41.500
SOIL NAIL ANCHORS
LF 608.000 $35.000 $70.000 $47.592 $41.000 $150.000 $82.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 40.000 $280.000 $300.000 $313.803 $328.000 $300.000 $288.000
CL A CONC (MISC)
CY 35.000 $715.000 $800.000 $657.380 $760.000 $1,000.000 $833.770
CL A CONC (FLUME)
CY 146.000 $715.000 $800.000 $566.247 $605.000 $1,000.000 $865.000
CL A CONC (COLLAR)
EA 9.000 $1,100.000 $1,000.000 $1,322.685 $2,090.000 $3,000.000 $2,525.550
CL C CONC (RAIL FOUNDATION)
CY 175.000 $790.000 $800.000 $602.512 $534.000 $600.000 $833.770
RETAINING WALL (MSE)
SF 3,422.000 $130.000 $70.000 $142.799 $140.000 $150.000 $192.190
RETAINING WALL (SPREAD FOOTING)
SF 98.000 $110.000 $117.000 $290.376 $180.000 $100.000 $95.360
RETAINING WALL (SOIL NAIL) (FASCIA)
SF 527.000 $80.000 $117.000 $142.338 $195.000 $100.000 $166.440
CONCRETE PAINT FINISH
SF 4,460.000 $1.000 $9.000 $0.869 $0.910 $1.000 $0.850
RIPRAP (CONC)(4 IN)
CY 12.000 $700.000 $705.000 $615.633 $1,200.000 $1,200.000 $833.770
RIPRAP (CONC)(5 IN)
CY 8.000 $700.000 $735.000 $580.173 $790.000 $750.000 $833.770
RIPRAP (CONC)(CL A)
CY 6.000 $700.000 $1,040.000 $681.284 $1,000.000 $700.000 $1,022.850
RIPRAP (MOW STRIP)(4 IN)
CY 41.000 $700.000 $795.000 $483.612 $692.000 $750.000 $833.770
RAIL (TY C221)
LF 1,143.000 $165.000 $205.000 $128.630 $145.000 $160.000 $238.440
RAIL (HANDRAIL)(TY F)
LF 152.000 $120.000 $185.000 $139.735 $228.000 $215.000 $225.810
GABION MATTRESSES (GALV)(12 IN)
SY 86.000 $90.000 $238.000 $206.077 $210.000 $140.000 $310.800
CMP (GAL STL 24 IN)
LF 65.000 $80.000 $269.000 $196.144 $157.000 $150.000 $90.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000 $7,500.000 $7,350.000 $7,533.626 $8,600.000 $6,000.000 $7,731.970
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 1.000 $9,000.000 $7,850.000 $5,077.150 $10,200.000 $7,000.000 $9,508.700
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 1.000 $11,000.000 $4,300.000 $8,726.631 $13,200.000 $7,500.000 $10,862.390
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 2.000 $12,200.000 $4,300.000 $7,823.413 $14,000.000 $13,500.000 $13,720.050
INLET (COMPL)(PCO)(4FT)(BOTH)
EA 1.000 $13,000.000 $7,835.000 $9,877.795 $15,000.000 $9,500.000 $18,668.870
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
EA 2.000 $11,000.000 $9,200.000 $5,981.331 $11,800.000 $9,500.000 $9,407.680
INL(CMP)(PAZD-CZ)(FG)(4FTX4FT-4FTX4FT)
EA 2.000 $13,000.000 $10,400.000 $8,652.447 $13,500.000 $12,500.000 $14,677.240
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 1.000 $2,900.000 $4,285.000 $2,787.071 $2,560.000 $7,000.000 $5,682.490
GRATE AND FRAME (BRIDGE DRAIN)
EA 2.000 $2,700.000 $1,470.000 $4,837.283 $5,480.000 $2,500.000 $11,809.400
ADJUSTING MANHOLES (CAP)
EA 2.000 $500.000 $615.000 $454.189 $2,300.000 $1,500.000 $1,600.570
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 6.000 $500.000 $367.000 $887.321 $580.000 $1,500.000 $839.660
ADJUSTING MANHOLES (WATER METER)
EA 1.000 $500.000 $612.000 $598.704 $580.000 $1,500.000 $839.650
REMOV STR (SET)
EA 2.000 $900.000 $700.000 $646.187 $900.000 $3,000.000 $441.970
REMOV STR (HEADWALL)
EA 1.000 $900.000 $1,835.000 $1,766.966 $2,000.000 $3,000.000 $2,399.270
REMOV STR (SMALL)
EA 1.000 $900.000 $1,470.000 $3,138.036 $2,000.000 $3,000.000 $5,682.490
MOBILIZATION
LS 1.000 $275,000.000 $265,000.000 $346,746.557 $376,000.000 $460,000.000 $489,446.750
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $12,500.000 $3,000.000 $27,879.120 $3,700.000 $7,625.000 $1,509.630
PORTABLE CHANGEABLE MESSAGE SIGN
EA 1.000 $13,000.000 $7,500.000 $7,845.090 $15,000.000 $18,500.000 $14,957.770
TMA (STATIONARY)
DAY 140.000 $300.000 $185.000 $165.159 $300.000 $400.000 $250.000
TMA (MOBILE OPERATION)
HR 10.000 $105.000 $200.000 $61.026 $100.000 $95.000 $365.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 211.000 $6.000 $3.000 $3.773 $8.650 $7.000 $8.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 211.000 $1.000 $1.000 $1.032 $2.300 $2.000 $2.250
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 674.000 $6.000 $8.000 $6.234 $4.600 $6.000 $4.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 674.000 $1.000 $1.000 $1.651 $1.150 $3.000 $1.050
COLORED TEXTURED CONC (5")
SY 230.000 $107.000 $200.000 $96.893 $100.000 $100.000 $154.490
CONC CURB (TY II)
LF 521.000 $46.000 $23.000 $42.587 $18.400 $60.000 $60.230
CONC CURB & GUTTER (TY II)
LF 627.000 $50.000 $42.000 $105.393 $44.000 $60.000 $60.230
DRIVEWAYS (CONC)
SY 620.000 $135.000 $115.000 $173.812 $163.000 $125.000 $134.490
CONC SIDEWALKS (5")
SY 5,146.000 $95.000 $75.000 $68.392 $77.000 $110.000 $99.690
CONC SIDEWALK (STEPS)
SY 3.000 $200.000 $675.000 $24.773 $3,600.000 $300.000 $277.920
CURB RAMPS (TY 1)
EA 26.000 $2,200.000 $1,200.000 $1,146.124 $4,300.000 $1,500.000 $2,220.330
CURB RAMPS (TY 2)
EA 13.000 $2,200.000 $1,200.000 $2,283.906 $3,600.000 $1,900.000 $2,220.330
CONCRETE SIDEWALK (RETAINING WALL)
CY 81.000 $1,500.000 $490.000 $999.208 $888.000 $1,000.000 $833.770
CONC SIDEWALKS (SPECIAL) (TYPE A)
SY 78.000 $270.000 $500.000 $41.289 $1,450.000 $295.000 $1,256.180
MTL W-BEAM GD FEN (STEEL POST)
LF 525.000 $38.000 $75.000 $63.899 $39.100 $36.000 $35.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,500.000 $2,500.000 $1,238.698 $1,610.000 $1,250.000 $1,470.000
REMOVE METAL BEAM GUARD FENCE
LF 280.000 $4.000 $1.000 $2.477 $17.000 $2.000 $4.200
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $300.000 $350.000 $189.330 $1,500.000 $200.000 $420.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,500.000 $4,000.000 $2,742.288 $4,025.000 $3,500.000 $3,675.000
CHAIN LINK FENCE (INSTALL) (4')
LF 350.000 $40.000 $60.000 $9.909 $33.000 $100.000 $29.000
CHAIN LINK FENCE (REMOVE)
LF 360.000 $10.000 $1.000 $10.735 $6.050 $15.000 $5.500
GATE (SPECIAL)
EA 1.000 $200.000 $10,000.000 $2,147.077 $2,875.000 $5,000.000 $2,625.000
ALUMINUM SIGNS (TY G)
SF 244.000 $35.000 $80.000 $38.537 $40.250 $40.000 $42.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 40.000 $1,000.000 $550.000 $735.511 $768.200 $800.000 $840.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 3.000 $1,100.000 $920.000 $802.676 $838.350 $850.000 $1,073.360
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,200.000 $930.000 $1,213.374 $1,267.300 $1,175.000 $1,483.760
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 27.000 $400.000 $245.000 $731.107 $763.600 $725.000 $915.510
REMOVE SM RD SN SUP&AM
EA 17.000 $120.000 $95.000 $94.966 $340.000 $100.000 $126.280
INSTALL LRSS (STRUCT STEEL)
LB 1,556.000 $11.000 $9.000 $8.698 $13.500 $12.000 $15.150
REMOVE LRSA
EA 2.000 $1,070.000 $1,500.000 $825.799 $980.000 $1,250.000 $1,578.470
REMOVE OVERHD SIGN SUP
EA 1.000 $10,550.000 $10,000.000 $7,689.481 $20,000.000 $15,000.000 $18,941.630
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2
EA 11.000 $25.000 $75.000 $40.877 $48.300 $50.000 $53.040
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 23.000 $25.000 $50.000 $19.893 $48.300 $40.000 $53.040
REMOVE DELIN & OBJECT MARKER ASSMS
EA 10.000 $20.000 $25.000 $23.122 $57.500 $15.000 $18.940
INSTL OM SM RD SIGN (1-OM-PW)Y
EA 14.000 $10.000 $250.000 $14.313 $14.950 $15.000 $18.940
INSTL OM LG RD SIGN (2-OM-PW)Y
EA 1.000 $10.000 $250.000 $14.313 $14.950 $15.000 $18.940
INSTL OM LG RD SIGN (3-OM-PW)Y
EA 1.000 $10.000 $250.000 $14.313 $14.950 $15.000 $18.940
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 134.000 $2.000 $1.500 $0.825 $5.000 $1.000 $1.520
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 40.000 $1.000 $1.500 $1.052 $5.000 $1.000 $1.520
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 370.000 $1.600 $5.000 $4.954 $5.200 $4.500 $5.680
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 145.000 $8.000 $17.000 $16.515 $17.250 $15.000 $18.940
RE PM TY II (W) 4" (SLD)
LF 1,270.000 $0.200 $2.500 $2.202 $2.300 $2.000 $2.530
RE PM TY II (W) 6" (SLD)
LF 2,927.000 $0.300 $2.600 $2.312 $2.450 $2.100 $2.650
RE PM TY II (W) 24" (SLD)
LF 1,297.000 $6.000 $8.000 $6.606 $6.900 $6.000 $6.300
RE PM TY II (W) (ARROW)
EA 2.000 $150.000 $125.000 $110.106 $115.000 $100.000 $105.000
RE PM TY II (W) (BIKE ARROW)
EA 16.000 $150.000 $125.000 $110.106 $115.000 $100.000 $105.000
RE PM TY II (W) (BIKE SYMBOL)
EA 16.000 $150.000 $200.000 $165.159 $172.500 $150.000 $160.000
RE PM TY II (Y) 4" (BRK)
LF 390.000 $0.200 $2.500 $2.202 $2.300 $2.000 $2.250
RE PM TY II (Y) 6" (BRK)
LF 420.000 $0.300 $2.600 $2.312 $2.450 $2.100 $2.250
RE PM TY II (Y)(CURB)
LF 450.000 $1.000 $8.000 $6.606 $6.900 $6.000 $6.300
RE PM TY II (R&W) 6" (FIRE LANE)
LF 60.000 $2.000 $25.000 $22.021 $23.000 $20.000 $21.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 120.000 $0.700 $5.000 $4.679 $4.900 $4.250 $5.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 1,175.000 $0.700 $5.000 $4.679 $4.900 $4.250 $5.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 805.000 $0.700 $5.000 $4.679 $4.900 $4.250 $5.000
REFL PAV MRKR TY II-C-R
EA 14.000 $11.000 $20.000 $16.515 $17.250 $15.000 $16.000
ELIM EXT PM & MRKS (4")
LF 620.000 $1.000 $5.000 $3.303 $3.450 $3.000 $3.300
ELIM EXT PM & MRKS (12")
LF 850.000 $1.000 $8.000 $7.156 $7.500 $6.500 $7.000
REPLACE OF TIMBER POLES
EA 11.000 $1,500.000 $675.000 $825.799 $5,750.000 $5,130.000 $3,000.000
REPLACE DOWN GUY AND ANCHOR W/GUARD
EA 5.000 $500.000 $3,100.000 $825.799 $2,875.000 $5,130.000 $2,500.000
ANTI-GRAFFITI COATNG (PERMNENT-TY III)
SF 4,460.000 $0.500 $9.000 $1.288 $1.350 $1.170 $1.480
TIED-CONCRETE BLOCK EROSION CONTROL MAT
SF 150.000 $12.000 $95.000 $2.477 $20.000 $20.000 $60.000
1
RC PIPE (CL III)(24 IN)
LF 593.000 $105.000 $0.000 $69.818 $108.050 $120.000 $131.250
1
RC PIPE (CL III)(36 IN)
LF 485.000 $200.000 $0.000 $116.632 $185.000 $200.000 $215.250
1A
THERMOPLASTIC PIPE (PP) (24")
LF 593.000 $105.000 $55.000 $0.000 $0.000 $0.000 $0.000
1A
THERMOPLASTIC PIPE (PP) (36")
LF 485.000 $200.000 $95.000 $0.000 $0.000 $0.000 $0.000
Totals: $3,611,767.450 $3,206,580.200 $3,484,848.349 $3,803,635.250 $4,685,972.900 $4,707,653.380
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,500.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $500.00
Total: $3,000.00