PREP ROW (TREE REMOVE) (0"-12" DIA)
|
EA
|
14.000
|
$1,000.000
|
$367.000
|
$495.479
|
$800.000
|
$2,000.000
|
$900.000
|
|
|
|
PREP ROW (TREE REMOVE) (12"-24" DIA)
|
EA
|
5.000
|
$1,500.000
|
$550.000
|
$908.378
|
$950.000
|
$2,000.000
|
$1,300.000
|
|
|
|
PREP ROW (TREE REMOVE) (24"-36" DIA)
|
EA
|
4.000
|
$2,500.000
|
$428.000
|
$2,064.497
|
$1,200.000
|
$2,000.000
|
$2,500.000
|
|
|
|
REMOV CONC (PAV)
|
SY
|
386.000
|
$35.000
|
$18.000
|
$20.644
|
$16.000
|
$40.000
|
$25.000
|
|
|
|
REMOV CONC (MOWSTRIP)
|
SY
|
19.000
|
$15.000
|
$20.000
|
$26.115
|
$52.000
|
$40.000
|
$12.000
|
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
220.000
|
$30.000
|
$15.000
|
$20.232
|
$37.000
|
$40.000
|
$20.000
|
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
499.000
|
$30.000
|
$13.000
|
$50.543
|
$23.000
|
$40.000
|
$15.000
|
|
|
|
REMOV CONC (CURB & GUTTER)
|
LF
|
1,030.000
|
$12.000
|
$8.000
|
$15.018
|
$8.500
|
$20.000
|
$10.000
|
|
|
|
REMOV CONC (CURB OR CURB & GUTTER)
|
LF
|
169.000
|
$12.000
|
$8.000
|
$10.776
|
$7.400
|
$20.000
|
$10.000
|
|
|
|
REMOV CONC (SAWCUT)
|
LF
|
179.000
|
$5.000
|
$67.000
|
$29.728
|
$2.800
|
$20.000
|
$6.000
|
|
|
|
REMOV CONC (FLUME)
|
SY
|
113.000
|
$15.000
|
$20.000
|
$74.321
|
$23.000
|
$30.000
|
$20.000
|
|
|
|
RMV (3") TRT/UNTRT BASE & ASPH PAV
|
SY
|
587.000
|
$10.000
|
$12.000
|
$50.825
|
$17.000
|
$30.000
|
$7.500
|
|
|
|
RMV (10") TRT/UNTRT BASE & ASPH PAV
|
SY
|
1,100.000
|
$10.000
|
$15.000
|
$30.992
|
$23.500
|
$30.000
|
$19.500
|
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
452.000
|
$15.000
|
$25.000
|
$5.161
|
$17.000
|
$30.000
|
$45.000
|
|
|
|
EXCAV (SPECIAL)
|
CY
|
135.000
|
$60.000
|
$67.000
|
$61.934
|
$32.000
|
$35.000
|
$15.000
|
|
|
|
EMBANK (FNL)(DC)(TY B)
|
CY
|
1,665.000
|
$40.000
|
$30.000
|
$37.771
|
$42.000
|
$150.000
|
$90.000
|
|
|
|
FURN & PLACE TOPSOIL (3")
|
SY
|
950.000
|
$5.000
|
$10.000
|
$2.642
|
$4.000
|
$10.000
|
$105.000
|
|
|
|
BROADCAST SEED (PERM_URBAN_SAND)
|
SY
|
12,287.000
|
$0.500
|
$0.500
|
$0.745
|
$0.350
|
$0.750
|
$0.320
|
|
|
|
BROADCAST SEED (TEMP_WARM_COOL)
|
SY
|
13,237.000
|
$0.250
|
$0.500
|
$0.206
|
$0.350
|
$0.750
|
$0.320
|
|
|
|
SOIL RET BLKT(SL_MOD_SAND_LONG)
|
SY
|
12,287.000
|
$4.000
|
$8.000
|
$2.476
|
$2.100
|
$5.000
|
$1.900
|
|
|
|
RDSIDE AMENITY (WHEEL STOP REMOV&RESET)
|
EA
|
25.000
|
$100.000
|
$190.000
|
$346.370
|
$100.000
|
$200.000
|
$269.490
|
|
|
|
D-GR HMA TY-D SAC-A PG70-28
|
TON
|
436.000
|
$185.000
|
$342.000
|
$113.134
|
$230.000
|
$400.000
|
$252.000
|
|
|
|
TACK COAT
|
GAL
|
670.000
|
$9.000
|
$6.000
|
$4.153
|
$7.000
|
$10.000
|
$9.450
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
1,000.000
|
$100.000
|
$70.000
|
$46.572
|
$143.000
|
$200.000
|
$267.550
|
|
|
|
PLANE ASPH CONC PAV (0" TO 1.5")
|
SY
|
5,058.000
|
$5.200
|
$3.000
|
$2.642
|
$2.900
|
$10.000
|
$7.390
|
|
|
|
CONC PAV (JOINT REINF) (8")
|
SY
|
450.000
|
$20.000
|
$220.000
|
$132.426
|
$155.000
|
$160.000
|
$148.590
|
|
|
|
CEM STABIL BKFL
|
CY
|
3.000
|
$325.000
|
$675.000
|
$185.804
|
$260.000
|
$1,000.000
|
$707.150
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,107.000
|
$4.000
|
$10.000
|
$24.385
|
$5.500
|
$20.000
|
$12.630
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,716.000
|
$30.000
|
$20.000
|
$46.645
|
$32.400
|
$70.000
|
$41.500
|
|
|
|
SOIL NAIL ANCHORS
|
LF
|
608.000
|
$35.000
|
$70.000
|
$47.592
|
$41.000
|
$150.000
|
$82.000
|
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
40.000
|
$280.000
|
$300.000
|
$313.803
|
$328.000
|
$300.000
|
$288.000
|
|
|
|
CL A CONC (MISC)
|
CY
|
35.000
|
$715.000
|
$800.000
|
$657.380
|
$760.000
|
$1,000.000
|
$833.770
|
|
|
|
CL A CONC (FLUME)
|
CY
|
146.000
|
$715.000
|
$800.000
|
$566.247
|
$605.000
|
$1,000.000
|
$865.000
|
|
|
|
CL A CONC (COLLAR)
|
EA
|
9.000
|
$1,100.000
|
$1,000.000
|
$1,322.685
|
$2,090.000
|
$3,000.000
|
$2,525.550
|
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
175.000
|
$790.000
|
$800.000
|
$602.512
|
$534.000
|
$600.000
|
$833.770
|
|
|
|
RETAINING WALL (MSE)
|
SF
|
3,422.000
|
$130.000
|
$70.000
|
$142.799
|
$140.000
|
$150.000
|
$192.190
|
|
|
|
RETAINING WALL (SPREAD FOOTING)
|
SF
|
98.000
|
$110.000
|
$117.000
|
$290.376
|
$180.000
|
$100.000
|
$95.360
|
|
|
|
RETAINING WALL (SOIL NAIL) (FASCIA)
|
SF
|
527.000
|
$80.000
|
$117.000
|
$142.338
|
$195.000
|
$100.000
|
$166.440
|
|
|
|
CONCRETE PAINT FINISH
|
SF
|
4,460.000
|
$1.000
|
$9.000
|
$0.869
|
$0.910
|
$1.000
|
$0.850
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
12.000
|
$700.000
|
$705.000
|
$615.633
|
$1,200.000
|
$1,200.000
|
$833.770
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
8.000
|
$700.000
|
$735.000
|
$580.173
|
$790.000
|
$750.000
|
$833.770
|
|
|
|
RIPRAP (CONC)(CL A)
|
CY
|
6.000
|
$700.000
|
$1,040.000
|
$681.284
|
$1,000.000
|
$700.000
|
$1,022.850
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
41.000
|
$700.000
|
$795.000
|
$483.612
|
$692.000
|
$750.000
|
$833.770
|
|
|
|
RAIL (TY C221)
|
LF
|
1,143.000
|
$165.000
|
$205.000
|
$128.630
|
$145.000
|
$160.000
|
$238.440
|
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
152.000
|
$120.000
|
$185.000
|
$139.735
|
$228.000
|
$215.000
|
$225.810
|
|
|
|
GABION MATTRESSES (GALV)(12 IN)
|
SY
|
86.000
|
$90.000
|
$238.000
|
$206.077
|
$210.000
|
$140.000
|
$310.800
|
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
65.000
|
$80.000
|
$269.000
|
$196.144
|
$157.000
|
$150.000
|
$90.000
|
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
1.000
|
$7,500.000
|
$7,350.000
|
$7,533.626
|
$8,600.000
|
$6,000.000
|
$7,731.970
|
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
1.000
|
$9,000.000
|
$7,850.000
|
$5,077.150
|
$10,200.000
|
$7,000.000
|
$9,508.700
|
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
1.000
|
$11,000.000
|
$4,300.000
|
$8,726.631
|
$13,200.000
|
$7,500.000
|
$10,862.390
|
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
2.000
|
$12,200.000
|
$4,300.000
|
$7,823.413
|
$14,000.000
|
$13,500.000
|
$13,720.050
|
|
|
|
INLET (COMPL)(PCO)(4FT)(BOTH)
|
EA
|
1.000
|
$13,000.000
|
$7,835.000
|
$9,877.795
|
$15,000.000
|
$9,500.000
|
$18,668.870
|
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
2.000
|
$11,000.000
|
$9,200.000
|
$5,981.331
|
$11,800.000
|
$9,500.000
|
$9,407.680
|
|
|
|
INL(CMP)(PAZD-CZ)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
2.000
|
$13,000.000
|
$10,400.000
|
$8,652.447
|
$13,500.000
|
$12,500.000
|
$14,677.240
|
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
1.000
|
$2,900.000
|
$4,285.000
|
$2,787.071
|
$2,560.000
|
$7,000.000
|
$5,682.490
|
|
|
|
GRATE AND FRAME (BRIDGE DRAIN)
|
EA
|
2.000
|
$2,700.000
|
$1,470.000
|
$4,837.283
|
$5,480.000
|
$2,500.000
|
$11,809.400
|
|
|
|
ADJUSTING MANHOLES (CAP)
|
EA
|
2.000
|
$500.000
|
$615.000
|
$454.189
|
$2,300.000
|
$1,500.000
|
$1,600.570
|
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
6.000
|
$500.000
|
$367.000
|
$887.321
|
$580.000
|
$1,500.000
|
$839.660
|
|
|
|
ADJUSTING MANHOLES (WATER METER)
|
EA
|
1.000
|
$500.000
|
$612.000
|
$598.704
|
$580.000
|
$1,500.000
|
$839.650
|
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$900.000
|
$700.000
|
$646.187
|
$900.000
|
$3,000.000
|
$441.970
|
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$900.000
|
$1,835.000
|
$1,766.966
|
$2,000.000
|
$3,000.000
|
$2,399.270
|
|
|
|
REMOV STR (SMALL)
|
EA
|
1.000
|
$900.000
|
$1,470.000
|
$3,138.036
|
$2,000.000
|
$3,000.000
|
$5,682.490
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$275,000.000
|
$265,000.000
|
$346,746.557
|
$376,000.000
|
$460,000.000
|
$489,446.750
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$12,500.000
|
$3,000.000
|
$27,879.120
|
$3,700.000
|
$7,625.000
|
$1,509.630
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
1.000
|
$13,000.000
|
$7,500.000
|
$7,845.090
|
$15,000.000
|
$18,500.000
|
$14,957.770
|
|
|
|
TMA (STATIONARY)
|
DAY
|
140.000
|
$300.000
|
$185.000
|
$165.159
|
$300.000
|
$400.000
|
$250.000
|
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
10.000
|
$105.000
|
$200.000
|
$61.026
|
$100.000
|
$95.000
|
$365.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
211.000
|
$6.000
|
$3.000
|
$3.773
|
$8.650
|
$7.000
|
$8.000
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
211.000
|
$1.000
|
$1.000
|
$1.032
|
$2.300
|
$2.000
|
$2.250
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
674.000
|
$6.000
|
$8.000
|
$6.234
|
$4.600
|
$6.000
|
$4.500
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
674.000
|
$1.000
|
$1.000
|
$1.651
|
$1.150
|
$3.000
|
$1.050
|
|
|
|
COLORED TEXTURED CONC (5")
|
SY
|
230.000
|
$107.000
|
$200.000
|
$96.893
|
$100.000
|
$100.000
|
$154.490
|
|
|
|
CONC CURB (TY II)
|
LF
|
521.000
|
$46.000
|
$23.000
|
$42.587
|
$18.400
|
$60.000
|
$60.230
|
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
627.000
|
$50.000
|
$42.000
|
$105.393
|
$44.000
|
$60.000
|
$60.230
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
620.000
|
$135.000
|
$115.000
|
$173.812
|
$163.000
|
$125.000
|
$134.490
|
|
|
|
CONC SIDEWALKS (5")
|
SY
|
5,146.000
|
$95.000
|
$75.000
|
$68.392
|
$77.000
|
$110.000
|
$99.690
|
|
|
|
CONC SIDEWALK (STEPS)
|
SY
|
3.000
|
$200.000
|
$675.000
|
$24.773
|
$3,600.000
|
$300.000
|
$277.920
|
|
|
|
CURB RAMPS (TY 1)
|
EA
|
26.000
|
$2,200.000
|
$1,200.000
|
$1,146.124
|
$4,300.000
|
$1,500.000
|
$2,220.330
|
|
|
|
CURB RAMPS (TY 2)
|
EA
|
13.000
|
$2,200.000
|
$1,200.000
|
$2,283.906
|
$3,600.000
|
$1,900.000
|
$2,220.330
|
|
|
|
CONCRETE SIDEWALK (RETAINING WALL)
|
CY
|
81.000
|
$1,500.000
|
$490.000
|
$999.208
|
$888.000
|
$1,000.000
|
$833.770
|
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE A)
|
SY
|
78.000
|
$270.000
|
$500.000
|
$41.289
|
$1,450.000
|
$295.000
|
$1,256.180
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
525.000
|
$38.000
|
$75.000
|
$63.899
|
$39.100
|
$36.000
|
$35.000
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,500.000
|
$2,500.000
|
$1,238.698
|
$1,610.000
|
$1,250.000
|
$1,470.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
280.000
|
$4.000
|
$1.000
|
$2.477
|
$17.000
|
$2.000
|
$4.200
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$300.000
|
$350.000
|
$189.330
|
$1,500.000
|
$200.000
|
$420.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$3,500.000
|
$4,000.000
|
$2,742.288
|
$4,025.000
|
$3,500.000
|
$3,675.000
|
|
|
|
CHAIN LINK FENCE (INSTALL) (4')
|
LF
|
350.000
|
$40.000
|
$60.000
|
$9.909
|
$33.000
|
$100.000
|
$29.000
|
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
360.000
|
$10.000
|
$1.000
|
$10.735
|
$6.050
|
$15.000
|
$5.500
|
|
|
|
GATE (SPECIAL)
|
EA
|
1.000
|
$200.000
|
$10,000.000
|
$2,147.077
|
$2,875.000
|
$5,000.000
|
$2,625.000
|
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
244.000
|
$35.000
|
$80.000
|
$38.537
|
$40.250
|
$40.000
|
$42.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
40.000
|
$1,000.000
|
$550.000
|
$735.511
|
$768.200
|
$800.000
|
$840.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
3.000
|
$1,100.000
|
$920.000
|
$802.676
|
$838.350
|
$850.000
|
$1,073.360
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,200.000
|
$930.000
|
$1,213.374
|
$1,267.300
|
$1,175.000
|
$1,483.760
|
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
27.000
|
$400.000
|
$245.000
|
$731.107
|
$763.600
|
$725.000
|
$915.510
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
17.000
|
$120.000
|
$95.000
|
$94.966
|
$340.000
|
$100.000
|
$126.280
|
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,556.000
|
$11.000
|
$9.000
|
$8.698
|
$13.500
|
$12.000
|
$15.150
|
|
|
|
REMOVE LRSA
|
EA
|
2.000
|
$1,070.000
|
$1,500.000
|
$825.799
|
$980.000
|
$1,250.000
|
$1,578.470
|
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
1.000
|
$10,550.000
|
$10,000.000
|
$7,689.481
|
$20,000.000
|
$15,000.000
|
$18,941.630
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2
|
EA
|
11.000
|
$25.000
|
$75.000
|
$40.877
|
$48.300
|
$50.000
|
$53.040
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
|
EA
|
23.000
|
$25.000
|
$50.000
|
$19.893
|
$48.300
|
$40.000
|
$53.040
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
10.000
|
$20.000
|
$25.000
|
$23.122
|
$57.500
|
$15.000
|
$18.940
|
|
|
|
INSTL OM SM RD SIGN (1-OM-PW)Y
|
EA
|
14.000
|
$10.000
|
$250.000
|
$14.313
|
$14.950
|
$15.000
|
$18.940
|
|
|
|
INSTL OM LG RD SIGN (2-OM-PW)Y
|
EA
|
1.000
|
$10.000
|
$250.000
|
$14.313
|
$14.950
|
$15.000
|
$18.940
|
|
|
|
INSTL OM LG RD SIGN (3-OM-PW)Y
|
EA
|
1.000
|
$10.000
|
$250.000
|
$14.313
|
$14.950
|
$15.000
|
$18.940
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
134.000
|
$2.000
|
$1.500
|
$0.825
|
$5.000
|
$1.000
|
$1.520
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
40.000
|
$1.000
|
$1.500
|
$1.052
|
$5.000
|
$1.000
|
$1.520
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
370.000
|
$1.600
|
$5.000
|
$4.954
|
$5.200
|
$4.500
|
$5.680
|
|
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
145.000
|
$8.000
|
$17.000
|
$16.515
|
$17.250
|
$15.000
|
$18.940
|
|
|
|
RE PM TY II (W) 4" (SLD)
|
LF
|
1,270.000
|
$0.200
|
$2.500
|
$2.202
|
$2.300
|
$2.000
|
$2.530
|
|
|
|
RE PM TY II (W) 6" (SLD)
|
LF
|
2,927.000
|
$0.300
|
$2.600
|
$2.312
|
$2.450
|
$2.100
|
$2.650
|
|
|
|
RE PM TY II (W) 24" (SLD)
|
LF
|
1,297.000
|
$6.000
|
$8.000
|
$6.606
|
$6.900
|
$6.000
|
$6.300
|
|
|
|
RE PM TY II (W) (ARROW)
|
EA
|
2.000
|
$150.000
|
$125.000
|
$110.106
|
$115.000
|
$100.000
|
$105.000
|
|
|
|
RE PM TY II (W) (BIKE ARROW)
|
EA
|
16.000
|
$150.000
|
$125.000
|
$110.106
|
$115.000
|
$100.000
|
$105.000
|
|
|
|
RE PM TY II (W) (BIKE SYMBOL)
|
EA
|
16.000
|
$150.000
|
$200.000
|
$165.159
|
$172.500
|
$150.000
|
$160.000
|
|
|
|
RE PM TY II (Y) 4" (BRK)
|
LF
|
390.000
|
$0.200
|
$2.500
|
$2.202
|
$2.300
|
$2.000
|
$2.250
|
|
|
|
RE PM TY II (Y) 6" (BRK)
|
LF
|
420.000
|
$0.300
|
$2.600
|
$2.312
|
$2.450
|
$2.100
|
$2.250
|
|
|
|
RE PM TY II (Y)(CURB)
|
LF
|
450.000
|
$1.000
|
$8.000
|
$6.606
|
$6.900
|
$6.000
|
$6.300
|
|
|
|
RE PM TY II (R&W) 6" (FIRE LANE)
|
LF
|
60.000
|
$2.000
|
$25.000
|
$22.021
|
$23.000
|
$20.000
|
$21.000
|
|
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
120.000
|
$0.700
|
$5.000
|
$4.679
|
$4.900
|
$4.250
|
$5.000
|
|
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
1,175.000
|
$0.700
|
$5.000
|
$4.679
|
$4.900
|
$4.250
|
$5.000
|
|
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
805.000
|
$0.700
|
$5.000
|
$4.679
|
$4.900
|
$4.250
|
$5.000
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
14.000
|
$11.000
|
$20.000
|
$16.515
|
$17.250
|
$15.000
|
$16.000
|
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
620.000
|
$1.000
|
$5.000
|
$3.303
|
$3.450
|
$3.000
|
$3.300
|
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
850.000
|
$1.000
|
$8.000
|
$7.156
|
$7.500
|
$6.500
|
$7.000
|
|
|
|
REPLACE OF TIMBER POLES
|
EA
|
11.000
|
$1,500.000
|
$675.000
|
$825.799
|
$5,750.000
|
$5,130.000
|
$3,000.000
|
|
|
|
REPLACE DOWN GUY AND ANCHOR W/GUARD
|
EA
|
5.000
|
$500.000
|
$3,100.000
|
$825.799
|
$2,875.000
|
$5,130.000
|
$2,500.000
|
|
|
|
ANTI-GRAFFITI COATNG (PERMNENT-TY III)
|
SF
|
4,460.000
|
$0.500
|
$9.000
|
$1.288
|
$1.350
|
$1.170
|
$1.480
|
|
|
|
TIED-CONCRETE BLOCK EROSION CONTROL MAT
|
SF
|
150.000
|
$12.000
|
$95.000
|
$2.477
|
$20.000
|
$20.000
|
$60.000
|
|
1
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
593.000
|
$105.000
|
$0.000
|
$69.818
|
$108.050
|
$120.000
|
$131.250
|
|
1
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
485.000
|
$200.000
|
$0.000
|
$116.632
|
$185.000
|
$200.000
|
$215.250
|
|
1A
|
|
THERMOPLASTIC PIPE (PP) (24")
|
LF
|
593.000
|
$105.000
|
$55.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
1A
|
|
THERMOPLASTIC PIPE (PP) (36")
|
LF
|
485.000
|
$200.000
|
$95.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
Totals: |
$3,611,767.450
|
$3,206,580.200
|
$3,484,848.349
|
$3,803,635.250
|
$4,685,972.900
|
$4,707,653.380
|