Show Job Controls
Bid Cobra

RAINS FM0275 (6335-47-001)

Items: 18

County: RAINS
Length: N/A
Highway: FM0275
District: PARIS
Control Number: 6335-47-001
DBE Goal: N/A
Project: RMC - 633547001
Guaranty: N/A
Time: 45 W
Engineer's Estimate: $173,331.40
Date: 09/20/2018 (7 years ago)
Contract Number: N/A
Type: CROSS DRAINAGE STRUCTURE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$173,331.40
$165,494.00
Over/Under Est: -4.52% -$7,837.40
$166,040.00
Over/Under Est: -4.21% -$7,291.40
Amt Left: 0.33% $546.00
Over/Under Est: 6.86% $11,898.60
Amt Left: 11.93% $19,736.00
Delta: -11.56% -$19,190.00

Bid Items & Bid Tabulations

18 Total 0 of 18
RAINS  |  FM0275  |  PARIS  |  6335-47-001  |  09/20/2018  |  $173,331.40  |  RMC - 633547001  |  CROSS DRAINAGE STRUCT REPAIR  |  45 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
HIGHWAY 19 CONSTRUCTION LLC
L.C. JORDAN & SON
EAST TEXAS BRIDGE, INC.
BACKFILL (TY A OR B)
CY 78.000 $100.000 $50.000 $40.000 $50.000
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
SY 1,440.000 $1.750 $1.000 $6.000 $2.000
VEGETATIVE WATERING
MG 30.000 $150.000 $10.000 $150.000 $30.000
CUT & RESTORING PAV
SY 52.000 $150.000 $250.000 $180.000 $200.000
FLOWABLE BACKFILL
CY 55.000 $250.000 $180.000 $240.000 $400.000
TRENCH EXCAVATION PROTECTION
LF 182.000 $13.000 $10.000 $10.000 $5.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 16.000 $200.000 $180.000 $260.000 $300.000
RC PIPE (CL III)(24 IN)
LF 90.000 $150.000 $147.000 $120.000 $100.000
RC PIPE (CL III)(36 IN)
LF 92.000 $250.000 $187.000 $210.000 $200.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 4.000 $5,500.000 $4,500.000 $6,000.000 $3,000.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 4.000 $8,000.000 $6,500.000 $8,000.000 $6,000.000
REMOV STR (PIPE)
EA 4.000 $500.000 $1,500.000 $250.000 $1,000.000
MOBILIZATION
LS 1.000 $15,055.400 $40,000.000 $20,000.000 $18,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $5,000.000 $1,500.000 $2,000.000 $15,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 160.000 $6.000 $3.000 $3.000 $8.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 160.000 $3.000 $1.000 $1.000 $1.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 8.000 $50.000 $85.000 $60.000 $200.000
TMA (STATIONARY)
DAY 20.000 $350.000 $300.000 $350.000 $300.000
Totals: $173,331.400 $165,494.000 $166,040.000 $185,230.000