PRESIDIO US0090 (6491-63-001)

Items: 29

County: PRESIDIO
Length: 0.0100 MILES
Highway: US0090
District: EL PASO
Control Number: 6491-63-001
DBE Goal: 0.0%
Project: RMC - A00217905
Guaranty: $35,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,760,250.00
Date: 01/07/2026 (5 months ago) Changed
Contract Number: 1264204
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00217905
Project Description: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$1,760,250.00
$1,198,026.00
Over/Under Est: -31.94% -$562,224.00
Over/Under Est: -31.86% -$560,891.00
Amt Left: 0.11% $1,333.00
Over/Under Est: -26.85% -$472,600.00
Amt Left: 7.48% $89,624.00
Delta: -7.36% -$88,291.00
$2,053,905.00
Over/Under Est: 16.68% $293,655.00
Amt Left: 71.44% $855,879.00
Delta: -59.51% -$766,255.00

Bid Items & Bid Tabulations

29 Total 0 of 29
PRESIDIO  |  US0090  |  EL PASO  |  6491-63-001  |  01/07/2026  |  $1,760,250.00  |  RMC - A00217905  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
E.V.G. ENTERPRISE
APACHE BARRICADE & SIGN
BLACKSMITH VENTURES LLC
DAN WILLIAMS COMPANY
REMOV CONC (CURB)
LF 100.000 $8.000 $17.000 $49.000 $50.000 $30.000
RIPRAP (CONC)(CL B)
CY 170.000 $800.000 $728.000 $725.000 $800.000 $2,200.000
MOBILIZATION
LS 1.000 $250,000.000 $1.000 $300,000.000 $100,000.000 $200,000.000
TMA (STATIONARY)
DAY 160.000 $1,800.000 $3,000.000 $1,300.000 $4,400.000 $650.000
CONC CURB (TY II)
LF 100.000 $150.000 $45.000 $375.000 $100.000 $120.000
CONC SIDEWALKS (4")
SY 90.000 $300.000 $98.000 $525.000 $200.000 $325.000
REMOVE METAL BEAM GUARD FENCE
LF 3,300.000 $35.000 $1.000 $35.000 $1.000 $15.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $900.000 $1.000 $375.000 $500.000 $600.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 10.000 $1,000.000 $1.000 $275.000 $500.000 $600.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 50.000 $75.000 $100.000 $10.000 $100.000 $75.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 2,100.000 $100.000 $25.000 $29.000 $30.000 $65.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 35.000 $90.000 $28.000 $38.000 $100.000 $135.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 60.000 $75.000 $30.000 $265.000 $200.000 $950.000
REPLACE TIMBER POST W/O CONC FND
EA 220.000 $250.000 $250.000 $49.000 $50.000 $350.000
REPLACE STEEL POST W/O CONC FND
EA 120.000 $300.000 $250.000 $89.000 $100.000 $420.000
REALIGN POSTS
EA 90.000 $100.000 $100.000 $28.000 $50.000 $225.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 2.000 $1,500.000 $200.000 $175.000 $500.000 $1,750.000
REM OBSOLETE GET & REPL W/ SGT
EA 35.000 $7,500.000 $5,000.000 $3,400.000 $2,500.000 $12,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 2.000 $3,000.000 $1,000.000 $1,300.000 $1,300.000 $3,500.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,900.000 $100.000 $35.000 $39.000 $30.000 $70.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 325.000 $175.000 $300.000 $59.000 $50.000 $725.000
REPLACE BLOCKOUT
EA 500.000 $70.000 $100.000 $24.000 $25.000 $80.000
RESET SGT IMPACT HEAD
EA 5.000 $3,000.000 $1,000.000 $190.000 $100.000 $3,400.000
REPLACE SGT OBJECT MARKER
EA 35.000 $75.000 $100.000 $34.000 $50.000 $95.000
REPLACE SGT CABLE ANCHOR
EA 36.000 $300.000 $250.000 $244.000 $100.000 $330.000
REPLACE SGT CABLE ASSEMBLY
EA 20.000 $150.000 $250.000 $245.000 $150.000 $380.000
REPLACE SGT STRUT
EA 20.000 $100.000 $250.000 $125.000 $150.000 $340.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $1,500.000 $1,000.000 $1,400.000 $1,450.000 $8,900.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 25.000 $90.000 $30.000 $295.000 $50.000 $100.000
Totals: $1,760,250.000 $1,198,026.000 $1,199,359.000 $1,287,650.000 $2,053,905.000