POTTER IH0040 (6420-19-001)

Items: 14

County: POTTER
Length: N/A
Highway: IH0040
District: AMARILLO
Control Number: 6420-19-001
DBE Goal: N/A
Project: RMC - 642019001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $339,820.00
Date: 11/02/2022 (3 years ago)
Contract Number: N/A
Type: CABLE MEDIAN BARRIER SYSTEM REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$339,820.00
$285,464.00
Over/Under Est: -16% -$54,356.00
$475,690.00
Over/Under Est: 39.98% $135,870.00
Amt Left: 66.64% $190,226.00
Over/Under Est: 139.57% $474,290.44
Amt Left: 185.19% $528,646.44
Delta: -71.14% -$338,420.44

Bid Items & Bid Tabulations

14 Total 0 of 14
POTTER  |  IH0040  |  AMARILLO  |  6420-19-001  |  11/02/2022  |  $339,820.00  |  RMC - 642019001  |  CABLE MEDIAN BARRIER SYSTEM REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BK FIELD OPERATIONS LLC
HJC FARMS, INC.
BLACKSTONE CONCRETE VENTURES, LLC
MOBILIZATION (CALLOUT)
EA 14.000 $3,250.000 $1.000 $1,000.000 $9,522.860
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 300.000 $10.000 $10.000 $22.000 $24.780
REPLACE POSTS (TL-3)
EA 30.000 $150.000 $5.000 $244.000 $245.360
REPLACE POSTS (TL-4)
EA 1,000.000 $160.000 $230.000 $297.000 $312.670
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 10.000 $260.000 $1.000 $265.000 $327.840
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 30.000 $210.000 $20.000 $265.000 $327.840
REPAIR CONCRETE FOUNDATION (TL-3)
EA 10.000 $82.000 $1.000 $50.000 $1,651.200
REPAIR CONCRETE FOUNDATION (TL-4)
EA 10.000 $200.000 $1.000 $50.000 $1,651.200
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 10.000 $1,200.000 $1.000 $3,094.000 $6,340.800
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 20.000 $1,500.000 $2,000.000 $3,594.000 $6,340.800
REPLACE CABLE (TL-3)
LF 100.000 $6.000 $0.100 $2.250 $14.990
REPLACE CABLE (TL-4)
LF 500.000 $6.000 $3.000 $2.250 $12.530
CHECK / RE-TENSION CABLE
EA 200.000 $160.000 $50.000 $100.000 $156.300
TMA (STATIONARY)
DAY 150.000 $250.000 $1.000 $100.000 $519.600
Totals: $339,820.000 $285,464.000 $475,690.000 $814,110.440