Show Job Controls
Bid Cobra

POTTER IH0040 (6357-22-001)

Items: 19

County: POTTER
Length: N/A
Highway: IH0040
District: AMARILLO
Control Number: 6357-22-001
DBE Goal: N/A
Project: MMC - 635722001
Guaranty: N/A
Time: 120 CALENDAR DAYS
Engineer's Estimate: $143,788.92
Date: 09/09/2020 (5 years ago)
Contract Number: N/A
Type: HYDRATED LIME (MATERIALS ONLY)
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$143,788.92
$165,400.00
Over/Under Est: 15.03% $21,611.08

Bid Items & Bid Tabulations

19 Total 0 of 19
POTTER  |  IH0040  |  AMARILLO  |  6357-22-001  |  09/09/2020  |  $143,788.92  |  MMC - 635722001  |  HYDRATED LIME (MATERIALS ONLY)  |  120 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DIGG COMMERCIAL, LLC
LIME (HYD) (DRY) (SITE 7)
BAG 950.000 $12.330 $14.000
LIME (HYDRATED LIME (DRY))(SITE 1)
TON 24.000 $246.620 $275.000
LIME (HYDRATED LIME (DRY))(SITE 2)
TON 24.000 $248.670 $275.000
LIME (HYDRATED LIME (DRY))(SITE 3)
TON 24.000 $246.820 $275.000
LIME (HYDRATED LIME (DRY))(SITE 4)
TON 24.000 $244.970 $275.000
LIME (HYDRATED LIME (DRY))(SITE 6)
TON 24.000 $243.430 $275.000
LIME (HYDRATED LIME (DRY))(SITE 7)
TON 24.000 $243.120 $275.000
LIME (HYDRATED LIME (DRY))(SITE 8)
TON 24.000 $237.880 $275.000
LIME (HYD)(DRY)(SITE 12)
BAG 950.000 $12.050 $14.000
LIME (HYD)(DRY)(SITE 14)
BAG 950.000 $12.030 $14.000
LIME (HYD)(DRY)(SITE 16)
BAG 950.000 $12.010 $14.000
LIME (HYD)(DRY)(SITE 10)
TON 24.000 $242.510 $275.000
LIME (HYD)(DRY)(SITE 11)
TON 24.000 $245.280 $275.000
LIME (HYD)(DRY)(SITE 12)
TON 24.000 $234.590 $275.000
LIME (HYD)(DRY)(SITE 13)
TON 48.000 $232.500 $275.000
LIME (HYD)(DRY)(SITE 14)
TON 24.000 $233.360 $275.000
LIME (HYD)(DRY)(SITE 15)
TON 24.000 $240.960 $275.000
LIME (HYD)(DRY)(SITE 16)
TON 48.000 $235.000 $275.000
LIME (HYD)(DRY)(SITE 17)
TON 24.000 $231.370 $275.000
Totals: $143,788.920 $165,400.000