Show Job Controls
Bid Cobra

POTTER SL 335 (2635-04-042)

Items: 65

County: POTTER
Length: N/A
Highway: SL 335
District: AMARILLO
Control Number: 2635-04-042
DBE Goal: N/A
Project: STP 2023(380)HES
Guaranty: N/A
Time: 88 WORKING DAYS
Engineer's Estimate: $2,548,524.55
Date: 01/05/2023 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
JOE CHAPPELL
CC SYSOMBATH
KENNETH PETR
THOMAS NAGEL
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$2,548,524.55
$2,622,116.83
Over/Under Est: 2.89% $73,592.28
Over/Under Est: 17.15% $437,111.90
Amt Left: 13.86% $363,519.62
$3,118,070.67
Over/Under Est: 22.35% $569,546.12
Amt Left: 18.91% $495,953.84
Delta: -4.44% -$132,434.22
Over/Under Est: 23.39% $596,126.55
Amt Left: 19.93% $522,534.27
Delta: -0.85% -$26,580.43

Bid Items & Bid Tabulations

65 Total 0 of 65
POTTER  |  SL 335  |  AMARILLO  |  2635-04-042  |  01/05/2023  |  $2,548,524.55  |  STP 2023(380)HES  |  HAZARD ELIM & SAFETY  |  88 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HJC FARMS, INC.
L A FULLER & SONS CONSTRUCTION, LTD.
GILVIN-TERRILL, LTD.
SCR CIVIL CONSTRUCTION, LLC
REMOVING CONC (RIPRAP)
SY 280.000 $25.000 $13.100 $11.900 $25.000 $13.300
REMOVING CONC (CTB)
LF 128.000 $50.000 $28.500 $26.000 $75.000 $29.000
REMOVING STAB BASE & ASPH PAV(14")
SY 1,213.000 $16.000 $31.000 $16.900 $50.000 $18.900
REMOVING STAB BASE AND ASPH PAV (4")
SY 323.000 $16.000 $23.000 $34.300 $50.000 $38.350
EXCAVATION (ROADWAY)
CY 1,584.000 $30.000 $22.000 $33.500 $50.000 $37.500
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 622.000 $30.000 $55.000 $38.500 $50.000 $43.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
AC 4.690 $1,385.000 $2,000.000 $840.000 $2,000.000 $2,010.000
FL BS(CMP IN PLC)(TY A,B OR D GR4)(12")
SY 4,250.000 $42.000 $55.000 $31.600 $50.000 $35.300
LIME TRT (SUBGRADE)(8")
SY 4,250.000 $10.000 $16.500 $14.200 $30.000 $15.900
LIME (HYD(SLY OR DRY) COM OR QK(DRY)
TON 46.000 $300.000 $440.000 $425.000 $360.000 $475.000
PRIME COAT (MC-30)
GAL 1,064.000 $7.000 $8.000 $8.800 $10.000 $10.000
TRENCH EXCAVATION PROTECTION
LF 65.000 $10.000 $10.000 $28.000 $50.000 $31.300
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 152.000 $300.000 $350.000 $440.000 $325.000 $365.000
CL C CONC (RAIL FOUNDATION)
CY 28.000 $850.000 $897.000 $900.000 $1,000.000 $1,540.000
RIPRAP (CONC)(4 IN)
CY 98.000 $690.000 $545.000 $900.000 $750.000 $910.000
RIPRAP (MOW STRIP)(4 IN)
CY 616.000 $600.000 $550.000 $750.000 $500.000 $904.000
RAIL (TY SSTR)
LF 202.000 $105.000 $155.000 $340.000 $200.000 $166.000
RC PIPE (CL III)(30 IN)
LF 56.000 $210.000 $335.000 $303.000 $400.000 $339.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 3.000 $12,500.000 $9,400.000 $8,540.000 $15,000.000 $9,440.000
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
EA 1.000 $12,500.000 $8,475.000 $7,705.000 $15,000.000 $8,610.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 1.000 $2,900.000 $6,535.000 $5,940.000 $12,500.000 $6,635.000
ADJUSTING INLET (CAP)
EA 1.000 $2,100.000 $4,855.000 $4,415.000 $5,000.000 $4,935.000
REMOV STR (INLET)
EA 2.000 $750.000 $1,510.000 $1,375.000 $1,600.000 $1,540.000
REMOV STR (PIPE)
LF 24.000 $45.000 $77.500 $70.500 $220.000 $79.000
MOBILIZATION
LS 1.000 $275,000.000 $250,000.000 $152,655.000 $310,000.000 $223,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $20,000.000 $2,500.000 $2,800.000 $40,000.000 $38,800.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 625.000 $5.000 $8.000 $3.300 $6.000 $4.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 625.000 $2.000 $1.000 $1.300 $2.000 $2.250
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 1,709.000 $70.000 $109.000 $200.000 $150.000 $116.000
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 123.000 $250.000 $322.500 $330.000 $250.000 $613.000
MTL W-BEAM GD FEN (STEEL POST)
LF 50.000 $38.000 $37.500 $50.000 $46.000 $52.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $3,000.000 $2,925.000 $3,900.000 $3,300.000 $3,966.000
CABLE BARRIER SYSTEM (TL-4)
LF 12,155.000 $16.000 $21.250 $28.000 $22.000 $25.000
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 6.000 $5,000.000 $6,000.000 $8,100.000 $10,225.000 $5,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,690.000 $6,450.000 $4,600.000 $3,950.000 $4,415.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 4.000 $28,500.000 $31,500.000 $42,000.000 $40,000.000 $40,300.000
REMOVE RD IL ASM (TRANS-BASE)
EA 11.000 $1,150.000 $1,127.500 $1,300.000 $1,025.000 $1,150.000
IN RD IL (TY ST) 40T-8 (250W EQ) LED
EA 19.000 $7,800.000 $5,100.000 $6,300.000 $4,665.000 $5,220.000
CONDT (PVC) (SCH 40) (2")
LF 4,120.000 $14.500 $18.500 $22.000 $16.750 $19.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 930.000 $33.000 $33.000 $41.000 $30.360 $34.000
ELEC CONDR (NO.8) BARE
LF 5,360.000 $2.200 $2.350 $2.700 $2.140 $2.400
ELEC CONDR (NO.8) INSULATED
LF 10,720.000 $2.250 $2.500 $3.000 $2.260 $2.550
GROUND BOX TY A (122311)W/APRON
EA 14.000 $1,800.000 $1,600.000 $2,000.000 $1,500.000 $1,680.000
REMOVE GROUND BOX
EA 3.000 $600.000 $135.000 $170.000 $125.000 $140.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 14.000 $940.000 $975.000 $1,300.000 $1,400.000 $1,225.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 6.000 $39.000 $47.000 $60.000 $44.000 $50.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
EA 6.000 $39.000 $38.000 $50.000 $41.000 $50.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)
EA 34.000 $36.000 $38.000 $50.000 $41.000 $50.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 6.000 $45.000 $38.000 $50.000 $41.000 $50.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 7.000 $140.000 $150.000 $200.000 $100.000 $176.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 3.000 $140.000 $150.000 $200.000 $100.000 $180.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 7.000 $150.000 $150.000 $200.000 $100.000 $185.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 4,060.000 $1.100 $3.300 $4.000 $3.000 $3.350
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 8,885.000 $2.000 $1.100 $1.300 $1.000 $1.150
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 75.000 $15.000 $16.500 $20.250 $15.000 $17.000
REFL PAV MRKR TY I-A
EA 4.000 $10.500 $22.000 $27.100 $20.000 $22.350
REFL PAV MRKR TY II-C-R
EA 662.000 $5.750 $5.500 $6.500 $5.000 $5.600
SP MIXES SP-D SAC-A PG70-28
TON 935.000 $250.000 $229.460 $208.600 $210.000 $235.000
TACK COAT
GAL 552.000 $7.000 $10.250 $9.400 $5.000 $10.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $7,500.000 $16,000.000 $20,000.000 $8,400.000
HPPM W/RET REQ TY I(W)6"(BRK)(090MIL)
LF 8,539.000 $0.800 $0.800 $1.000 $0.730 $0.850
HPPM W/RET REQ TY I(W)6"(SLD)(090MIL)
LF 38,607.000 $0.800 $0.770 $0.900 $0.700 $0.800
HPPM W/RET REQ TY I(Y)6"(SLD)(090MIL)
LF 38,607.000 $0.800 $0.770 $0.900 $0.700 $0.800
TMA (STATIONARY)
DAY 85.000 $300.000 $250.000 $300.000 $150.000 $475.000
TMA (MOBILE OPERATION)
HR 40.000 $90.000 $50.000 $125.000 $95.000 $132.000
Totals: $2,548,524.550 $2,622,116.830 $2,985,636.450 $3,118,070.670 $3,144,651.100