POTTER RM 2381 (2494-01-015)

Items: 80

County: POTTER
Length: N/A
Highway: RM 2381
District: AMARILLO
Control Number: 2494-01-015
DBE Goal: N/A
Project: F 2021(650)
Guaranty: N/A
Time: 174 WORKING DAYS
Engineer's Estimate: $1,972,566.65
Date: 06/04/2021 (5 years ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$1,972,566.65
$2,407,611.82
Over/Under Est: 22.05% $435,045.17
$2,642,280.70
Over/Under Est: 33.95% $669,714.05
Amt Left: 9.75% $234,668.88
$2,834,234.06
Over/Under Est: 43.68% $861,667.41
Amt Left: 17.72% $426,622.24
Delta: -7.26% -$191,953.36

Bid Items & Bid Tabulations

80 Total 0 of 80
POTTER  |  RM 2381  |  AMARILLO  |  2494-01-015  |  06/04/2021  |  $1,972,566.65  |  F 2021(650)  |  INTERS IMPRV  |  174 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
RK HALL, LLC
PREPARING ROW
AC 0.320 $500.000 $4,000.000 $20,000.000 $2,500.000
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 115.000 $300.000 $115.000 $200.000 $220.000
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 2.000 $400.000 $1,100.000 $500.000 $220.000
REMOVING STAB BASE AND ASPH PAV (3")
SY 721.000 $5.000 $10.000 $15.000 $35.200
REMOVING STAB BASE AND ASPH PAV (6")
SY 45.000 $5.000 $66.000 $20.000 $35.200
REMOVING STAB BASE & ASPH PAV (9")
SY 5,195.000 $5.000 $8.900 $22.500 $12.050
REMOVING STAB BASE AND ASPH PAV (10")
SY 1,026.000 $5.000 $13.800 $25.000 $15.400
EXCAVATION (ROADWAY)
CY 5,749.000 $15.000 $18.000 $25.000 $23.930
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 3,279.000 $15.000 $15.000 $25.000 $21.850
BACKFILL (TY A)
STA 18.000 $250.000 $270.000 $500.000 $345.270
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 8.360 $800.000 $540.000 $550.000 $561.000
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 8.700 $525.000 $410.000 $450.000 $426.800
FL BS (CMP IN PLC)(TY A OR B GR 4)(8")
SY 13,808.000 $15.000 $19.000 $30.000 $33.130
PRIME COAT (MC-30)
GAL 3,622.000 $4.000 $5.250 $4.150 $7.470
EMULS ASPH (EROSN CONT)(MULTI)
GAL 984.000 $4.000 $5.150 $6.500 $6.380
ASPH (MULTI OPTION)
GAL 5,503.000 $4.000 $4.450 $5.450 $4.260
AGGR(TY-B GR-4 SAC-A)
CY 141.000 $150.000 $180.000 $170.000 $662.780
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 2,025.000 $27.000 $18.900 $20.000 $25.410
PLANE ASPH CONC PAV(0" TO 2")
SY 1,801.000 $5.000 $6.650 $10.000 $6.330
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 184.000 $240.000 $290.000 $398.000 $302.500
RIPRAP (CONC)(6 IN)
CY 61.000 $500.000 $570.000 $600.000 $594.700
CONC BOX CULV (5 FT X 3 FT)
LF 30.000 $400.000 $935.000 $1,200.000 $1,174.370
RC PIPE (CL III)(30 IN)
LF 66.000 $180.000 $175.000 $250.000 $256.240
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 1.000 $9,500.000 $6,750.000 $18,000.000 $19,142.340
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $2,200.000 $3,175.000 $4,100.000 $3,658.080
REMOV STR (SET)
EA 1.000 $1,000.000 $935.000 $1,100.000 $4,060.230
REMOV STR (HEADWALL)
EA 4.000 $1,200.000 $1,165.000 $1,100.000 $2,210.230
REMOV STR (PIPE)
LF 26.000 $50.000 $45.000 $45.000 $37.660
MOBILIZATION
LS 1.000 $125,000.000 $238,000.000 $250,000.000 $278,148.840
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $15,000.000 $21,000.000 $15,000.000 $4,760.210
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 75.000 $5.000 $11.000 $10.000 $16.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 75.000 $1.500 $3.500 $5.000 $3.300
CONC CURB (TY I)
LF 374.000 $12.000 $56.000 $55.000 $58.630
RUMBLE STRIPS (SHOULDER)
LF 9,455.000 $0.150 $0.950 $0.450 $0.700
RUMBLE STRIPS (CENTERLINE)
LF 2,265.000 $0.250 $1.650 $0.550 $0.810
IN RD IL (TY ST) 40T-8 (250W EQ) LED
EA 23.000 $3,300.000 $5,200.000 $3,830.000 $5,390.000
CONDT (PVC) (SCH 40) (2")
LF 4,810.000 $9.000 $5.300 $12.000 $5.500
CONDT (PVC) (SCH 80) (2") (BORE)
LF 90.000 $20.000 $31.650 $25.000 $33.000
ELEC CONDR (NO.8) BARE
LF 5,150.000 $1.250 $1.100 $1.500 $1.100
ELEC CONDR (NO.8) INSULATED
LF 10,300.000 $1.300 $1.350 $1.600 $1.380
GROUND BOX TY A (122311)W/APRON
EA 3.000 $1,000.000 $1,320.000 $680.000 $1,375.000
ELC SRV TY A 240/480 060(NS)SS(E)TP(O)
EA 1.000 $5,500.000 $8,970.000 $6,325.000 $9,350.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 8.000 $700.000 $665.000 $500.000 $705.100
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 10.000 $900.000 $780.000 $600.000 $855.800
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,000.000 $1,265.000 $1,800.000 $1,386.000
REMOVE SM RD SN SUP&AM
EA 28.000 $105.000 $160.000 $60.000 $110.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 30.000 $20.000 $64.000 $35.000 $22.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 15.000 $100.000 $220.000 $145.000 $129.800
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 12.000 $100.000 $230.000 $180.000 $136.400
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 7,574.000 $0.350 $0.420 $0.400 $0.440
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 225.000 $2.000 $0.840 $0.800 $0.880
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 4,013.000 $0.750 $0.840 $0.800 $0.880
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 14.000 $10.000 $21.100 $20.000 $22.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 7.000 $150.000 $316.650 $300.000 $330.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 7.000 $50.000 $422.200 $400.000 $440.000
WK ZN PAV MRK NON-REMOV(W)18"(YLD TRI)
EA 10.000 $50.000 $21.100 $20.000 $22.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 14,298.000 $0.350 $0.420 $0.400 $0.440
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,108.000 $1.500 $1.200 $1.000 $2.100
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 794.000 $0.250 $1.250 $1.000 $2.100
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 225.000 $2.000 $0.950 $0.900 $0.990
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 4,077.000 $0.900 $0.950 $0.900 $0.990
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 14.000 $9.000 $26.400 $25.000 $27.500
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 7.000 $200.000 $211.000 $200.000 $220.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 7.000 $200.000 $316.650 $300.000 $330.000
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 10.000 $50.000 $42.250 $40.000 $44.000
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
LF 310.000 $9.000 $12.650 $12.000 $13.200
REFL PAV MRKR TY I-C
EA 230.000 $3.000 $4.250 $4.000 $4.400
REFL PAV MRKR TY II-A-A
EA 501.000 $3.000 $4.250 $4.000 $4.400
ELIM EXT PAV MRK & MRKS (4")
LF 5,538.000 $0.800 $0.840 $0.800 $0.880
D-GR HMA TY-B PG64-28
TON 2,265.000 $120.000 $122.000 $110.000 $162.970
SP MIXES SP-D SAC-A PG70-28
TON 2,862.000 $130.000 $123.000 $115.000 $153.110
TACK COAT
GAL 235.000 $5.000 $4.700 $6.000 $11.810
UNDERSEAL COURSE
GAL 6,044.000 $5.000 $11.250 $8.500 $6.280
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $15,000.000 $21,300.000 $15,000.000 $12,103.430
HPPM W/RET REQ TY I(W)4"(SLD)(090MIL)
LF 9,919.000 $0.500 $0.470 $0.450 $0.500
HPPM W/RET REQ TY I(Y)4"(BRK)(090MIL)
LF 100.000 $0.500 $0.470 $0.450 $0.500
HPPM W/RET REQ TY I(Y)4"(SLD)(090MIL)
LF 15,098.000 $0.500 $0.470 $0.450 $0.500
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 128.000 $5.000 $26.400 $25.000 $27.500
TMA (STATIONARY)
DAY 165.000 $325.000 $470.000 $500.000 $493.670
TMA (MOBILE OPERATION)
HR 100.000 $75.000 $78.000 $95.000 $105.520
Totals: $1,972,566.650 $2,407,611.820 $2,642,280.700 $2,834,234.060