Show Job Controls
Bid Cobra

POTTER RM 1061 (1245-02-052)

Items: 97

County: POTTER
Length: 3.2180 MILES
Highway: RM 1061
District: AMARILLO
Control Number: 1245-02-052
DBE Goal: 0.0%
Project: F 2026(527)
Guaranty: $100,000.00
Time: 137 WORKING DAYS
Engineer's Estimate: $7,802,744.75
Date: 04/07/2026 (2 months ago)
Contract Number: 4263007
Type: PREVENTIVE MAINTENANCE
Project ID: A00209966
Contract Type: Federal
Project Description: OVERLAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$7,802,744.75
Over/Under Est: -4.04% -$315,420.45
Over/Under Est: -2.61% -$203,891.64
Amt Left: 1.49% $111,528.81
$7,872,239.25
Over/Under Est: 0.89% $69,494.50
Amt Left: 5.14% $384,914.95
Delta: -3.60% -$273,386.14
$8,330,254.23
Over/Under Est: 6.76% $527,509.48
Amt Left: 11.26% $842,929.93
Delta: -5.82% -$458,014.98
$8,892,413.20
Over/Under Est: 13.97% $1,089,668.45
Amt Left: 18.77% $1,405,088.90
Delta: -6.75% -$562,158.97
Over/Under Est: 50.67% $3,953,521.77
Amt Left: 57.02% $4,268,942.22
Delta: -32.21% -$2,863,853.32

Bid Items & Bid Tabulations

97 Total 0 of 97
POTTER  |  RM 1061  |  AMARILLO  |  1245-02-052  |  04/07/2026  |  $7,802,744.75  |  F 2026(527)  |  PREVENT MAINT  |  137 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
L A FULLER & SONS CONSTRUCTION, LTD.
O. TREVINO CONSTRUCTION, LLC
GILVIN-TERRILL, LTD.
TI-ZACK CONCRETE, LLC
J. LEE MILLIGAN, INC.
RAGLE CONSTRUCTION, INC.
PREPARING ROW
AC 0.230 $40,000.000 $19,312.250 $160,000.000 $100,000.000 $5,000.000 $250,000.000 $35,000.000
PREP ROW (TREE PRUNE AND TRIM)
STA 4.000 $1,250.000 $795.150 $1,500.000 $2,500.000 $555.000 $25,000.000 $6,000.000
REMOV CONC (RIPRAP)
SY 3,321.000 $30.000 $21.100 $15.000 $15.000 $14.500 $14.000 $16.000
REMOV CONC (DRIVEWAYS)
SY 1,868.000 $30.000 $29.250 $15.000 $15.000 $17.400 $26.000 $14.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 858.000 $20.000 $26.550 $15.000 $15.000 $14.500 $15.000 $20.000
REMOV CONC (CURB)
LF 744.000 $15.000 $9.950 $5.000 $10.000 $7.200 $12.000 $9.000
RMV (0"-4") TRT/UNTRT BASE & ASPH PAV
SY 438.000 $10.000 $27.100 $15.000 $15.000 $10.000 $20.000 $15.000
EXCAV (ROADWAY)
CY 4,922.000 $29.700 $21.550 $15.000 $25.000 $53.100 $45.000 $200.000
SUBGR WIDEN (OC)
SY 2,770.000 $18.000 $9.900 $20.000 $10.000 $7.550 $25.000 $15.200
EMBANK (FNL)(DC)(TY B)
CY 764.000 $40.000 $50.800 $45.000 $25.000 $15.000 $60.000 $120.000
DRILL SEED (TEMP_WARM_COOL)
SY 29,141.000 $0.200 $0.250 $0.330 $0.400 $0.330 $1.000 $0.200
HYDRO MULCH SEED (PERM_URBAN_CLAY)
SY 29,141.000 $0.600 $0.850 $0.450 $0.500 $0.450 $1.000 $0.650
VEGETATIVE WATERING
TGL 488.000 $25.000 $50.900 $45.000 $25.000 $25.000 $30.000 $86.000
SOIL RET BLKT(SL_STEEP_CLAY_SHORT)
SY 2,778.000 $3.750 $6.350 $2.250 $3.000 $2.250 $2.500 $5.000
SP MIXES SP-D SAC-A PG70-28
TON 7,649.000 $130.000 $164.700 $186.440 $180.000 $174.000 $165.000 $250.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 250.000 $120.000 $200.650 $206.540 $160.000 $225.000 $183.000 $200.000
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 12,884.000 $3.000 $4.000 $5.200 $3.000 $4.800 $5.150 $5.000
CL A CONC (FLUME)
CY 7.000 $725.000 $855.200 $2,000.000 $800.000 $740.000 $2,700.000 $1,300.000
CL C CONC (ABUT)
CY 40.000 $2,000.000 $1,534.900 $1,000.000 $3,000.000 $740.000 $965.000 $1,700.000
CL C CONC (RAIL FOUNDATION)
CY 202.000 $800.000 $506.750 $650.000 $550.000 $550.000 $740.000 $573.000
RIPRAP (CONC)(4 IN)
CY 113.000 $725.000 $557.250 $650.000 $675.000 $740.000 $800.000 $801.000
RIPRAP (CONC)(5 IN)
CY 33.000 $750.000 $679.800 $650.000 $550.000 $740.000 $815.000 $726.000
RIPRAP (MOW STRIP)(4 IN)
CY 46.000 $725.000 $837.450 $952.700 $600.000 $740.000 $940.000 $698.000
RAIL (TY SSTR)
LF 375.000 $125.000 $138.450 $180.000 $110.000 $110.000 $215.000 $95.000
RAIL (HANDRAIL)(TY E)
LF 2,729.000 $180.000 $120.000 $85.000 $125.000 $127.000 $100.000 $96.000
RC PIPE (CL III)(48 IN)
LF 43.000 $450.000 $562.100 $650.000 $300.000 $436.000 $530.000 $302.000
INLET (COMPL)(TY S)
EA 10.000 $9,360.000 $14,725.110 $4,500.000 $5,500.000 $8,760.000 $7,900.000 $8,000.000
INLET (COMPL)(PSL)(FG)(4FTX5FT-3FTX5FT)
EA 2.000 $16,000.000 $12,265.450 $14,000.000 $9,500.000 $7,150.000 $15,000.000 $8,050.000
ADJUSTING MANHOLES
EA 10.000 $1,000.000 $1,087.260 $2,000.000 $750.000 $850.000 $750.000 $1,350.000
ADJUSTING MANHOLES (UTILITY BOX)
EA 1.000 $1,000.000 $981.710 $2,000.000 $750.000 $950.000 $1,500.000 $1,350.000
CLEAN EXIST CULVERTS
EA 2.000 $3,000.000 $5,196.100 $5,000.000 $2,000.000 $3,800.000 $2,000.000 $5,000.000
MOBILIZATION
LS 1.000 $650,000.000 $736,478.000 $755,000.000 $635,000.000 $818,227.000 $889,000.000 $1,100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $20,000.000 $8,473.300 $6,000.000 $2,100.000 $7,500.000 $35,000.000 $170,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $16,809.450 $16,500.000 $18,500.000 $11,600.000 $14,000.000 $30,000.000
TMA (STATIONARY)
DAY 144.000 $200.000 $415.950 $160.000 $230.000 $150.000 $350.000 $350.000
TMA (MOBILE OPERATION)
HR 40.000 $100.000 $105.550 $20.000 $95.000 $385.000 $100.000 $65.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 50.000 $70.000 $72.180 $77.380 $50.000 $37.500 $100.000 $75.000
ROCK FILTER DAMS (REMOVE)
LF 50.000 $30.000 $22.900 $20.630 $25.000 $10.000 $50.000 $20.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000 $21.950 $47.850 $34.050 $30.000 $32.800 $50.000 $33.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000 $8.020 $19.250 $17.540 $15.000 $4.100 $5.000 $17.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,899.000 $6.000 $6.350 $5.310 $5.000 $2.600 $4.000 $5.150
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,899.000 $1.020 $1.600 $1.030 $1.000 $0.500 $2.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,969.000 $7.150 $8.900 $5.420 $6.000 $2.650 $7.500 $5.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,969.000 $3.350 $1.250 $1.030 $2.000 $0.500 $4.000 $1.000
COLORED TEXTURED CONC (4")
SY 812.000 $100.000 $62.650 $66.000 $75.000 $125.000 $80.000 $100.000
CONC CURB (TY I)
LF 60.000 $40.000 $33.650 $90.000 $50.000 $76.000 $60.000 $37.000
CONC CURB (TY F2)
LF 101.000 $171.770 $183.800 $250.000 $375.000 $150.000 $250.000 $385.000
CONC CURB (TY F3)
LF 356.000 $175.000 $216.500 $250.000 $325.000 $250.000 $340.000 $422.000
CONC CURB (TY C2)
LF 2,207.000 $178.670 $89.850 $200.000 $140.000 $250.000 $230.000 $200.000
DRIVEWAYS (CONC)
SY 2,197.000 $120.000 $102.750 $95.000 $125.000 $105.000 $110.000 $97.000
CONC SIDEWALKS (5")
SY 16,069.000 $94.000 $58.280 $66.000 $75.000 $85.000 $80.000 $80.000
CURB RAMPS (TY 2)
SY 92.000 $120.000 $210.800 $125.000 $165.000 $135.000 $215.000 $166.000
CURB RAMPS (TY 5)
SY 44.000 $250.000 $229.400 $125.000 $165.000 $135.000 $215.000 $140.000
CURB RAMPS (TY 7)
SY 370.000 $250.000 $155.550 $125.000 $165.000 $135.000 $165.000 $147.000
CURB RAMPS (TY 10)
SY 21.000 $300.000 $497.800 $125.000 $165.000 $135.000 $270.000 $160.000
MTL W-BEAM GD FEN (STEEL POST)
LF 825.000 $35.750 $36.800 $41.470 $35.000 $32.000 $40.000 $30.000
MTL BEAM GD FEN TRANS (TL2)
EA 2.000 $3,075.000 $1,581.250 $1,793.320 $1,500.000 $1,380.000 $1,720.000 $1,400.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,068.710 $1,523.750 $1,793.310 $1,500.000 $1,330.000 $1,720.000 $1,350.000
REMOVE METAL BEAM GUARD FENCE
LF 1,300.000 $6.000 $3.450 $2.240 $3.000 $3.000 $3.000 $2.500
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $250.000 $345.000 $560.410 $300.000 $300.000 $540.000 $150.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 3.000 $250.000 $345.000 $560.410 $300.000 $300.000 $540.000 $150.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,800.000 $3,795.000 $4,483.290 $3,300.000 $3,300.000 $4,300.000 $3,325.000
CONDT (PVC) (SCH 40) (2")
LF 75.000 $25.000 $23.000 $26.710 $20.000 $31.300 $35.000 $31.250
CONDT (PVC) (SCH 40) (3")
LF 5.000 $100.000 $28.250 $33.390 $25.000 $50.000 $55.000 $50.000
CONDUIT (PREPARE)
LF 410.000 $3.630 $9.200 $10.680 $8.000 $4.750 $5.000 $4.750
ELEC CONDR (NO.6) BARE
LF 80.000 $5.000 $3.450 $4.010 $3.000 $6.500 $7.000 $6.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 9.000 $950.000 $914.250 $895.000 $800.000 $595.000 $960.000 $795.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 7.000 $1,100.000 $1,106.300 $1,070.000 $850.000 $745.000 $1,150.000 $962.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 19.000 $1,050.000 $1,114.350 $1,125.000 $850.000 $750.000 $1,200.000 $969.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,238.400 $1,628.400 $1,500.000 $1,000.000 $1,150.000 $1,610.000 $1,416.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $720.000 $886.650 $920.000 $650.000 $618.000 $990.000 $771.000
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 8.000 $550.000 $162.150 $250.000 $400.000 $345.000 $270.000 $141.000
REMOVE SM RD SN SUP&AM
EA 31.000 $110.000 $127.350 $150.000 $100.000 $92.000 $160.000 $150.000
INSTL OM SM RD SIGN (1-OM-PW)Y
EA 29.000 $10.000 $14.950 $25.000 $20.000 $50.000 $27.000 $13.000
INSTL OM SM RD SIGN (1-OM-PW)R
EA 7.000 $10.000 $14.950 $25.000 $20.000 $50.000 $27.000 $13.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 425.000 $1.240 $2.300 $1.000 $2.000 $2.000 $1.300 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,612.000 $0.900 $1.250 $0.880 $1.100 $1.100 $1.300 $0.880
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,118.000 $7.410 $8.350 $6.770 $7.250 $7.250 $13.000 $6.770
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 19.000 $150.000 $215.050 $170.000 $187.000 $187.000 $245.000 $170.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $150.000 $218.500 $175.000 $190.000 $190.000 $350.000 $175.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 3,481.000 $0.550 $0.750 $0.570 $0.650 $0.650 $1.100 $0.570
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 3,559.000 $0.550 $0.850 $0.570 $0.750 $0.750 $1.100 $0.570
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 16,080.000 $0.400 $0.750 $0.550 $0.650 $0.650 $1.100 $0.550
RECESSED REFL PAV MRKR TY I-C
EA 431.000 $40.000 $46.300 $10.000 $40.250 $40.300 $55.000 $10.000
RECESSED REFL PAV MRKR TY II-A-A
EA 484.000 $40.000 $46.300 $10.000 $40.250 $40.300 $55.000 $10.000
INSTALL HWY TRF SIG (UPGRADE)
EA 1.000 $8,555.930 $11,500.000 $13,354.580 $10,000.000 $8,350.000 $9,000.000 $8,350.000
TRF SIG CBL (TY A)(10 AWG)(2 CONDR)
LF 1,050.000 $3.500 $4.050 $4.670 $3.500 $10.600 $11.500 $10.550
PEDESTRIAN PUSH BUTTON POLE
EA 6.000 $2,000.000 $5,175.000 $6,009.560 $4,500.000 $4,500.000 $4,825.000 $4,500.000
PED DETECT PUSH BUTTON (APS)
EA 8.000 $1,013.850 $1,380.000 $1,602.550 $1,200.000 $1,430.000 $1,525.000 $1,425.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $3,844.340 $1,840.000 $2,136.730 $1,600.000 $4,750.000 $5,100.000 $4,750.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 981.000 $19.000 $38.200 $28.020 $30.000 $25.000 $27.000 $25.000
POST AND CABLE FENCE (NEW CONC ANCHOR)
EA 8.000 $600.000 $254.700 $616.450 $550.000 $550.000 $590.000 $550.000
TIED-CONCRETE BLOCK EROSION CONTROL MAT
SF 5,990.000 $8.000 $12.000 $10.500 $10.000 $9.900 $6.300 $30.000
UNDERSEAL COURSE
GAL 15,302.000 $6.500 $8.350 $5.580 $8.000 $7.800 $5.000 $7.300
PREFAB CANTILEVER PED SYSTEM
SF 8,643.000 $162.000 $200.000 $192.000 $220.000 $207.000 $212.000 $250.000
FIXED BOLLARDS
EA 8.000 $1,200.000 $1,213.600 $800.000 $1,000.000 $1,100.000 $1,100.000 $2,700.000
GROUND BOX (PREPARE)
EA 4.000 $540.490 $747.500 $868.050 $650.000 $1,200.000 $1,300.000 $1,200.000
Totals: $7,802,744.750 $7,487,324.298 $7,598,853.110 $7,872,239.250 $8,330,254.230 $8,892,413.200 $11,756,266.520
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,500.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $7,500.00
Total: $10,000.00