Show Job Controls
Bid Cobra

POTTER VA (0904-02-047)

Items: 36

County: POTTER
Length: N/A
Highway: VA
District: AMARILLO
Control Number: 0904-02-047
DBE Goal: N/A
Project: F 2022(626)
Guaranty: N/A
Time: 194 WORKING DAYS
Engineer's Estimate: $2,109,273.50
Date: 06/02/2022 (4 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$2,109,273.50
$1,974,345.80
Over/Under Est: -6.4% -$134,927.70
$2,024,671.00
Over/Under Est: -4.01% -$84,602.50
Amt Left: 2.55% $50,325.20
$2,058,947.00
Over/Under Est: -2.39% -$50,326.50
Amt Left: 4.29% $84,601.20
Delta: -1.69% -$34,276.00
Over/Under Est: 27.95% $589,497.50
Amt Left: 36.69% $724,425.20
Delta: -31.08% -$639,824.00
$2,962,935.00
Over/Under Est: 40.47% $853,661.50
Amt Left: 50.07% $988,589.20
Delta: -9.79% -$264,164.00

Bid Items & Bid Tabulations

36 Total 0 of 36
POTTER  |  VA  |  AMARILLO  |  0904-02-047  |  06/02/2022  |  $2,109,273.50  |  F 2022(626)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  194 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TI-ZACK CONCRETE, INC.
MIJELUM, L.L.C.
ENCINO LANDSCAPE, INC.
O. TREVINO CONSTRUCTION, LLC
GILVIN-TERRILL, LTD.
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 4.000 $150.000 $500.000 $300.000 $150.000 $1,000.000 $1,000.000
REMOVING CONC (FOUNDATIONS)
SY 2.800 $100.000 $140.000 $800.000 $500.000 $500.000 $2,500.000
REMOVING CONC (SIDEWALKS)
SY 3,071.000 $30.000 $15.000 $10.000 $25.000 $25.000 $60.000
REMOVING CONC (DRIVEWAYS)
SY 4,199.000 $30.000 $20.000 $20.000 $25.000 $30.000 $60.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 1,398.000 $15.000 $6.000 $10.000 $25.000 $25.000 $100.000
REMOVING STAB BASE & ASPH PAV (6" - 8")
SY 4,698.000 $10.000 $16.000 $5.000 $25.000 $25.000 $60.000
FURNISHING AND PLACING TOPSOIL (4")
SY 608.000 $6.000 $6.500 $2.000 $1.000 $18.000 $25.000
BLOCK SODDING
SY 608.000 $6.000 $10.000 $10.000 $4.000 $8.500 $35.000
VEGETATIVE WATERING
MG 23.800 $100.000 $1.000 $50.000 $5.000 $135.000 $50.000
RIPRAP (CONC)(4 IN)
CY 63.100 $725.000 $650.000 $550.000 $500.000 $830.000 $1,000.000
ADJUSTING MANHOLES
EA 4.000 $1,450.000 $400.000 $700.000 $1,500.000 $600.000 $1,000.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 4.000 $550.000 $400.000 $1,000.000 $500.000 $200.000 $1,000.000
ADJUSTING MANHOLES (WATER METER)
EA 7.000 $500.000 $225.000 $1,200.000 $500.000 $600.000 $1,000.000
REMOVE STR (BOLLARD)
EA 3.000 $250.000 $266.000 $500.000 $100.000 $400.000 $1,000.000
MOBILIZATION
LS 1.000 $170,000.000 $161,000.000 $200,000.000 $160,000.000 $265,000.000 $295,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $11,500.000 $1,000.000 $10,000.000 $7,000.000 $14,000.000 $11,200.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,500.000 $5.800 $0.010 $20.000 $5.000 $7.000 $10.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,500.000 $1.700 $0.010 $5.500 $1.000 $1.000 $5.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,000.000 $5.500 $0.010 $20.000 $10.000 $7.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,000.000 $2.000 $0.010 $0.500 $1.000 $1.000 $5.000
CONC CURB & GUTTER (TY II)
LF 3,042.000 $30.000 $42.000 $35.000 $30.000 $70.000 $60.000
DRIVEWAYS (CONC)
SY 6,318.000 $100.000 $105.000 $80.000 $90.000 $125.000 $100.000
CONC SIDEWALKS (4")
SY 6,282.000 $65.000 $92.000 $60.000 $80.000 $79.000 $70.000
CURB RAMPS (TY 1)
EA 22.000 $2,250.000 $1,800.000 $2,500.000 $1,600.000 $2,550.000 $1,500.000
CURB RAMPS (TY 2)
EA 7.000 $3,900.000 $1,800.000 $2,500.000 $1,600.000 $2,700.000 $1,800.000
CURB RAMPS (TY 3)
EA 2.000 $2,200.000 $1,800.000 $2,500.000 $1,600.000 $3,200.000 $1,500.000
CURB RAMPS (TY 5)
EA 2.000 $6,300.000 $1,800.000 $4,300.000 $2,200.000 $3,300.000 $1,800.000
CURB RAMPS (TY 7)
EA 5.000 $3,400.000 $1,800.000 $2,500.000 $2,200.000 $2,500.000 $1,500.000
CURB RAMPS (TY 10)
EA 30.000 $2,200.000 $1,800.000 $2,500.000 $2,200.000 $2,600.000 $1,500.000
CONC SIDEWALKS (SPECIAL) (TYPE B)
SY 139.000 $190.000 $235.000 $200.000 $250.000 $300.000 $135.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 14.000 $780.000 $165.000 $2,000.000 $500.000 $700.000 $1,500.000
REMOVE SM RD SN SUP&AM
EA 3.000 $130.000 $55.000 $4,000.000 $500.000 $200.000 $600.000
MOVE AND RESET PRECAST CONC WHEEL STOPS
EA 28.000 $50.000 $100.000 $1,000.000 $200.000 $45.000 $120.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $1.000 $20,000.000 $9,999.000 $15,000.000 $15,500.000
GROUND BOX (ADJUST)
EA 5.000 $700.000 $1.000 $2,000.000 $500.000 $4,200.000 $400.000
TMA (STATIONARY)
DAY 194.000 $315.000 $1.000 $550.000 $250.000 $150.000 $350.000
Totals: $2,109,273.500 $1,974,345.800 $2,024,671.000 $2,058,947.000 $2,698,771.000 $2,962,935.000