Show Job Controls
Bid Cobra

POTTER VARIOUS (0904-00-230)

Items: 93

County: POTTER
Length: 0.0000 MILES
Highway: VARIOUS
District: AMARILLO
Control Number: 0904-00-230
DBE Goal: 200.0%
Project: STP 2B25(042)TP
Guaranty: $91,000.00
Time: 125 WORKING DAYS
Engineer's Estimate: $4,563,860.25
Date: 09/04/2025 (9 months ago)
Contract Number: 9253017
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00198123
Contract Type: Federal
Project Description: IH 40 PEDESTRIAN IMPROVEMENTS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JOE CHAPPELL
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$4,563,860.25
Over/Under Est: -12.02% -$548,669.15
Over/Under Est: -1.72% -$78,507.75
Amt Left: 11.71% $470,161.40
$4,495,041.67
Over/Under Est: -1.51% -$68,818.58
Amt Left: 11.95% $479,850.57
Delta: -0.22% -$9,689.17
$4,676,737.81
Over/Under Est: 2.47% $112,877.56
Amt Left: 16.48% $661,546.71
Delta: -4.04% -$181,696.14
Over/Under Est: 16.52% $754,063.75
Amt Left: 32.45% $1,302,732.90
Delta: -13.71% -$641,186.19
Subcontractor Percentage Amount
VACA UNDERGROUND UTILITIES INC 1.74% $69,864.33
TRP CONSTRUCTION GROUP, LLC 1.20% $48,182.29
GP7 CONSTRUCTION INC. 0.76% $30,515.45
C & C ENVIRONMENTAL SERVICES 0.57% $22,886.59
BARRICADES UNLIMITED 0.32% $12,848.61
CI CONSTRUCTION & LANDSCAPE, LLC 0.19% $7,628.86
Total: 4.78% $191,926.13

Bid Items & Bid Tabulations

93 Total 0 of 93
POTTER  |  VARIOUS  |  AMARILLO  |  0904-00-230  |  09/04/2025  |  $4,563,860.25  |  STP 2B25(042)TP  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  125 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
L A FULLER & SONS CONSTRUCTION, LTD.
TEXAS STEEL INDUSTRIAL PLACING, LLC
TI-ZACK CONCRETE, LLC
GILVIN-TERRILL, LTD.
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
PREPARING ROW
STA 2.500 $2,000.000 $0.010 $4,500.000 $6,840.000 $2,000.000 $2,500.000
REMOV CONC (MOWSTRIP)
SY 150.000 $25.000 $17.350 $40.000 $26.600 $25.000 $50.000
REMOV CONC (RIPRAP)
SY 44.000 $35.000 $63.000 $30.000 $36.270 $25.000 $25.000
REMOV CONC (DRIVEWAYS)
SY 1,913.000 $44.000 $15.250 $50.000 $25.030 $25.000 $5.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 256.000 $25.000 $19.000 $25.000 $31.170 $25.000 $10.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 1,801.000 $12.000 $13.450 $10.000 $13.290 $10.000 $10.000
EXCAV (SPECIAL)
CY 308.000 $30.000 $33.000 $40.000 $77.730 $35.000 $150.000
EMBANK (FNL)(DC)(TY B)
CY 2,532.000 $55.000 $41.450 $30.000 $49.020 $35.000 $65.000
FURN & PLACE TOPSOIL (4")
SY 6,648.000 $7.000 $5.450 $6.000 $4.800 $15.000 $10.000
BLOCK SODDING
SY 6,648.000 $10.000 $9.350 $7.000 $6.840 $20.000 $7.000
VEGETATIVE WATERING
TGL 114.800 $60.000 $240.000 $50.000 $1.140 $46.000 $300.000
RDSIDE AMENITY (WHEEL STOP REMOV&RESET)
EA 5.000 $300.000 $662.200 $250.000 $114.000 $150.000 $500.000
SP MIXES SP-D PG70-28
TON 40.000 $600.000 $753.450 $750.000 $399.000 $350.000 $500.000
TACK COAT
GAL 32.000 $10.000 $37.950 $20.000 $11.400 $25.000 $50.000
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 500.000 $10.000 $17.950 $20.000 $13.680 $20.000 $75.000
CUT & RESTORE ASPH PAVING
SY 464.000 $190.000 $242.650 $250.000 $100.290 $200.000 $350.000
FLOWABLE BACKFILL
CY 6.000 $530.000 $639.600 $400.000 $456.000 $500.000 $500.000
TRENCH EXCAVATION PROTECTION
LF 225.000 $25.000 $25.650 $30.000 $1.140 $35.000 $75.000
CL A CONC (MISC)
CY 20.000 $1,000.000 $955.550 $1,250.000 $753.010 $875.000 $850.000
CL A CONC (FLUME)
CY 3.000 $1,000.000 $9,104.050 $800.000 $753.010 $875.000 $850.000
RIPRAP (CONC)(4 IN)
CY 18.000 $825.000 $796.700 $750.000 $753.010 $825.000 $1,000.000
RAIL (TY PR11)
LF 421.000 $175.000 $160.950 $175.000 $296.400 $150.000 $175.000
CONC BOX CULV (6 FT X 3 FT)
LF 2,078.000 $620.000 $463.150 $700.000 $741.000 $567.000 $750.000
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
LF 41.000 $1,500.000 $1,911.000 $1,250.000 $1,254.000 $900.000 $750.000
RC PIPE (CL III)(24 IN)
LF 24.000 $200.000 $206.250 $165.000 $136.800 $175.000 $100.000
RC PIPE (CL III)(30 IN)
LF 15.000 $250.000 $303.450 $200.000 $228.000 $200.000 $125.000
RC PIPE (CL III)(36 IN)
LF 118.000 $300.000 $297.200 $250.000 $330.600 $250.000 $175.000
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 6.000 $8,000.000 $12,366.950 $10,000.000 $13,908.000 $10,000.000 $7,500.000
INLET (COMPL)(PSL)(RC)(4FTX4FT)
EA 3.000 $10,000.000 $17,945.550 $10,000.000 $7,182.000 $10,000.000 $7,500.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 3.000 $9,800.000 $10,472.000 $15,000.000 $8,208.000 $30,000.000 $15,000.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 2.000 $12,500.000 $11,000.000 $15,000.000 $11,400.000 $30,000.000 $15,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 2.000 $29,000.000 $18,000.000 $25,000.000 $39,900.000 $32,750.000 $15,000.000
REMOV STR (SET)
EA 6.000 $1,200.000 $915.800 $1,000.000 $285.000 $2,000.000 $500.000
REMOV STR (HEADWALL)
EA 7.000 $2,000.000 $1,632.600 $2,000.000 $1,140.000 $3,000.000 $750.000
REMOV STR (PIPE)
LF 254.000 $60.000 $54.500 $25.000 $14.820 $30.000 $20.000
REMOV STR (BOX CULVERT)
LF 12.000 $150.000 $594.350 $500.000 $114.000 $50.000 $500.000
MOBILIZATION
LS 1.000 $375,000.000 $375,067.900 $450,000.000 $348,359.680 $465,000.000 $450,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $8,000.000 $3,386.050 $5,000.000 $3,990.000 $21,875.000 $2,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,000.000 $14,000.000 $30,000.000 $5,700.000 $18,500.000 $3,500.000
TMA (STATIONARY)
DAY 120.000 $300.000 $500.000 $100.000 $0.110 $460.000 $325.000
TMA (MOBILE OPERATION)
HR 16.000 $100.000 $97.700 $100.000 $0.110 $95.000 $325.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 251.000 $70.000 $65.150 $60.000 $0.110 $40.000 $75.000
ROCK FILTER DAMS (REMOVE)
LF 251.000 $20.000 $20.650 $20.000 $0.110 $20.000 $25.000
SANDBAGS FOR EROSION CONTROL
EA 600.000 $7.000 $15.500 $3.000 $0.110 $20.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,739.000 $8.000 $8.000 $5.000 $0.110 $3.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,739.000 $1.000 $1.550 $2.000 $0.110 $1.000 $3.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 429.000 $5.000 $19.650 $8.000 $0.110 $8.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 429.000 $2.000 $1.550 $1.500 $0.110 $2.000 $3.000
COLORED TEXTURED CONC (5")
SY 720.000 $130.000 $123.250 $120.000 $108.500 $100.000 $750.000
CONC CURB (TY I)
LF 880.000 $35.000 $39.700 $40.000 $49.500 $35.000 $35.000
CONC CURB (TY II)
LF 803.000 $35.000 $35.250 $40.000 $49.500 $35.000 $40.000
CONC CURB & GUTTER (TY II)
LF 1,834.000 $55.000 $37.950 $50.000 $49.500 $40.000 $100.000
CONC CURB (TY F3)
LF 162.000 $200.000 $209.100 $50.000 $280.260 $410.000 $35.000
DRIVEWAYS (CONC) (TY 1)
SY 1,414.000 $175.000 $236.050 $110.000 $108.190 $150.000 $150.000
DRIVEWAYS (CONC) (TY 2)
SY 353.000 $175.000 $255.100 $110.000 $148.180 $150.000 $150.000
CONC SIDEWALKS (5")
SY 8,372.000 $112.000 $66.200 $95.000 $108.500 $105.000 $100.000
CURB RAMPS (TY 1)
SY 325.000 $175.000 $231.950 $170.000 $115.390 $165.000 $150.000
CURB RAMPS (TY 2)
SY 37.000 $175.000 $239.050 $170.000 $115.390 $230.000 $150.000
CURB RAMPS (TY 7)
SY 50.000 $175.000 $325.550 $170.000 $115.390 $165.000 $150.000
CURB RAMPS (TY 10)
SY 247.000 $175.000 $133.100 $170.000 $115.390 $165.000 $150.000
REMOVE METAL BEAM GUARD FENCE
LF 279.000 $8.000 $28.750 $10.000 $19.380 $15.600 $10.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $1,788.250 $350.000 $1,368.000 $1,000.000 $500.000
RELOCATE EXISTING MAILBOX
EA 2.000 $250.000 $638.250 $400.000 $627.000 $1,500.000 $250.000
CONDT (PVC) (SCH 40) (2")
LF 110.000 $20.000 $23.000 $20.000 $34.200 $20.000 $30.000
ELEC CONDR (NO.8) BARE
LF 110.000 $5.000 $2.580 $4.000 $11.400 $2.250 $4.000
GROUND BOX TY D (162922)
EA 8.000 $2,200.000 $2,300.000 $2,000.000 $3,249.000 $2,000.000 $3,000.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 18.000 $500.000 $747.500 $600.000 $627.000 $711.910 $750.000
RELOCATE SM RD SN SUP&AM TY S80
EA 3.000 $900.000 $747.500 $600.000 $627.000 $711.910 $1,000.000
RE PM TY I (ACC PRK)(WHT)(SYMBOL ONLY)
EA 2.000 $450.000 $632.500 $550.000 $627.000 $550.000 $1,000.000
PAVEMENT SLER 4"
LF 175.000 $1.000 $6.320 $5.500 $6.270 $5.500 $8.000
PAVEMENT SLER 6"
LF 126.000 $1.000 $6.320 $5.500 $6.270 $5.500 $8.000
PAVEMENT SLER 24"
LF 682.000 $3.000 $11.500 $10.000 $11.400 $10.000 $15.000
PAVEMENT SLER (SYMBOL)
EA 2.000 $50.000 $172.500 $150.000 $171.000 $150.000 $200.000
REFL PAV MRK TY I (Y)4"(SLD)(100MIL)
LF 175.000 $2.000 $8.620 $7.500 $8.550 $7.500 $10.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 126.000 $2.000 $11.500 $10.000 $11.400 $10.000 $15.000
PREFAB PM TY B (W)(24")(SLD)
LF 682.000 $20.000 $46.000 $40.000 $45.600 $40.000 $55.000
ELIM EXT PM & MRKS (4")
LF 272.000 $2.000 $3.450 $3.000 $3.420 $3.000 $5.000
ELIM EXT PM & MRKS (12")
LF 241.000 $2.000 $4.600 $4.000 $4.560 $4.000 $6.000
ELIM EXT PM & MRKS (24")
LF 76.000 $7.000 $6.900 $6.000 $6.840 $6.000 $8.000
ELIM EXT PM & MRKS (SYMBOL)
EA 2.000 $100.000 $172.500 $150.000 $171.000 $150.000 $250.000
ELIM EXT PM & MRKS (MED NOSE)
EA 1.000 $220.000 $460.000 $400.000 $456.000 $400.000 $600.000
PAV SURF PREP FOR MRK (4")
LF 175.000 $0.750 $3.450 $3.000 $3.420 $3.000 $5.000
PAV SURF PREP FOR MRK (6")
LF 126.000 $0.500 $4.600 $4.000 $4.560 $4.000 $6.000
PAV SURF PREP FOR MRK (24")
LF 682.000 $3.000 $6.900 $6.000 $6.840 $6.000 $8.000
PAV SURF PREP FOR MRK (SYMBOL)
EA 2.000 $50.000 $172.500 $150.000 $171.000 $150.000 $250.000
INSTALL HWY TRF SIG (UPGRADE)
EA 1.000 $20,000.000 $23,000.000 $25,000.000 $17,413.500 $20,000.000 $35,000.000
PED SIG SEC (LED)(COUNTDOWN)
EA 3.000 $1,000.000 $920.000 $900.000 $1,710.000 $800.000 $1,000.000
TRF SIG CBL (TY A)(14 AWG)(2 CONDR)
LF 2,000.000 $3.000 $2.300 $3.000 $5.700 $2.000 $3.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 1,500.000 $3.000 $2.870 $3.000 $7.980 $2.500 $3.000
PED POLE ASSEMBLY
EA 1.000 $8,500.000 $3,450.000 $4,000.000 $8,578.500 $3,000.000 $10,000.000
PED DETECT PUSH BUTTON (APS)
EA 4.000 $1,200.000 $920.000 $1,000.000 $1,881.000 $800.000 $1,000.000
REMOVAL OF SIGNAL HEAD ASSM
EA 1.000 $500.000 $172.500 $300.000 $570.000 $150.000 $200.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 2.000 $500.000 $57.500 $100.000 $285.000 $50.000 $100.000
Totals: $4,563,860.250 $4,015,191.095 $4,485,352.500 $4,495,041.672 $4,676,737.810 $5,317,924.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $3,000.00
Total: $4,000.00