POTTER US 60 (0169-02-068)

Items: 56

County: POTTER
Length: N/A
Highway: US 60
District: AMARILLO
Control Number: 0169-02-068
DBE Goal: N/A
Project: STP 2023(181)HES
Guaranty: N/A
Time: 106 WORKING DAYS
Engineer's Estimate: $2,221,786.19
Date: 11/03/2022 (3 years ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT T
Mail/Deliver Bids To: N/A
JOE CHAPPELL
CC SYSOMBATH
KENNETH PETR
THOMAS NAGEL
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,221,786.19
Over/Under Est: -0.63% -$14,031.19
$2,299,026.24
Over/Under Est: 3.48% $77,240.05
Amt Left: 4.13% $91,271.24
$2,592,831.10
Over/Under Est: 16.7% $371,044.91
Amt Left: 17.44% $385,076.10
Delta: -12.78% -$293,804.86

Bid Items & Bid Tabulations

56 Total 0 of 56
POTTER  |  US 60  |  AMARILLO  |  0169-02-068  |  11/03/2022  |  $2,221,786.19  |  STP 2023(181)HES  |  INTERS IMPRVS WITH RIGHT AND/OR LEFT...  |  106 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
L A FULLER & SONS CONSTRUCTION, LTD.
J. LEE MILLIGAN, INC.
GILVIN-TERRILL, LTD.
PREP ROW (TREE)(24"-30"DIA)
EA 1.000 $3,600.000 $1,160.000 $4,100.000 $1,200.000
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 2.000 $500.000 $345.000 $235.000 $1,200.000
REMOVING CONC (MEDIANS)
SY 370.000 $40.000 $9.500 $22.000 $20.000
REMOVING STAB BASE & ASPH PAV (5" - 6")
SY 985.000 $10.000 $24.900 $54.000 $40.000
REMOVE STAB BASE & ASPH PAV (17.5")
SY 6,061.000 $20.000 $15.200 $10.000 $22.000
SUBGRADE WIDENING (DENS CONT)
STA 92.000 $1,800.000 $1,260.000 $1,350.000 $1,000.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 8.000 $675.000 $915.000 $685.000 $650.000
DRILL SEEDING (TEMP)(WARM OR COOL)
AC 8.000 $550.000 $703.000 $530.000 $500.000
FL BS(CMP IN PLC)(TY A,B OR D GR4)(12")
SY 12,784.000 $32.000 $30.700 $29.000 $45.000
LIME TRT (SUBGRADE)(8")
SY 12,784.000 $7.000 $10.100 $8.750 $10.000
LIME (HYD(SLY OR DRY) COM OR QK(DRY)
TON 137.000 $250.000 $400.000 $339.000 $400.000
PRIME COAT (MC-30)
GAL 3,373.000 $6.000 $8.500 $7.300 $8.000
EMULS ASPH (EROSN CONT)(MULTI)
GAL 3,872.000 $6.000 $8.300 $5.400 $3.000
ASPH (MULTI OPTION)
GAL 5,125.000 $6.000 $6.100 $6.450 $4.000
AGGR(TY-B GR-4 SAC-A)
CY 121.000 $220.000 $685.000 $320.000 $200.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 24.000 $350.000 $221.000 $548.000 $519.000
RIPRAP (CONC)(4 IN)
CY 1.000 $800.000 $1,780.000 $915.000 $1,200.000
RC PIPE (CL III)(24 IN)
LF 14.000 $200.000 $268.000 $140.000 $180.000
RC PIPE (CL III)(30 IN)
LF 14.000 $250.000 $291.000 $168.000 $220.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $4,100.000 $4,715.000 $4,400.000 $2,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $4,100.000 $4,715.000 $4,400.000 $2,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 2.000 $4,100.000 $5,860.000 $5,340.000 $5,000.000
REMOV STR (SET)
EA 4.000 $800.000 $270.000 $1,420.000 $500.000
REMOV STR (HEADWALL)
EA 2.000 $1,500.000 $320.000 $2,840.000 $750.000
REMOV STR (PIPE)
LF 70.000 $30.000 $45.000 $40.000 $20.000
MOBILIZATION
LS 1.000 $185,000.000 $152,930.700 $229,000.000 $218,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $15,000.000 $2,400.000 $24,500.000 $35,000.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 950.000 $5.500 $3.500 $8.750 $3.240
BIODEG EROSN CONT LOGS (REMOVE)
LF 950.000 $1.900 $1.400 $4.300 $1.000
CONC MEDIAN
SY 240.000 $150.000 $147.500 $132.000 $200.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 3.000 $1,700.000 $5,010.000 $2,500.000 $2,310.000
CONDT (PVC) (SCH 40) (2")
LF 420.000 $18.000 $14.800 $20.000 $18.820
ELEC CONDR (NO.8) BARE
LF 440.000 $1.500 $2.800 $2.000 $1.840
ELEC CONDR (NO.8) INSULATED
LF 880.000 $2.000 $2.100 $3.000 $2.530
GROUND BOX TY A (122311)W/APRON
EA 1.000 $1,000.000 $3,520.000 $2,850.000 $2,678.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 11.000 $930.000 $1,420.000 $1,050.000 $1,010.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 7.000 $1,200.000 $2,205.000 $1,540.000 $1,567.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 114.000 $130.000 $166.000 $225.000 $118.000
INSTL DEL ASSM (D-SY)SZ 1(YFLX)SRF(BI)
EA 9.000 $150.000 $166.000 $180.000 $118.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 10,800.000 $1.000 $1.400 $1.060 $1.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 8,423.000 $0.950 $1.800 $1.370 $1.300
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 52.000 $20.000 $21.000 $15.850 $15.000
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 22.000 $150.000 $246.000 $184.750 $175.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 22.000 $210.000 $317.000 $237.500 $225.000
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 6.000 $47.000 $77.000 $58.000 $55.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 2,436.000 $0.520 $1.000 $0.790 $0.750
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 10,793.000 $0.340 $0.900 $0.630 $0.600
REFL PAV MRKR TY I-A
EA 20.000 $10.500 $14.000 $10.550 $10.000
REFL PAV MRKR TY II-C-R
EA 840.000 $4.000 $8.500 $6.350 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 10,800.000 $0.850 $2.100 $1.600 $1.500
SP MIXES SP-D SAC-A PG70-28
TON 3,867.000 $185.000 $177.000 $180.000 $190.000
TACK COAT
GAL 3,323.000 $5.000 $8.900 $5.850 $7.000
ADJ WTR VALVE COVER AND VALVE STACKS
EA 1.000 $5,000.000 $1,835.000 $785.000 $750.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $16,900.000 $7,000.000 $18,000.000
TMA (STATIONARY)
DAY 90.000 $350.000 $352.000 $500.000 $310.000
TMA (MOBILE OPERATION)
HR 40.000 $120.000 $134.000 $90.000 $95.000
Totals: $2,221,786.190 $2,207,755.000 $2,299,026.240 $2,592,831.100