Show Job Controls
Bid Cobra

POTTER IH 40 (0090-05-111)

Items: 31

County: POTTER
Length: N/A
Highway: IH 40
District: AMARILLO
Control Number: 0090-05-111
DBE Goal: N/A
Project: STP 2023(598)HES
Guaranty: N/A
Time: 107 WORKING DAYS
Engineer's Estimate: $4,058,835.35
Date: 06/01/2023 (3 years ago)
Contract Number: N/A
Type: INSTALL ILLUMINATION
Mail/Deliver Bids To: N/A
BRANDON BILBREY
KEVIN WILCOX
KENNETH PETR
LADENIA JEWITT
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$4,058,835.35
$4,121,379.40
Over/Under Est: 1.54% $62,544.05
$4,265,604.75
Over/Under Est: 5.09% $206,769.40
Amt Left: 3.5% $144,225.35
$5,147,497.50
Over/Under Est: 26.82% $1,088,662.15
Amt Left: 24.9% $1,026,118.10
Delta: -20.67% -$881,892.75

Bid Items & Bid Tabulations

31 Total 0 of 31
POTTER  |  IH 40  |  AMARILLO  |  0090-05-111  |  06/01/2023  |  $4,058,835.35  |  STP 2023(598)HES  |  INSTL ILLUM  |  107 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MICA CORPORATION
3LW CIVIL LLC
GILVIN-TERRILL, LTD.
DRILL SHAFT (HIGH MAST POLE) (54 IN)
LF 330.000 $810.000 $558.000 $550.000 $1,000.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 598.000 $900.000 $576.000 $600.000 $1,100.000
RIPRAP (CONC)(4 IN)
CY 69.000 $650.000 $1,045.000 $2,500.000 $1,200.000
RIPRAP (MOW STRIP)(4 IN)
CY 84.000 $650.000 $770.000 $2,500.000 $1,200.000
MOBILIZATION
LS 1.000 $340,000.000 $413,750.000 $150,000.000 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $12,000.000 $64,600.000 $40,000.000 $57,500.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,200.000 $37.000 $37.500 $50.000 $40.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 6.000 $1,419.820 $1,650.000 $3,000.000 $3,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,340.840 $3,770.000 $5,000.000 $3,500.000
REMOVE RD IL ASM (TRANS-BASE)
EA 13.000 $1,000.000 $1,325.000 $1,500.000 $850.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 2.000 $1,800.000 $2,535.000 $1,000.000 $1,800.000
HI MST IL POLE (100 FT)(100 MPH)
EA 10.000 $48,000.000 $36,570.000 $40,000.000 $46,000.000
HI MST IL POLE (150 FT)(100 MPH)
EA 13.000 $51,000.000 $56,030.000 $60,000.000 $69,000.000
CONDT (PVC) (SCH 80) (2")
LF 14,460.000 $19.000 $16.500 $32.000 $20.500
CONDT (PVC) (SCH 80) (2") (BORE)
LF 3,710.000 $40.000 $29.700 $30.000 $33.000
CONDT (RM) (3/4")
LF 85.000 $30.000 $75.000 $25.000 $45.000
CONDT (RM) (2")
LF 30.000 $75.000 $140.000 $40.000 $130.000
ELEC CONDR (NO.12) BARE
LF 85.000 $1.010 $2.150 $1.600 $2.500
ELEC CONDR (NO.12) INSULATED
LF 170.000 $1.360 $2.150 $1.650 $10.000
ELEC CONDR (NO.8) BARE
LF 13,855.000 $1.440 $2.330 $2.000 $2.000
ELEC CONDR (NO.8) INSULATED
LF 27,710.000 $1.700 $2.510 $2.050 $2.500
ELEC CONDR (NO.6) BARE
LF 4,335.000 $2.100 $2.560 $2.150 $2.000
ELEC CONDR (NO.6) INSULATED
LF 8,670.000 $2.500 $2.790 $2.250 $3.500
GROUND BOX TY A (122311)W/APRON
EA 38.000 $1,450.000 $1,705.000 $1,100.000 $2,125.000
GROUND BOX TY C (162911)W/APRON
EA 10.000 $1,500.000 $2,310.000 $1,200.000 $2,250.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 4.000 $6,900.000 $13,510.000 $10,000.000 $10,500.000
ELC SRV TY A 240/480 100(NS)SS(E)SP(O)
EA 1.000 $10,363.640 $14,510.000 $13,200.000 $12,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 20.000 $33.200 $22.000 $60.000 $120.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $17,800.000 $12,000.000 $18,500.000
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
EA 23.000 $36,000.000 $32,150.000 $35,000.000 $37,100.000
TMA (STATIONARY)
DAY 100.000 $225.000 $318.000 $150.000 $550.000
Totals: $4,058,835.350 $4,121,379.400 $4,265,604.750 $5,147,497.500