Show Job Controls
Bid Cobra

POTTER BI 40D (0090-05-109)

Items: 159

County: POTTER
Length: 8.7940 MILES
Highway: BI 40D
District: AMARILLO
Control Number: 0090-05-109
DBE Goal: 7.0%
Project: STP 2025(139)HES
Guaranty: $100,000.00
Time: 322 WORKING DAYS
Engineer's Estimate: $29,748,351.20
Date: 10/02/2024 (1 year ago)
Contract Number: 10243203
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00184366
Project Description: INSTALL LEFT TURN LANES AND SAFETY TREAT FIXED OBJECTS
Mail/Deliver Bids To: N/A
WESLEY KIMMELL
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$29,748,351.20
$30,982,053.94
Over/Under Est: 4.15% $1,233,702.74
$32,618,939.09
Over/Under Est: 9.65% $2,870,587.89
Amt Left: 5.28% $1,636,885.15
$34,218,919.75
Over/Under Est: 15.03% $4,470,568.55
Amt Left: 10.45% $3,236,865.81
Delta: -4.91% -$1,599,980.66
Subcontractor Percentage Amount
ALAMO BROTHERS CONCRETE INC 14.59% $4,549,115.79
W. S. CONSTRUCTION COMPANY 6.70% $2,089,038.78
VACA UNDERGROUND UTILITIES INC 4.34% $1,353,198.25
SCR CIVIL CONSTRUCTION, LLC 2.18% $679,717.10
GARZA CONCRETE CONSTRUCTION 1.98% $617,357.73
TRP CONSTRUCTION GROUP, LLC 1.16% $361,684.33
TNT INDUSTRIAL CONTRACTING 0.56% $174,606.23
LMSE TRUCKING, LLC 0.45% $140,308.57
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.24% $74,831.24
MARCOMS CONSTRUCTION LLC 0.21% $65,477.33
DUSTIN ALLEN, INC. 0.15% $46,769.52
FC TRAFFIC CONTROL, INC. 0.10% $31,179.68
Total: 32.66% $10,183,284.55

Bid Items & Bid Tabulations

159 Total 0 of 159
POTTER  |  BI 40D  |  AMARILLO  |  0090-05-109  |  10/02/2024  |  $29,748,351.20  |  STP 2025(139)HES  |  HAZARD ELIM & SAFETY  |  322 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GILVIN-TERRILL, LTD.
J. LEE MILLIGAN, INC.
RK HALL, LLC
REMOV CONC (DRIVEWAYS)
SY 1,472.000 $50.000 $35.000 $65.000 $60.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 1,130.000 $35.000 $35.000 $40.000 $55.000
REMOV CONC (CURB & GUTTER)
LF 2,168.000 $15.000 $15.000 $15.000 $30.000
RMV (19") TRT/UNTRT BASE & ASPH PAV
SY 13,353.000 $36.000 $25.000 $40.000 $25.000
EXCAV (ROADWAY)
CY 16,515.000 $45.000 $50.000 $55.000 $45.000
EMBANK (FNL)(DC)(TY B)
CY 8,886.000 $50.000 $50.000 $55.000 $45.000
BACKFILL (TY A)
STA 251.000 $300.000 $500.000 $450.000 $400.000
BLADING
HR 166.000 $300.000 $200.000 $650.000 $400.000
DRILL SEED (TEMP_WARM_COOL)
SY 153,727.000 $0.400 $0.150 $0.100 $0.140
HYDRO MULCH SEED (PERM_URBAN_CLAY)
SY 153,727.000 $1.000 $0.500 $0.450 $0.580
VEGETATIVE WATERING
TGL 2,572.000 $55.000 $45.000 $35.000 $50.000
FL BS (CMP IN PLC)(TY A GR 4) (12")
SY 26,261.000 $50.000 $50.000 $65.000 $50.000
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 307.000 $400.000 $450.000 $450.000 $625.360
LIME TRT (EXIST MATL & NEW BASE)(8")
SY 26,261.000 $10.000 $40.000 $20.000 $15.000
PRIME COAT (MC-30)
GAL 8,225.000 $7.000 $6.000 $8.100 $7.000
AGGR (TY-B, GR-4)(SAC-B)
CY 299.000 $200.000 $249.960 $350.000 $500.000
ASPH (MULTI OPTION)
GAL 12,501.000 $6.000 $6.000 $6.000 $6.000
D-GR HMA TY-B SAC-B PG64-22
TON 4,826.000 $160.000 $175.000 $213.250 $190.000
SP MIXES SP-D SAC-A PG70-28
TON 36,273.000 $180.000 $180.000 $190.000 $200.000
TACK COAT
GAL 68,576.000 $6.000 $6.000 $7.350 $8.420
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 23,656.000 $36.000 $45.000 $50.000 $40.000
PLANE ASPH CONC PAV(5")
SY 14,072.000 $8.000 $10.000 $19.000 $11.000
CONC PVMT (CRCP) (10")
SY 2,641.000 $300.000 $155.000 $260.000 $200.000
CUT & RESTORING PAV
SY 274.000 $300.000 $375.000 $635.000 $250.000
FLOWABLE BACKFILL
CY 266.000 $275.000 $250.000 $300.000 $390.000
TEMPORARY SPL SHORING
SF 695.000 $60.000 $115.000 $80.000 $120.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 56.000 $215.000 $250.000 $335.040 $360.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 552.000 $360.000 $275.000 $385.000 $414.000
CL A CONC (FLUME)
CY 10.000 $800.000 $930.000 $1,040.000 $1,200.000
CL C CONC (RAIL FOUNDATION)
CY 168.000 $900.000 $800.000 $855.000 $1,000.000
CL C CONC (MISC)
CY 2.000 $5,000.000 $2,100.000 $1,000.000 $1,100.000
RETAINING WALL (SPREAD FOOTING)
SF 6,831.000 $115.000 $150.000 $200.000 $350.000
RIPRAP (CONC)(4 IN)
CY 79.000 $800.000 $650.000 $655.000 $960.000
RIPRAP (MOW STRIP)(4 IN)
CY 751.000 $800.000 $600.000 $585.000 $960.000
RAIL (TY SSTR)
LF 925.000 $155.000 $100.000 $92.000 $150.000
RAIL (TY PR11)
LF 1,376.000 $150.000 $150.000 $135.000 $420.000
CONC BOX CULV (4 FT X 2 FT)
LF 729.000 $475.000 $750.000 $860.000 $750.000
RC PIPE (CL III)(18 IN)
LF 467.000 $150.000 $90.000 $100.000 $132.000
RC PIPE (CL III)(24 IN)
LF 2,206.000 $170.000 $125.000 $130.000 $198.000
RC PIPE (CL III)(30 IN)
LF 84.000 $250.000 $170.000 $170.000 $270.000
RC PIPE (CL III)(36 IN)
LF 56.000 $300.000 $240.000 $255.000 $378.000
RC PIPE (CL III)(48 IN)
LF 22.000 $400.000 $365.000 $375.000 $630.000
RC PIPE (CL IV)(24 IN)
LF 1,404.000 $210.000 $155.000 $160.000 $240.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 2.000 $8,000.000 $10,000.000 $8,600.000 $10,000.000
INLET (COMPL)(PCU)(5FT)(LEFT)
EA 1.000 $15,000.000 $13,500.000 $17,000.000 $15,000.000
INL(CMP)(PAZD-CZ)(FG)(4FTX4FT-4FTX4FT)
EA 2.000 $10,000.000 $500.000 $13,000.000 $15,000.000
INLET (COMP)(TY SIDEWALK BRIDGE)
EA 1.000 $6,000.000 $15,000.000 $17,000.000 $25,000.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 5.000 $9,500.000 $23,000.000 $27,000.000 $20,000.000
SET (TY I) (48 IN) (4: 1) (C)
EA 1.000 $10,000.000 $30,000.000 $31,000.000 $20,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1)(P)
EA 24.000 $13,000.000 $10,000.000 $12,500.000 $15,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 13.000 $2,100.000 $3,000.000 $2,800.000 $3,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 2.000 $2,300.000 $3,000.000 $2,800.000 $3,600.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 55.000 $2,300.000 $3,000.000 $2,900.000 $3,600.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $3,500.000 $4,000.000 $5,000.000 $9,000.000
SLOT DRAIN (GAL STL) (18 IN)
LF 280.000 $250.000 $350.000 $550.000 $600.000
REMOV STR (SET)
EA 67.000 $600.000 $1,200.000 $875.000 $500.000
REMOV STR (WINGWALL)
EA 1.000 $1,700.000 $1,200.000 $950.000 $2,500.000
REMOV STR (PIPE)
LF 1,308.000 $40.000 $25.000 $50.000 $25.000
MOBILIZATION
LS 1.000 $2,450,000.000 $3,100,000.000 $3,200,000.000 $3,200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $39,000.000 $90,000.000 $66,750.000 $50,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $16,000.000 $20,000.000 $31,000.000 $22,118.030
TMA (STATIONARY)
DAY 200.000 $350.000 $550.000 $655.000 $700.000
TMA (MOBILE OPERATION)
HR 80.000 $110.000 $95.000 $140.000 $150.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 30.000 $125.000 $65.000 $110.000 $100.000
ROCK FILTER DAMS (REMOVE)
LF 30.000 $35.000 $30.000 $40.000 $25.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,862.000 $10.000 $5.000 $8.000 $5.100
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,862.000 $3.000 $2.000 $4.500 $1.200
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,460.000 $7.000 $10.000 $12.500 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,460.000 $3.000 $4.000 $5.000 $1.200
COLORED TEXTURED CONC (4")
SY 4,490.000 $150.000 $80.000 $67.000 $80.000
CONC CURB & GUTTER (TY I)
LF 5,312.000 $50.000 $35.000 $44.500 $40.000
CONC CURB & GUTTER (TY II)
LF 6,551.000 $55.000 $40.000 $46.850 $40.000
INTERSECTIONS (ACP)
SY 818.000 $70.000 $145.000 $130.000 $100.000
DRIVEWAYS (CONC)
SY 1,421.000 $150.000 $135.000 $125.000 $125.000
DRIVEWAYS (ACP)
SY 1,185.000 $65.000 $145.000 $75.000 $100.000
DRIVEWAYS (BASE)
SY 931.000 $35.000 $90.000 $31.000 $75.000
CONC SIDEWALKS (4")
SY 1,407.000 $95.000 $80.000 $61.500 $70.000
CONC SIDEWALKS (5")
SY 34,571.000 $95.500 $90.000 $65.500 $80.000
CURB RAMPS (TY 5)
SY 16.000 $160.000 $200.000 $195.000 $300.000
CURB RAMPS (TY 7)
SY 833.000 $160.000 $200.000 $170.000 $300.000
CURB RAMPS (TY 10)
SY 59.000 $160.000 $200.000 $170.000 $300.000
CURB RAMPS (TY 22)
SY 51.000 $140.000 $200.000 $180.000 $300.000
CONC SIDEWALKS (SPECIAL)
SY 1,248.000 $140.000 $150.000 $115.000 $140.000
CONC DIRECTIONAL ISLAND
SY 3,580.000 $140.000 $125.000 $125.000 $135.000
MTL W-BEAM GD FEN (STEEL POST)
LF 650.000 $40.000 $33.000 $36.000 $38.400
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $3,100.000 $2,600.000 $3,325.000 $4,000.000
REMOVE METAL BEAM GUARD FENCE
LF 250.000 $5.000 $10.000 $2.250 $2.400
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $500.000 $600.000 $225.000 $240.000
CABLE BARRIER SYSTEM (INSTALL)(TL-4)
LF 12,026.000 $17.000 $16.000 $19.000 $20.400
CABLE BARRIER TERM SEC (INSTL)(TL-4)
EA 42.000 $6,000.000 $2,050.000 $5,000.000 $5,400.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,770.000 $3,750.000 $3,630.000 $3,900.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 4.000 $400.000 $250.000 $400.000 $420.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $790.000 $700.000 $840.000 $900.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 19.000 $3,100.000 $2,100.000 $4,200.000 $4,500.000
REPLACE LUMINAIRE W/(250W EQ) LED
EA 100.000 $900.000 $600.000 $855.000 $918.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 4.000 $1,500.000 $1,350.000 $3,500.000 $3,750.000
IN RD IL (TY SA) 40T-12 (250W EQ) LED
EA 11.000 $7,000.000 $6,500.000 $6,600.000 $7,050.000
IN RD IL (TY SA) 40T-12-12(250W EQ)LED
EA 39.000 $7,600.000 $7,500.000 $7,600.000 $8,142.000
CONDT (PVC) (SCH 40) (2")
LF 15,895.000 $20.000 $11.000 $22.000 $23.700
CONDT (PVC) (SCH 40) (2") (BORE)
LF 3,965.000 $32.000 $15.000 $37.400 $40.200
CONDT (PVC) (SCH 80) (2")
LF 485.000 $25.000 $13.000 $27.000 $28.800
CONDT (PVC) (SCH 80) (2") (BORE)
LF 535.000 $35.000 $20.000 $42.000 $45.000
CONDT (PVC) (SCH 80) (4")
LF 440.000 $55.000 $30.000 $45.000 $48.000
CONDT (RM) (3/4")
LF 195.000 $75.000 $25.000 $36.000 $39.000
CONDUIT (PREPARE)
LF 1,820.000 $4.500 $1.500 $3.650 $3.900
ELEC CONDR (NO.12) BARE
LF 235.000 $1.850 $1.750 $2.250 $2.400
ELEC CONDR (NO.12) INSULATED
LF 470.000 $1.900 $1.750 $2.500 $2.700
ELEC CONDR (NO.8) BARE
LF 13,900.000 $2.250 $2.300 $3.150 $3.360
ELEC CONDR (NO.8) INSULATED
LF 27,820.000 $2.500 $2.350 $3.350 $3.600
ELEC CONDR (NO.6) BARE
LF 7,735.000 $2.900 $2.200 $3.550 $3.780
ELEC CONDR (NO.6) INSULATED
LF 13,580.000 $3.250 $2.500 $3.850 $4.140
ELEC CONDR (NO.4) BARE
LF 405.000 $3.500 $3.100 $4.200 $4.500
ELEC CONDR (NO.4) INSULATED
LF 805.000 $4.000 $3.350 $4.200 $4.500
GROUND BOX TY A (122311)W/APRON
EA 32.000 $2,000.000 $1,350.000 $1,870.000 $2,010.000
GROUND BOX TY D (162922)W/APRON
EA 1.000 $2,500.000 $1,500.000 $2,735.000 $2,940.000
REMOVE GROUND BOX
EA 1.000 $500.000 $600.000 $560.000 $600.000
RETRO GROUND BOX (W/SECURE LID)
EA 5.000 $575.000 $4,500.000 $1,565.000 $1,680.000
REMOVE ELECTRICAL SERVICES
EA 3.000 $1,250.000 $1,500.000 $1,340.000 $1,440.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 5.000 $9,750.000 $8,000.000 $11,000.000 $11,700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $800.000 $900.000 $1,255.000 $1,350.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 16.000 $900.000 $900.000 $1,315.000 $1,410.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 33.000 $775.000 $500.000 $1,000.000 $1,080.000
REMOVE SM RD SN SUP&AM
EA 23.000 $130.000 $100.000 $140.000 $150.000
RELOCATE LRSA
EA 4.000 $5,700.000 $5,200.000 $167.000 $6,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 19.000 $25.000 $42.000 $45.000 $48.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1
EA 15.000 $27.000 $33.000 $22.500 $24.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 1.000 $150.000 $75.000 $170.000 $180.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 29,956.000 $0.900 $0.400 $0.450 $0.480
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
LF 963.000 $1.850 $1.000 $1.150 $1.200
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 6,443.000 $2.000 $1.100 $1.250 $1.320
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 9,852.000 $1.200 $1.100 $1.250 $1.320
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 3,648.000 $10.000 $10.000 $11.200 $12.000
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 31.000 $240.000 $210.000 $235.000 $252.000
REFL PAV MRK TY I(W)(DBL ARROW)(090MIL)
EA 20.000 $300.000 $325.000 $365.000 $390.000
REFL PAV MRK TY I(W)(UTURN ARW)(090MIL)
EA 8.000 $275.000 $400.000 $450.000 $480.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 35.000 $250.000 $310.000 $345.000 $372.000
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
EA 260.000 $48.000 $65.000 $73.000 $78.000
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
LF 234.000 $9.000 $8.000 $9.000 $9.600
TY I HIGH PERF PM (W)6"(BRK)(090MIL)
LF 55,954.000 $0.700 $0.660 $0.750 $0.790
TY I HIGH PERF PM (W)6"(SLD)(090MIL)
LF 68,235.000 $0.700 $0.660 $0.750 $0.790
TY I HIGH PERF PM (Y)4"(BRK)(090MIL)
LF 21,520.000 $1.000 $1.100 $1.250 $1.320
TY I HIGH PERF PM (Y)6"(BRK)(090MIL)
LF 5,047.000 $0.700 $0.750 $0.850 $0.900
TY I HIGH PERF PM (Y)6"(SLD)(090MIL)
LF 66,340.000 $0.700 $0.660 $0.750 $0.790
PAVEMENT SLER 4"
LF 21,520.000 $0.200 $0.500 $0.550 $0.600
PLOWABLE REFL PAV MRKR TY I-C
EA 133.000 $40.000 $55.000 $61.450 $66.000
PLOWABLE REFL PAV MRKR TY II-A-A
EA 30.000 $40.000 $75.000 $84.000 $90.000
PLOWABLE REFL PAV MRKR TY II-C-R
EA 679.000 $40.000 $55.000 $61.450 $66.000
ELIM EXT PM & MRKS (4")
LF 29,956.000 $0.600 $0.850 $0.950 $1.020
PAV SURF PREP FOR MRK (4")
LF 21,520.000 $0.150 $0.500 $0.550 $0.600
INSTALL HWY TRF SIG (SYSTEM)
EA 1.000 $32,000.000 $6,500.000 $27,400.000 $29,430.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $2,000.000 $2,000.000 $17,000.000 $18,270.000
PED SIG SEC (LED)(COUNTDOWN)
EA 10.000 $500.000 $800.000 $1,285.000 $1,380.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 3,420.000 $2.000 $1.250 $4.700 $5.040
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 3,885.000 $2.600 $2.500 $6.150 $6.600
PED POLE ASSEMBLY
EA 2.000 $4,000.000 $3,000.000 $5,250.000 $5,640.000
PED DETECT PUSH BUTTON (APS)
EA 10.000 $1,500.000 $900.000 $1,370.000 $1,470.000
PED DETECTOR CONTROLLER UNIT
EA 1.000 $5,000.000 $3,600.000 $5,500.000 $5,910.000
FULL - WIDTH MOWING
CYC 6.000 $10,000.000 $12,791.660 $11,200.000 $16,058.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 8.000 $5,000.000 $6,931.250 $10,000.000 $10,000.000
Totals: $29,748,351.200 $30,982,053.940 $32,618,939.090 $34,218,919.750