POTTER IH 40 (0090-05-099)

Items: 49

County: POTTER
Length: N/A
Highway: IH 40
District: AMARILLO
Control Number: 0090-05-099
DBE Goal: N/A
Project: BR 1702(431)
Guaranty: N/A
Time: 60 WORKING DAYS
Engineer's Estimate: $1,808,708.69
Date: 06/06/2017 (9 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,808,708.69
$1,333,510.55
Over/Under Est: -26.27% -$475,198.14
Over/Under Est: -19.36% -$350,150.99
Amt Left: 9.38% $125,047.15
$1,765,092.50
Over/Under Est: -2.41% -$43,616.19
Amt Left: 32.36% $431,581.95
Delta: -21.02% -$306,534.80
$1,838,756.00
Over/Under Est: 1.66% $30,047.31
Amt Left: 37.89% $505,245.45
Delta: -4.17% -$73,663.50
$2,130,729.00
Over/Under Est: 17.8% $322,020.31
Amt Left: 59.78% $797,218.45
Delta: -15.88% -$291,973.00

Bid Items & Bid Tabulations

49 Total 0 of 49
POTTER  |  IH 40  |  AMARILLO  |  0090-05-099  |  06/06/2017  |  $1,808,708.69  |  BR 1702(431)  |  BRIDGE REPL  |  60 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. LEE MILLIGAN, INC.
COPPELL CONSTRUCTION CO., INC.
EARTH BUILDERS, L.P.
GILVIN-TERRILL, LTD.
FNF CONSTRUCTION, INC.
REMOVING CONC (RIPRAP)
SY 494.000 $20.000 $11.800 $22.000 $50.000 $25.000 $29.000
D-GR HMA(SQ) TY-D SAC-A PG70-28
TON 299.000 $250.000 $150.000 $163.000 $250.000 $200.000 $250.000
PLAN & TEXT CONC PAV(0" TO 1-1/2")
SY 1,058.000 $4.000 $9.300 $12.500 $10.000 $10.000 $24.000
CEM STABIL BKFL
CY 136.000 $200.000 $145.000 $180.000 $200.000 $200.000 $250.000
FLOWABLE BACKFILL
CY 2.500 $175.000 $465.000 $900.000 $200.000 $200.000 $330.000
DRILL SHAFT (18 IN)
LF 190.000 $170.000 $46.200 $49.000 $80.000 $150.000 $100.000
DRILL SHAFT (36 IN)
LF 678.000 $200.000 $153.000 $153.500 $200.000 $300.000 $300.000
CL C CONC (ABUT)(HPC)
CY 54.200 $1,150.000 $1,200.000 $1,500.000 $1,350.000 $1,500.000 $2,500.000
CL C CONC (CAP)(HPC)
CY 38.400 $725.000 $1,400.000 $2,000.000 $1,425.000 $1,500.000 $2,600.000
CL C CONC (COLUMN)(HPC)
CY 44.600 $675.000 $940.000 $1,500.000 $1,425.000 $1,000.000 $2,000.000
REINF CONC SLAB (HPC)
SF 9,292.000 $60.000 $25.350 $30.000 $28.000 $33.500 $33.000
APPROACH SLAB (HPC)
CY 67.800 $630.000 $640.000 $469.000 $750.000 $1,000.000 $820.000
PRESTR CONC GIRDER (TX34)
LF 1,042.500 $245.000 $156.500 $148.000 $275.000 $190.000 $230.000
SILICONE RESIN PAINT FINISH
SF 600.000 $1.850 $6.500 $5.400 $5.000 $7.000 $7.000
RIPRAP (CONC)(4 IN)
CY 56.000 $515.000 $710.000 $510.000 $600.000 $600.000 $1,400.000
RIPRAP (MOW STRIP)(4 IN)
CY 73.000 $515.000 $685.000 $556.000 $500.000 $600.000 $1,000.000
RAIL (TY SSTR)(HPC)
LF 472.000 $85.000 $125.000 $135.000 $75.000 $150.000 $160.000
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 86.000 $165.000 $135.000 $102.000 $100.000 $100.000 $180.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $75,000.000 $126,000.000 $125,000.000 $220,000.000 $185,000.000 $177,000.000
MOBILIZATION
LS 1.000 $154,578.390 $130,000.000 $140,000.000 $200,000.000 $185,000.000 $220,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $20,000.000 $5,240.000 $13,000.000 $10,000.000 $20,000.000 $10,000.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 20.000 $5.000 $11.600 $14.000 $2.000 $10.000 $5.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 150.000 $15.000 $10.000 $11.000 $15.000 $10.000 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 150.000 $2.500 $2.000 $2.250 $5.000 $5.000 $3.000
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 20.000 $2.500 $13.000 $14.000 $5.000 $15.000 $30.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 60.000 $15.000 $15.150 $23.000 $20.000 $10.000 $50.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 480.000 $18.000 $10.200 $13.000 $20.000 $10.000 $60.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,475.000 $30.000 $22.150 $23.000 $25.000 $25.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $2,100.000 $2,160.000 $1,850.000 $1,500.000 $2,000.000 $3,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,600.000 $1,160.000 $1,200.000 $1,250.000 $1,500.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 1,475.000 $4.000 $3.150 $2.000 $5.000 $10.000 $9.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $130.000 $320.000 $350.000 $250.000 $350.000 $500.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 3.000 $340.000 $320.000 $350.000 $250.000 $350.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,900.000 $2,635.000 $2,550.000 $2,000.000 $3,000.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $325.000 $265.000 $350.000 $500.000 $350.000 $500.000
CRASH CUSH ATTEN (STKPL)
EA 1.000 $800.000 $1,015.000 $1,750.000 $2,000.000 $2,000.000 $1,000.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 1.000 $1,700.000 $3,700.000 $1,850.000 $2,000.000 $2,600.000 $700.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 180.000 $1.000 $3.450 $3.250 $4.000 $3.250 $5.000
WK ZN PAV MRK REMOV (W)8"(DOT)
LF 162.000 $1.150 $6.850 $6.500 $7.000 $6.500 $10.000
REFL PAV MRK TY II (W) 4" (BRK)
LF 70.000 $2.000 $0.740 $0.700 $1.000 $0.700 $1.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 255.000 $1.000 $0.740 $0.700 $1.000 $0.700 $1.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 255.000 $1.000 $0.740 $0.700 $1.000 $0.700 $1.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 170.000 $1.000 $2.320 $2.200 $2.500 $2.200 $3.400
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 650.000 $1.000 $2.320 $2.200 $2.500 $2.200 $3.400
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 390.000 $1.000 $2.320 $2.200 $2.500 $2.200 $3.400
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 650.000 $1.000 $2.320 $2.200 $2.500 $2.200 $3.400
ELIM EXT PAV MRK & MRKS (4")
LF 390.000 $2.500 $7.380 $7.000 $8.000 $7.000 $11.000
PAV SURF PREP FOR MRK (4")
LF 580.000 $1.100 $1.690 $1.600 $2.000 $1.600 $2.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 1.000 $12,000.000 $15,120.000 $6,500.000 $15,000.000 $15,000.000 $10,000.000
Totals: $1,808,708.690 $1,333,510.550 $1,458,557.700 $1,765,092.500 $1,838,756.000 $2,130,729.000