POTTER SL 395 (0042-11-006)

Items: 92

County: POTTER
Length: N/A
Highway: SL 395
District: AMARILLO
Control Number: 0042-11-006
DBE Goal: 700.0%
Project: STP 2023(467)TAPS
Guaranty: N/A
Time: 152 WORKING DAYS
Engineer's Estimate: $6,223,591.95
Date: 06/05/2024 (2 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
JOE CHAPPELL
CC SYSOMBATH
DARREL CALDWELL
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$6,223,591.95
Over/Under Est: -3.97% -$247,216.81
$7,496,510.29
Over/Under Est: 20.45% $1,272,918.34
Amt Left: 25.44% $1,520,135.15
$7,978,786.70
Over/Under Est: 28.2% $1,755,194.75
Amt Left: 33.51% $2,002,411.56
Delta: -6.43% -$482,276.41
Subcontractor Percentage Amount
APOLLO CONSTRUCTORS, INC. 18.48% $1,100,740.01
GREEN PLAINS DESIGN 5.86% $349,044.18
TRP CONSTRUCTION GROUP, LLC 4.11% $244,807.44
KING GEORGE TRAFFIC SOLUTIONS LLC 2.42% $144,144.52
BARRICADES UNLIMITED 0.48% $28,590.65
C & C ENVIRONMENTAL SERVICES 0.21% $12,508.41
Total: 31.56% $1,879,835.21

Bid Items & Bid Tabulations

92 Total 0 of 92
POTTER  |  SL 395  |  AMARILLO  |  0042-11-006  |  06/05/2024  |  $6,223,591.95  |  STP 2023(467)TAPS  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  152 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
L A FULLER & SONS CONSTRUCTION, LTD.
TI-ZACK CONCRETE, LLC
GILVIN-TERRILL, LTD.
PREP ROW (TREE) (2" TO 12" DIA)
EA 5.000 $500.000 $1,475.000 $2,750.000 $5,000.000
REMOVING CONC (MEDIANS)
SY 35.000 $30.000 $53.000 $31.270 $25.000
REMOVING CONC (DRIVEWAYS)
SY 2,659.000 $30.000 $24.800 $20.580 $25.000
REMOVING CONC (CURB AND GUTTER)
LF 4,332.000 $25.000 $5.500 $12.630 $15.000
REMOVING CONC (MISC)
SY 32.000 $50.000 $28.500 $34.200 $25.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 2,751.000 $55.000 $17.750 $19.890 $25.000
REMOVING STAB BASE & ASPH PAV(14")
SY 11,992.000 $15.000 $14.500 $36.500 $20.000
REMOVING STAB BASE & ASPH PAV (0-2")
SY 14,164.000 $5.000 $4.000 $38.630 $7.500
IRRIGATION SYSTEM
LS 1.000 $130,000.000 $95,200.000 $300,000.000 $20,000.000
PLANT MATERIAL (5-GAL)
EA 92.000 $75.000 $92.000 $33.000 $550.000
PLANT BED PREPARATION
SY 50.000 $125.000 $110.000 $16.500 $20.000
VEGETATION BARRIER
SY 461.000 $30.000 $7.500 $16.500 $20.000
PLANT MATERIAL (65 GAL) (TREE)
EA 35.000 $975.000 $1,035.000 $1,375.000 $1,000.000
PLANT BED PREP (TYPE I)
SY 461.000 $50.000 $33.700 $16.500 $20.000
PLANT SOIL MIX (TY 1)
CY 307.000 $135.000 $5.000 $275.000 $40.000
FL BS (CMP IN PLC)(TY A GR 4)(12")
SY 9,494.000 $40.000 $27.450 $25.380 $50.000
LIME (HYDRATED LIME (SLURRY))
TON 107.000 $325.000 $725.000 $385.000 $400.000
LIME TRT (EXST MATL)(8")
SY 9,846.000 $7.500 $13.250 $6.600 $50.000
PRIME COAT (MC-30)
GAL 2,462.000 $5.000 $8.000 $6.600 $8.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 1,417.000 $45.000 $98.200 $137.500 $146.000
TRENCH EXCAVATION PROTECTION
LF 135.000 $10.000 $491.550 $357.500 $115.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 568.000 $350.000 $440.000 $357.500 $350.000
RIPRAP (MOW STRIP)(6 IN)
CY 30.500 $1,796.000 $2,613.250 $957.380 $2,500.000
RC PIPE (CL IV)(24 IN)
LF 61.000 $160.000 $373.250 $521.020 $700.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 2.000 $7,000.000 $28,125.000 $13,084.500 $20,000.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 3.000 $7,500.000 $37,068.550 $15,493.500 $20,000.000
JCTBOX(COMPL)(PJB)(3FTX5FT)
EA 1.000 $7,500.000 $41,078.690 $20,905.500 $25,000.000
JCTBOX(COMPL)(PJB)(5FTX5FT)
EA 1.000 $8,000.000 $38,084.850 $25,916.000 $25,000.000
INLET (COMPL)(PCO)(4FT)(BOTH)
EA 7.000 $11,000.000 $24,332.400 $22,286.000 $30,000.000
ADJUSTING MANHOLES (ELECTRIC BOX)
EA 5.000 $2,000.000 $929.500 $1,320.000 $1,000.000
REMOV STR (INLET)
EA 7.000 $1,500.000 $2,149.750 $1,650.000 $2,000.000
REMOVE STR (BOLLARD)
EA 5.000 $175.000 $206.550 $2,040.500 $1,500.000
MOBILIZATION
LS 1.000 $655,000.000 $403,129.100 $699,006.000 $775,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $15,000.000 $41,898.950 $27,500.000 $60,000.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,260.000 $8.500 $10.000 $11.000 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,260.000 $2.000 $3.000 $5.500 $4.000
LANDSCAPE PAVERS
SY 1,891.000 $234.000 $200.850 $154.000 $100.000
LANDSCAPE PAVERS (TYPE I)
SY 6.000 $360.000 $285.250 $275.000 $100.000
CONC CURB & GUTTER (TY II)
LF 3,119.000 $50.000 $32.800 $62.510 $30.000
CONC CURB (SLOTTED)
LF 751.000 $35.000 $37.750 $62.510 $32.000
CONC CURB & GUTTER (VALLEY GUTTER)
LF 312.000 $125.000 $48.200 $74.740 $45.000
CONCRETE CURB (SPECIAL)
LF 564.000 $100.000 $51.180 $97.110 $55.000
DRIVEWAYS (CONC)
SY 2,651.000 $120.000 $75.150 $134.510 $125.000
CONC SIDEWALKS (4")
SY 1,311.000 $90.000 $60.550 $120.610 $80.000
CONC SIDEWALKS (6")
SY 2,215.000 $120.000 $69.500 $145.240 $85.000
CURB RAMPS (TY 5)
EA 2.000 $3,000.000 $2,439.980 $3,146.820 $2,200.000
CURB RAMPS (TY 7)
EA 33.000 $2,250.000 $2,005.100 $3,146.820 $1,550.000
CURB RAMPS (TY 10)
EA 1.000 $2,500.000 $2,152.750 $3,146.820 $1,575.000
REMOVE RD IL ASM (SHOE-BASE)
EA 36.000 $100.000 $1,760.000 $825.000 $800.000
IN RD IL (TY SA) 40S-10 (250W EQ) LED
EA 18.000 $9,000.000 $6,280.000 $5,885.000 $5,500.000
CONDT (PVC) (SCH 40) (2")
LF 4,410.000 $20.000 $26.500 $24.480 $25.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 2,750.000 $30.000 $37.600 $35.200 $32.000
CONDT (PVC) (SCH 40) (3")
LF 215.000 $48.000 $50.000 $46.480 $45.000
CONDT (RM) (2")
LF 15.000 $90.000 $118.000 $110.000 $100.000
ELEC CONDR (NO.6) BARE
LF 7,260.000 $2.200 $3.400 $2.090 $3.000
ELEC CONDR (NO.6) INSULATED
LF 15,660.000 $2.850 $4.000 $3.690 $3.500
GROUND BOX TY A (122311)W/APRON
EA 4.000 $2,000.000 $2,270.000 $2,128.500 $2,000.000
ELC SRV TY A 240/480 060(NS)SS(E)PS(U)
EA 1.000 $15,000.000 $11,300.000 $10,587.500 $9,650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $800.000 $1,440.000 $1,100.000 $1,500.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 20.000 $500.000 $1,440.000 $605.000 $1,000.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 312.000 $0.750 $2.850 $2.700 $5.000
PAVEMENT SEALER 6"
LF 7,959.000 $0.350 $0.700 $0.660 $0.200
PAVEMENT SEALER 8"
LF 312.000 $0.400 $0.800 $0.750 $0.200
PAVEMENT SEALER 24"
LF 1,781.000 $2.000 $1.750 $1.650 $2.250
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 1,321.000 $0.500 $2.600 $2.480 $2.250
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 1,142.000 $0.250 $1.500 $1.460 $2.250
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 5,496.000 $1.000 $1.500 $1.420 $2.250
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 1,781.000 $20.000 $41.500 $39.600 $20.000
PREFAB PAV MRK TY B (W)(ARROW)
EA 20.000 $850.000 $777.000 $742.500 $250.000
PREFAB PAV MRK TY C (MULTI) (SHIELD)
EA 6.000 $19,600.000 $6,760.000 $6,462.500 $25,000.000
REMOVING TRAFFIC SIGNALS
EA 2.000 $15,000.000 $6,280.000 $5,885.000 $5,500.000
INSTALL HWY TRF SIG (UPGRADE)
EA 2.000 $20,000.000 $9,115.000 $8,541.500 $8,000.000
PED SIG SEC (LED)(COUNTDOWN)
EA 16.000 $870.000 $1,000.000 $935.000 $850.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 140.000 $5.000 $5.250 $4.900 $5.000
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
LF 1,360.000 $6.000 $7.500 $6.990 $7.000
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 2,340.000 $2.650 $3.800 $3.520 $3.500
PED POLE ASSEMBLY
EA 10.000 $4,500.000 $5,990.000 $5,610.000 $5,100.000
PED DETECT PUSH BUTTON (APS)
EA 16.000 $950.000 $1,145.000 $1,072.500 $1,000.000
PED DETECTOR CONTROLLER UNIT
EA 2.000 $5,000.000 $5,225.000 $4,895.000 $4,500.000
LANDSCAPE AMENITY (TY 1)
EA 12.000 $750.000 $170.000 $5,500.000 $1,000.000
LANDSCAPE AMENITY (TY 2)
EA 10.000 $2,000.000 $870.000 $1,650.000 $1,000.000
LANDSCAPE AMENITY (TY 3)
EA 6.000 $4,550.000 $3,325.000 $1,650.000 $1,000.000
TREE PROTECTION
EA 105.000 $35.000 $368.000 $165.000 $1,000.000
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
CY 65.000 $500.000 $85.000 $440.000 $100.000
D-GR HMA TY-B PG64-22
TON 1,394.000 $120.000 $150.000 $214.500 $250.000
D-GR HMA TY-D PG70-28
TON 2,548.000 $150.000 $160.000 $214.500 $300.000
TACK COAT
GAL 3,240.000 $4.500 $8.810 $8.800 $6.000
CONDUIT (PREPARE)
LF 825.000 $4.500 $1.750 $1.650 $1.500
GROUND BOX (PREPARE)
EA 10.000 $550.000 $675.000 $632.500 $600.000
TMA (STATIONARY)
DAY 260.000 $225.000 $7.900 $1.100 $850.000
TMA (MOBILE OPERATION)
HR 2,080.000 $80.000 $34.300 $1.100 $55.000
INSTALL DECORATIVE LIGHTING ASSEMBLY
EA 53.000 $7,500.000 $8,140.000 $7,628.500 $10,000.000
Totals: $6,223,591.950 $5,976,375.145 $7,496,510.290 $7,978,786.700