PREPARING ROW
|
AC
|
1.070
|
$10,000.000
|
$1,725.000
|
$25,000.000
|
|
|
PREPARING ROW (TREE) (0" TO 6" DIA)
|
EA
|
2.000
|
$280.000
|
$730.000
|
$5,000.000
|
|
|
REMOVING STAB BASE & ASPH PAV (12")
|
SY
|
780.000
|
$10.000
|
$10.200
|
$50.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,682.000
|
$20.000
|
$30.000
|
$35.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
1,113.000
|
$25.000
|
$32.000
|
$35.000
|
|
|
BLADING
|
STA
|
5.300
|
$200.000
|
$390.000
|
$300.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
8.570
|
$1,200.000
|
$520.000
|
$700.000
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
8.570
|
$500.000
|
$425.000
|
$600.000
|
|
|
FL BS (CMP IN PLC)(TY A OR B GR4)(12")
|
SY
|
5,510.000
|
$36.000
|
$30.000
|
$30.000
|
|
|
REWORK BS MTL (TY B)(12")(DENS CONT)
|
SY
|
3,697.000
|
$6.000
|
$12.000
|
$28.500
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,712.000
|
$7.000
|
$5.250
|
$5.000
|
|
|
EMULS ASPH (EROSN CONT)(MS-2)
|
GAL
|
4,148.000
|
$7.000
|
$4.200
|
$5.000
|
|
|
PLANE ASPH CONC PAV(4.5")
|
SY
|
5,038.000
|
$7.000
|
$11.400
|
$15.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
8.500
|
$350.000
|
$320.000
|
$500.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
2.000
|
$500.000
|
$1,115.000
|
$200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$2,500.000
|
$5,045.000
|
$10,000.000
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
2.000
|
$1,000.000
|
$3,365.000
|
$5,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
22.000
|
$26.000
|
$55.000
|
$100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$55,000.000
|
$114,000.000
|
$130,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$12,500.000
|
$16,500.000
|
$23,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
160.000
|
$4.980
|
$5.850
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
160.000
|
$1.490
|
$2.250
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
650.000
|
$5.000
|
$8.850
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
650.000
|
$1.500
|
$4.300
|
$1.000
|
|
|
PERM CTB (SSCB)(TY 1)(MOD)
|
LF
|
1,054.000
|
$160.000
|
$99.800
|
$120.000
|
|
|
PERM CTB (SGL SLOPE)(TY 1)(TRANSITION)
|
LF
|
28.000
|
$205.000
|
$253.350
|
$250.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
340.000
|
$4.670
|
$5.300
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$350.000
|
$317.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$35,000.000
|
$29,000.000
|
$25,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
7.000
|
$775.000
|
$900.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
10.000
|
$900.000
|
$1,050.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
2.000
|
$1,100.000
|
$1,265.000
|
$1,100.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$800.000
|
$715.000
|
$600.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$129.760
|
$105.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
26.000
|
$150.000
|
$145.000
|
$150.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
|
EA
|
2.000
|
$150.000
|
$145.000
|
$200.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
11.000
|
$20.000
|
$19.000
|
$20.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
5.000
|
$150.000
|
$148.000
|
$125.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
20.000
|
$20.000
|
$16.000
|
$35.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
52.000
|
$1.200
|
$1.250
|
$2.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
|
LF
|
215.000
|
$1.000
|
$0.700
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
2,560.000
|
$1.000
|
$1.350
|
$1.280
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
50.000
|
$7.000
|
$21.100
|
$8.000
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
6.000
|
$145.000
|
$210.000
|
$100.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
4.000
|
$175.000
|
$317.000
|
$100.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
4,147.000
|
$0.500
|
$0.690
|
$0.900
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
4,004.000
|
$0.500
|
$0.690
|
$0.840
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
4,148.000
|
$0.500
|
$0.690
|
$0.840
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
52.000
|
$4.450
|
$21.100
|
$5.000
|
|
|
D-GR HMA TY-B PG64-28
|
TON
|
806.000
|
$180.000
|
$165.550
|
$130.000
|
|
|
TACK COAT
|
GAL
|
692.000
|
$5.000
|
$3.250
|
$4.000
|
|
|
SP MIXES SP-D SAC-A PG70-28
|
TON
|
628.000
|
$180.000
|
$186.000
|
$135.000
|
|
|
TACK COAT
|
GAL
|
742.000
|
$5.000
|
$3.250
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$13,750.000
|
$22,300.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
75.000
|
$350.000
|
$310.000
|
$550.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
20.000
|
$100.000
|
$85.000
|
$95.000
|
|
Totals: |
$1,099,558.860
|
$1,149,484.510
|
$1,316,832.280
|