Show Job Controls
Bid Cobra

POLK US0059 (6482-24-001)

Items: 39

County: POLK
Length: 0.0000 MILES
Highway: US0059
District: LUFKIN
Control Number: 6482-24-001
DBE Goal: N/A
Project: RMC - A00214694
Guaranty: $5,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $190,930.60
Date: 05/21/2025 (1 year ago)
Contract Number: 5251101
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00214694
Project Description: REPAIR/UPGRADE AND MAINTENANCE OF METAL BEAM GUARD FENCE
Mail/Deliver Bids To: N/A
LAUREN PERRY
TAMARA GIBSON
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$190,930.60
Over/Under Est: -14.34% -$27,375.60
Over/Under Est: 80.38% $153,474.40
Amt Left: 110.57% $180,850.00

Bid Items & Bid Tabulations

39 Total 0 of 39
POLK  |  US0059  |  LUFKIN  |  6482-24-001  |  05/21/2025  |  $190,930.60  |  RMC - A00214694  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BARRICADE COMPANY, L.L.C.
ACE CONTRACTORS, INC.
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 5.000 $50.000 $40.000 $500.000
MOBILIZATION (CALLOUT)
EA 10.000 $500.000 $1,000.000 $1,500.000
TMA (STATIONARY)
DAY 30.000 $250.000 $1.000 $1,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 250.000 $25.000 $20.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $1,250.000 $400.000 $1,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,365.500 $400.000 $1,500.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 5.000 $100.000 $50.000 $20.000
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $2.380 $0.250 $5.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 5.000 $15.000 $5.000 $1.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 5.000 $20.790 $5.000 $1.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 5.000 $15.000 $5.000 $1.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 5.000 $31.000 $100.000 $1.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 5.000 $15.000 $5.000 $1.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 5.000 $15.000 $5.000 $1.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 1,000.000 $15.000 $40.000 $35.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 50.000 $1.000 $1.000 $1.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 5.000 $2.330 $250.000 $1.000
REPLACE TIMBER POST W/O CONC FND
EA 100.000 $75.000 $50.000 $70.000
REPLACE STEEL POST W/O CONC FND
EA 100.000 $39.600 $1.000 $1.000
REPLACE TIMBER POST W/ CONC FND
EA 5.000 $75.000 $4,650.000 $75.000
REPLACE STEEL POST W/ CONC FND
EA 5.000 $39.600 $500.000 $80.000
REALIGN POSTS
EA 50.000 $15.000 $150.000 $45.000
REPLACE TERMINAL ANCHOR POSTS
EA 5.000 $20.000 $1.000 $1.000
REM OBSOLETE GET & REPL W/ SGT
EA 25.000 $3,000.000 $500.000 $6,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 5.000 $500.000 $2,600.000 $850.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 400.000 $15.000 $25.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 50.000 $45.000 $80.000 $150.000
REPLACE BLOCKOUT
EA 100.000 $50.000 $100.000 $25.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $55.600 $100.000 $1.000
RESET SGT IMPACT HEAD
EA 5.000 $200.000 $800.000 $200.000
REPLACE SGT OBJECT MARKER
EA 5.000 $50.000 $1.000 $25.000
REPLACE SGT CABLE ANCHOR
EA 5.000 $1.000 $1.000 $1.000
REPLACE SGT CABLE ASSEMBLY
EA 5.000 $50.500 $1.000 $50.000
REPLACE SGT STRUT
EA 5.000 $250.000 $1.000 $1.000
REPAIR (TAU II-R) NARROW
LF 25.000 $190.000 $100.000 $1,250.000
REPLACE (NARROW QUAD)
EA 2.000 $800.000 $600.000 $50.000
REPAIR (T101)
LF 300.000 $10.000 $5.000 $75.000
REPAIR (T101RC)
LF 100.000 $10.000 $5.000 $1.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 50.000 $500.000 $80.000 $25.000
Totals: $190,930.600 $163,555.000 $344,405.000