POLK US0059 (6466-58-001)

Items: 34

County: POLK
Length: N/A
Highway: US0059
District: LUFKIN
Control Number: 6466-58-001
DBE Goal: 0.0%
Project: RMC - 646658001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $182,820.65
Date: 05/29/2024 (2 years ago) Changed
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
JEREMY KING
TAMARA GIBSON
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$182,820.65
Over/Under Est: -16% -$29,259.65
Over/Under Est: -7.75% -$14,162.65
Amt Left: 9.83% $15,097.00

Bid Items & Bid Tabulations

34 Total 0 of 34
POLK  |  US0059  |  LUFKIN  |  6466-58-001  |  05/29/2024  |  $182,820.65  |  RMC - 646658001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BARRICADE COMPANY, L.L.C.
HAZMAT INTERNATIONAL, INC.
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 5.000 $205.000 $55.000 $65.000
MOBILIZATION (CALLOUT)
EA 6.000 $500.000 $900.000 $500.000
MTL W-BEAM GD FEN (TIM POST)
LF 250.000 $27.230 $25.000 $20.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $2,345.000 $500.000 $400.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,500.000 $500.000 $1,000.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 5.000 $1,300.000 $500.000 $500.000
REMOVE METAL BEAM GUARD FENCE
LF 350.000 $3.300 $5.000 $2.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 5.000 $24.100 $15.000 $5.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 5.000 $26.870 $15.000 $5.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 5.000 $25.000 $15.000 $5.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 5.000 $35.000 $15.000 $5.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 5.000 $34.910 $15.000 $5.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 5.000 $33.250 $15.000 $5.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 1,000.000 $20.000 $14.000 $18.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 35.000 $45.000 $1.000 $30.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 5.000 $38.000 $5.000 $40.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 200.000 $55.000 $1.000 $30.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 5.000 $75.000 $50.000 $65.000
REALIGN POSTS
EA 50.000 $18.000 $10.000 $20.000
REMOVE & REPLACE BLOCKOUT
EA 75.000 $25.000 $50.000 $25.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 400.000 $32.000 $15.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 50.000 $100.000 $80.000 $65.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 20.000 $3,500.000 $3,000.000 $3,900.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 5.000 $1,000.000 $800.000 $1,200.000
REM & RESET SGT IMPACT HEAD
EA 5.000 $150.000 $25.000 $100.000
REPLACE SGT CABLE ASSEMBLY
EA 5.000 $100.000 $1.000 $75.000
REPLACE SGT CABLE ANCHOR
EA 5.000 $100.000 $1.000 $75.000
REPLACE SGT STRUT
EA 5.000 $77.500 $1.000 $75.000
REPLACE SGT OBJECT MARKER
EA 2.000 $30.000 $1.000 $1.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $250.000 $80.000 $100.000
REPAIR (NARROW QUAD)
EA 2.000 $1,200.000 $800.000 $100.000
REPAIR TAU II (N)
LF 25.000 $10.000 $190.000 $350.000
REPAIR (W-BEAM - T101 RAIL)
LF 400.000 $20.500 $10.000 $28.000
TMA (STATIONARY)
DAY 6.000 $200.000 $4,714.000 $1.000
Totals: $182,820.650 $153,561.000 $168,658.000