POLK US 59 (0176-05-199)

Items: 27

County: POLK
Length: N/A
Highway: US 59
District: LUFKIN
Control Number: 0176-05-199
DBE Goal: N/A
Project: C 176-5-199
Guaranty: N/A
Time: 69 WORKING DAYS
Engineer's Estimate: $4,883,633.20
Date: 01/05/2023 (3 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$4,883,633.20
Over/Under Est: 14.65% $715,586.26
Over/Under Est: 21.11% $1,030,889.10
Amt Left: 5.63% $315,302.84

Bid Items & Bid Tabulations

27 Total 0 of 27
POLK  |  US 59  |  LUFKIN  |  0176-05-199  |  01/05/2023  |  $4,883,633.20  |  C 176-5-199  |  RESURF ROADWAY  |  69 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
TEXAS MATERIALS GROUP, INC.
BACKFILL (TY B)
STA 553.000 $110.000 $114.770 $130.200
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 112,858.000 $0.150 $0.130 $0.140
VEGETATIVE WATERING
MG 2,257.000 $20.000 $23.050 $0.010
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 7,500.000 $93.000 $109.200 $126.230
PLANE ASPH CONC PAV(0" TO 2")
SY 7,600.000 $3.000 $5.120 $4.000
MOBILIZATION
LS 1.000 $450,000.000 $172,119.130 $375,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $3,000.000 $794.590 $2,800.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 100.000 $3.500 $16.170 $2.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 100.000 $1.500 $7.160 $1.000
RUMBLE STRIPS (SHOULDER)
LF 110,648.000 $0.250 $0.230 $0.170
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 6,473.000 $1.400 $1.410 $1.500
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 2,190.000 $1.700 $1.740 $1.100
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 6,896.000 $1.200 $1.100 $1.100
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 13,840.000 $0.600 $0.750 $0.830
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 55,324.000 $0.600 $0.750 $0.820
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 55,324.000 $0.600 $0.750 $0.830
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 34.000 $14.000 $17.370 $22.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 68.000 $180.000 $289.570 $231.000
PREFAB PAV MRK TY C (W) (WORD)
EA 68.000 $220.000 $376.450 $259.000
REFL PAV MRKR TY II-C-R
EA 1,039.000 $5.200 $5.210 $5.400
SP MIXES SP-D PG64-22
TON 164.000 $200.000 $275.680 $383.000
TACK COAT
GAL 396.000 $7.000 $9.260 $6.000
PFC-C (PG76 MIX) SAC-A
TON 20,880.000 $150.000 $183.700 $186.150
UNDERSEAL COURSE
GAL 49,711.000 $3.500 $6.230 $5.850
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $10,424.650 $5,000.000
TMA (STATIONARY)
DAY 69.000 $160.000 $223.880 $25.000
TMA (MOBILE OPERATION)
DAY 207.000 $120.000 $28.960 $25.000
Totals: $4,883,633.200 $5,599,219.460 $5,914,522.300