Show Job Controls
Bid Cobra

PECOS IH0010 (6335-06-001)

Items: 22

County: PECOS
Length: N/A
Highway: IH0010
District: ODESSA
Control Number: 6335-06-001
DBE Goal: N/A
Project: RMC - 633506001
Guaranty: N/A
Time: 366 CALENDAR DAYS
Engineer's Estimate: $440,850.00
Date: 09/06/2018 (7 years ago)
Contract Number: N/A
Type: EMERGENCY MBGF REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$440,850.00
$431,400.75
Over/Under Est: -2.14% -$9,449.25
$564,000.00
Over/Under Est: 27.93% $123,150.00
Amt Left: 30.74% $132,599.25
$673,500.00
Over/Under Est: 52.77% $232,650.00
Amt Left: 56.12% $242,099.25
Delta: -19.41% -$109,500.00

Bid Items & Bid Tabulations

22 Total 0 of 22
PECOS  |  IH0010  |  ODESSA  |  6335-06-001  |  09/06/2018  |  $440,850.00  |  RMC - 633506001  |  EMERGENCY MBGF REPAIR  |  366 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ELITE CASTLE RESOURCES LLC
HJC FARMS, INC.
RELMCO, INC.
MOBILIZATION (CALLOUT)
EA 50.000 $300.000 $0.010 $250.000 $2,500.000
MOBILIZATION (EMERGENCY)
EA 25.000 $300.000 $0.010 $100.000 $5,000.000
TERMINAL ANCHOR SECTION
EA 15.000 $200.000 $150.000 $200.000 $1,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $1,200.000 $1,500.000 $700.000 $1,500.000
REMOVE TERMINAL ANCHOR SECTION
EA 15.000 $100.000 $100.000 $1.000 $500.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 10.000 $100.000 $5.000 $1.000 $500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 50.000 $100.000 $55.000 $500.000 $500.000
GDRAIL END TRT(INSTALL)(HBA POST)
EA 50.000 $3,000.000 $4,000.000 $4,500.000 $3,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 75.000 $10.000 $50.000 $20.000 $35.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 75.000 $10.000 $50.000 $5.000 $35.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 6,000.000 $25.000 $25.000 $27.500 $10.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 100.000 $50.000 $1.000 $25.000 $20.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 400.000 $25.000 $5.000 $25.000 $10.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 400.000 $50.000 $50.000 $60.000 $50.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 100.000 $30.000 $40.000 $50.000 $65.000
REPAIR STEEL POST WITH BASE PLATE
EA 20.000 $50.000 $100.000 $200.000 $125.000
REALIGN POSTS
EA 150.000 $20.000 $1.000 $20.000 $20.000
REMOVE & REPLACE BLOCKOUT
EA 300.000 $15.000 $20.000 $20.000 $30.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 100.000 $35.000 $40.000 $35.000 $50.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 10.000 $35.000 $10.000 $10.000 $125.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 1,000.000 $5.000 $5.000 $4.000 $5.000
TMA (STATIONARY)
EA 3.000 $13,000.000 $3,000.000 $20,000.000 $25,000.000
Totals: $440,850.000 $431,400.750 $564,000.000 $673,500.000