Show Job Controls
Bid Cobra

PECOS US 285 (0139-08-037)

Items: 42

County: PECOS
Length: N/A
Highway: US 285
District: ODESSA
Control Number: 0139-08-037
DBE Goal: N/A
Project: NH 2017(474)
Guaranty: N/A
Time: 58 WORKING DAYS
Engineer's Estimate: $1,128,399.93
Date: 03/08/2017 (9 years ago)
Contract Number: N/A
Type: ROADWAY WIDENING
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$1,128,399.93
$1,244,957.00
Over/Under Est: 10.33% $116,557.07
$1,254,254.00
Over/Under Est: 11.15% $125,854.07
Amt Left: 0.75% $9,297.00
$1,438,822.42
Over/Under Est: 27.51% $310,422.49
Amt Left: 15.57% $193,865.42
Delta: -14.72% -$184,568.42
$1,534,136.55
Over/Under Est: 35.96% $405,736.62
Amt Left: 23.23% $289,179.55
Delta: -6.62% -$95,314.13
Over/Under Est: 43.92% $495,621.29
Amt Left: 30.45% $379,064.22
Delta: -5.86% -$89,884.67
Over/Under Est: 59.51% $671,522.68
Amt Left: 44.58% $554,965.61
Delta: -10.83% -$175,901.39

Bid Items & Bid Tabulations

42 Total 0 of 42
PECOS  |  US 285  |  ODESSA  |  0139-08-037  |  03/08/2017  |  $1,128,399.93  |  NH 2017(474)  |  ROADWAY WIDENING  |  58 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
REECE ALBERT, INC.
CI CONSTRUCTORS, INC.
ALLEN KELLER COMPANY
FNF CONSTRUCTION, INC.
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
REMOVING CONC (RIPRAP)
SY 105.000 $17.250 $15.750 $20.000 $35.000 $15.000 $30.000 $29.660
REMOVING CONC (DRIVEWAYS)
CY 83.000 $15.890 $1.000 $20.000 $40.000 $79.000 $25.000 $116.200
EXCAVATION (ROADWAY)
CY 7,846.000 $15.000 $9.200 $8.000 $15.000 $8.000 $26.000 $15.920
EMBANKMENT (ORIGINAL)(ORD COMP)(TY B)
CY 865.000 $10.000 $55.800 $8.000 $11.000 $6.500 $18.000 $17.600
BLADING
HR 20.000 $20.000 $136.000 $200.000 $160.000 $158.000 $400.000 $163.590
PROOF ROLLING
HR 15.000 $15.000 $81.850 $120.000 $160.000 $76.000 $150.000 $75.370
FL BS (CMP IN PLC)(TY A GR 4) (8")
SY 23,082.000 $10.000 $11.900 $11.000 $12.000 $16.000 $12.010 $16.590
FL BS (CMP IN PLC)(TY A GR 4)(12")
SY 3,583.000 $14.000 $17.900 $16.000 $19.500 $25.000 $24.520 $29.010
PRIME COAT (AE-P)
GAL 5,336.000 $3.000 $6.900 $3.000 $4.700 $4.000 $4.570 $4.260
FOG SEAL (SS-1H OR CSS-1H)
GAL 5,319.000 $4.000 $5.550 $3.000 $5.000 $3.000 $4.100 $3.800
AGGR(TY-PB GR-4 SAC-A)
CY 374.000 $110.000 $121.250 $215.000 $165.000 $225.000 $108.650 $211.020
ASPH (AC-20-5TR OR AC-20XP)
GAL 17,856.000 $2.520 $2.950 $2.750 $4.500 $3.500 $3.090 $3.280
SUPERPAVE MIXTURES SP-D SAC-A PG70-22
TON 2,927.000 $115.000 $75.750 $120.000 $121.000 $95.000 $130.000 $159.150
CEM STABIL BKFL
CY 16.000 $87.000 $210.000 $360.000 $210.000 $193.000 $510.400 $226.900
RIPRAP (CONC)(5 IN)
CY 27.000 $560.000 $561.750 $695.000 $570.000 $700.000 $1,148.400 $906.810
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 10.000 $350.000 $866.250 $590.000 $875.000 $890.000 $927.300 $1,546.390
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 13.000 $450.000 $1,312.500 $1,080.000 $1,300.000 $1,800.000 $2,140.600 $1,232.240
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 2.000 $5,000.000 $8,137.500 $13,000.000 $8,200.000 $12,300.000 $16,753.000 $8,993.140
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
EA 4.000 $8,000.000 $9,187.500 $11,800.000 $9,300.000 $10,400.000 $11,726.000 $13,648.140
REMOV STR (SMALL)
EA 2.000 $900.000 $2,065.000 $2,700.000 $1,400.000 $5,000.000 $1,254.000 $2,510.850
MOBILIZATION
LS 1.000 $102,581.810 $199,105.150 $124,846.520 $130,000.000 $152,836.050 $180,000.000 $269,855.280
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $4,000.000 $6,595.000 $5,000.000 $23,000.000 $30,000.000 $10,000.000 $2,426.890
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 580.000 $12.000 $9.100 $2.700 $12.000 $10.000 $10.500 $13.430
BIODEG EROSN CONT LOGS (REMOVE)
LF 580.000 $2.000 $0.750 $2.000 $1.500 $1.500 $2.150 $2.430
DRIVEWAYS (CONC)
SY 83.000 $117.100 $99.750 $110.000 $100.000 $88.000 $222.200 $203.930
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 9.000 $600.000 $1,050.000 $600.000 $1,050.000 $1,400.000 $1,100.000 $1,114.920
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $900.000 $1,260.000 $1,100.000 $1,200.000 $1,600.000 $1,320.000 $1,454.320
REMOVE SM RD SN SUP&AM
EA 10.000 $78.750 $105.000 $175.000 $100.000 $135.000 $110.000 $123.430
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $93.500 $157.500 $150.000 $160.000 $200.000 $165.000 $178.430
REMOVE DELIN & OBJECT MARKER ASSMS
EA 6.000 $10.150 $15.750 $38.000 $16.000 $20.000 $110.000 $38.890
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 16,794.000 $0.120 $0.240 $0.260 $0.230 $0.250 $0.240 $0.260
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 16,794.000 $0.120 $0.240 $0.260 $0.230 $0.250 $0.240 $0.260
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,464.000 $1.950 $1.850 $2.000 $2.000 $2.000 $1.480 $1.300
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,264.000 $1.950 $1.950 $2.000 $2.000 $2.000 $1.680 $1.510
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 2,439.000 $0.240 $0.420 $0.600 $0.550 $0.600 $0.570 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 10,946.000 $0.240 $0.390 $0.600 $0.550 $0.600 $0.570 $0.430
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 2,439.000 $0.240 $0.390 $0.600 $0.550 $0.600 $0.570 $0.460
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 12,636.000 $0.240 $0.390 $0.600 $0.550 $0.600 $0.570 $0.440
REFL PAV MRKR TY I-C
EA 122.000 $2.210 $3.680 $4.700 $4.000 $5.000 $4.400 $4.950
REFL PAV MRKR TY II-A-A
EA 388.000 $2.210 $3.680 $4.700 $4.000 $5.000 $4.400 $4.200
ELIM EXT PAV MRK & MRKS (4")
LF 16,368.000 $0.390 $0.370 $0.950 $0.860 $1.000 $0.890 $0.420
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $4,110.000 $6,500.000 $4,000.000 $24,400.000 $18,700.000 $9,337.300
Totals: $1,128,399.930 $1,244,957.000 $1,254,254.000 $1,438,822.420 $1,534,136.550 $1,624,021.220 $1,799,922.610