Show Job Controls
Bid Cobra

PECOS US 67 (0076-01-029)

Items: 119

County: PECOS
Length: N/A
Highway: US 67
District: ODESSA
Control Number: 0076-01-029
DBE Goal: N/A
Project: NH 1802(325)
Guaranty: N/A
Time: 798 WORKING DAYS
Engineer's Estimate: $46,872,978.88
Date: 04/03/2019 (7 years ago)
Contract Number: N/A
Type: ROADWAY WIDENING TO A MODIFIED SUPER 2
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$46,872,978.88
Over/Under Est: 4.4% $2,063,577.42
$50,997,602.37
Over/Under Est: 8.8% $4,124,623.49
Amt Left: 4.21% $2,061,046.07
$54,256,401.41
Over/Under Est: 15.75% $7,383,422.53
Amt Left: 10.87% $5,319,845.11
Delta: -6.39% -$3,258,799.04
Over/Under Est: 40.78% $19,113,755.64
Amt Left: 34.84% $17,050,178.22
Delta: -21.62% -$11,730,333.11
Subcontractor Percentage Amount
RELMCO, INC. 12.55% $6,141,537.82
TAKCO, INC. 9.00% $4,404,290.07
STURGEON SERVICES OF TEXAS, INC. 5.85% $2,862,788.54
DTM TRUCKING, INC. 3.30% $1,614,906.36
HERITAGE MATERIALS, LLC 2.89% $1,414,266.48
PMI PAVEMENT MARKING, LLC 2.39% $1,169,583.70
FLASHER EQUIPMENT COMPANY 2.21% $1,081,497.89
FLR OILFIELD SERVICES, LLC 1.79% $875,964.36
RPV CONSTRUCTION, LLC 0.91% $445,322.66
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 0.76% $371,917.83
MARCOM"S MOWING SERVICE, LLC 0.20% $97,873.11
DIAMOND C LOGISTICS TX LLC 0.00% $0.00
SIBONEY CONTRACTING CO. 0.00% $0.00
WILD WEST TRUCKING, LLC 0.00% $0.00
Total: 41.85% $20,479,948.82

Bid Items & Bid Tabulations

119 Total 0 of 119
PECOS  |  US 67  |  ODESSA  |  0076-01-029  |  04/03/2019  |  $46,872,978.88  |  NH 1802(325)  |  ROADWAY WIDENING TO A MODIFIED SUPER...  |  798 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
FNF CONSTRUCTION, INC.
DELHUR INDUSTRIES, INC.
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
PREPARING ROW
STA 1,616.000 $240.000 $1,000.000 $500.000 $428.320 $355.000
EXCAVATION (ROADWAY)
CY 128,347.000 $12.000 $6.000 $10.500 $3.540 $21.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 192,336.000 $13.000 $6.000 $12.500 $10.240 $24.000
BLADING
HR 100.000 $200.000 $138.000 $210.000 $180.000 $500.000
CELL FBR MLCH SEED(TEMP)(WARM)
SY 275,264.000 $0.270 $0.400 $0.310 $0.340 $0.300
CELL FBR MLCH SEED(TEMP)(COOL)
SY 275,264.000 $0.300 $0.400 $0.310 $0.340 $0.300
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 550,525.000 $0.150 $0.340 $0.160 $0.170 $0.150
PROOF ROLLING
HR 100.000 $100.000 $73.000 $91.000 $120.000 $150.000
FL BS (CMP IN PLC)(TY A GR 4)(12")
SY 1,083,882.000 $12.000 $12.000 $12.000 $13.330 $17.450
PRIME COAT (MC-30)
GAL 159,509.000 $4.850 $5.000 $6.000 $5.660 $5.550
PRIME COAT (SS-1H)
GAL 28,250.000 $4.850 $4.000 $2.000 $4.480 $0.300
ASPH (AC-20-5TR)
GAL 198,488.000 $4.000 $5.000 $4.000 $4.990 $4.560
ASPH (RC-250)
GAL 396,959.000 $3.550 $5.000 $4.750 $5.380 $5.000
AGGR(TY-B GR-5 SAC-A)
CY 11,106.000 $80.000 $55.000 $87.000 $114.880 $120.000
AGGR(TY-PB GR-4 SAC-A)
CY 5,560.000 $73.000 $100.000 $132.000 $165.280 $150.000
SUPERPAVE MIXTURES SP-B PG70-22
TON 2,443.000 $87.000 $122.000 $182.000 $96.000 $435.000
TOM-C (AGGREGATE) SAC-A
TON 49,917.000 $70.000 $125.000 $69.750 $87.120 $95.000
TOM (ASPHALT) PG 70-22
TON 3,779.000 $540.000 $125.000 $725.000 $874.200 $825.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 500.000 $50.000 $50.000 $145.000 $60.000 $125.000
CEM STABIL BKFL
CY 126.000 $190.000 $160.000 $285.000 $715.120 $267.500
TEMPORARY SPL SHORING
SF 5,451.000 $15.000 $35.000 $43.940 $67.650 $37.450
CONC STR REPAIR (EPOXY MORTAR)
SF 25.000 $150.000 $130.000 $176.000 $430.080 $214.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 25.000 $140.000 $160.000 $197.000 $430.080 $214.000
RIPRAP (CONC)(5 IN)
CY 85.000 $590.000 $550.000 $745.000 $1,415.680 $529.650
RIPRAP (MOW STRIP)(4 IN)
CY 495.000 $490.000 $500.000 $890.000 $896.000 $856.000
GABIONS (PVC)( 3FT X 3 FT)
CY 16.000 $544.000 $600.000 $1,360.000 $1,120.000 $749.000
GABIONS (3FT X 1.5FT)(PVC)
CY 8.000 $580.000 $900.000 $1,490.000 $896.000 $347.750
CMP (GAL STL 24 IN)
LF 4.000 $90.000 $158.000 $350.000 $761.600 $96.300
CONC BOX CULV (3 FT X 2 FT)
LF 340.000 $262.000 $190.000 $400.000 $411.820 $330.500
CONC BOX CULV (3 FT X 3 FT)
LF 65.000 $175.000 $195.000 $625.000 $568.290 $436.220
CONC BOX CULV (4 FT X 2 FT)
LF 750.000 $200.000 $200.000 $425.000 $523.820 $332.170
CONC BOX CULV (4 FT X 4 FT)
LF 2,318.000 $280.000 $260.000 $400.000 $443.790 $454.750
CONC BOX CULV (5 FT X 5 FT)
LF 1,806.000 $320.000 $320.000 $550.000 $553.200 $551.050
CONC BOX CULV (6 FT X 4 FT)
LF 567.000 $320.000 $350.000 $700.000 $635.920 $598.130
CONC BOX CULV (6 FT X 6 FT)
LF 385.000 $950.000 $400.000 $750.000 $841.640 $700.230
CONC BOX CULV (7 FT X 3 FT)
LF 81.000 $386.000 $400.000 $1,100.000 $2,182.100 $758.930
CONC BOX CULV (10 FT X 6 FT)
LF 318.000 $1,200.000 $1,000.000 $1,120.000 $1,382.430 $1,274.710
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 153.000 $550.000 $390.000 $552.000 $908.770 $561.750
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 261.000 $350.000 $420.000 $560.000 $1,095.810 $615.250
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 47.000 $420.000 $460.000 $637.000 $947.860 $593.850
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 131.000 $450.000 $470.000 $851.000 $1,095.140 $668.750
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 73.000 $580.000 $500.000 $773.000 $1,239.950 $749.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 8.000 $550.000 $520.000 $1,110.000 $1,856.960 $1,605.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 181.000 $450.000 $530.000 $827.000 $1,218.220 $775.750
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 40.000 $450.000 $630.000 $1,267.000 $1,947.340 $775.750
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
LF 88.000 $385.000 $525.000 $1,067.000 $1,596.000 $775.750
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
LF 125.000 $1,100.000 $555.000 $1,025.000 $1,981.950 $786.450
WINGWALL (PW - 1) (HW=7 FT)
EA 1.000 $15,000.000 $25,000.000 $44,360.000 $47,443.200 $40,595.800
SET (TY I)(S=10 FT)(HW=7FT)(4:1)(C)
EA 12.000 $9,500.000 $20,000.000 $15,857.000 $24,326.400 $10,643.290
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
EA 31.000 $5,500.000 $5,500.000 $4,283.000 $4,995.200 $5,150.120
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 4.000 $5,600.000 $7,400.000 $3,511.000 $7,817.600 $5,692.400
SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(C)
EA 28.000 $6,500.000 $5,500.000 $6,122.000 $6,507.200 $5,795.760
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (C)
EA 28.000 $7,000.000 $5,600.000 $3,910.000 $9,150.400 $5,205.550
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $5,670.000 $8,900.000 $8,450.000 $9,844.800 $6,366.500
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (C)
EA 14.000 $7,000.000 $5,800.000 $7,800.000 $10,640.000 $6,099.860
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (P)
EA 2.000 $6,600.000 $5,900.000 $10,000.000 $9,844.800 $7,931.910
SET (TY I)(S= 4 FT)(HW= 5 FT)(6:1) (C)
EA 82.000 $6,910.000 $8,600.000 $6,500.000 $11,244.800 $5,385.310
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (C)
EA 4.000 $8,550.000 $9,300.000 $7,200.000 $9,475.200 $6,773.960
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)
EA 24.000 $8,500.000 $11,000.000 $7,200.000 $11,401.600 $6,754.480
SET (TY I)(S= 5 FT)(HW= 6 FT)(6:1) (C)
EA 30.000 $12,400.000 $12,000.000 $11,000.000 $17,024.000 $8,396.290
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (C)
EA 16.000 $7,600.000 $8,000.000 $8,200.000 $8,276.800 $6,797.920
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
EA 9.000 $7,200.000 $9,200.000 $5,200.000 $7,660.800 $6,159.780
SET (TY I)(S= 6 FT)(HW= 5 FT)(6:1) (C)
EA 9.000 $10,000.000 $14,700.000 $9,800.000 $14,828.800 $8,243.490
SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1) (C)
EA 15.000 $12,000.000 $14,000.000 $12,500.000 $17,080.000 $9,061.400
SET (TY I)(S= 7 FT)(HW= 4 FT)(6:1) (C)
EA 10.000 $14,300.000 $14,000.000 $12,000.000 $15,948.800 $8,441.230
SET (TY I)(S= 8 FT)(HW= 5 FT)(6:1) (C)
EA 14.000 $26,000.000 $16,600.000 $11,500.000 $17,617.600 $9,094.360
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 6.000 $4,410.000 $2,200.000 $3,000.000 $2,508.800 $1,872.500
CLEAN EXIST CULVERTS
EA 51.000 $1,700.000 $1,800.000 $3,700.000 $4,200.000 $1,808.300
REMOV STR (BOX CULVERT)
LF 3,613.000 $55.000 $50.000 $128.000 $11.200 $69.550
MOBILIZATION
LS 1.000 $3,219,144.990 $3,640,858.680 $5,000,000.000 $3,433,393.810 $5,260,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 40.000 $12,000.000 $9,000.000 $5,000.000 $24,886.570 $25,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 255.000 $17.000 $33.000 $27.500 $28.000 $25.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 17,932.000 $5.100 $8.000 $7.000 $5.600 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 17,932.000 $1.000 $1.280 $0.500 $2.240 $7.000
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
LF 10,560.000 $35.000 $180.000 $20.000 $60.640 $123.170
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
LF 498,940.000 $8.000 $7.000 $2.700 $4.940 $7.520
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
LF 10,560.000 $12.000 $4.000 $4.000 $7.200 $39.320
RUMBLE STRIPS (SHOULDER)
LF 320,915.000 $0.130 $0.100 $0.150 $0.100 $0.130
RUMBLE STRIPS (CENTERLINE)
LF 152,633.000 $0.180 $0.100 $0.150 $0.100 $0.190
MTL W-BEAM GD FEN (STEEL POST)
LF 9,625.000 $23.000 $35.000 $37.500 $33.600 $32.100
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 25.000 $1,290.000 $1,700.000 $2,000.000 $1,853.600 $1,765.500
REMOVE METAL BEAM GUARD FENCE
LF 7,414.000 $3.750 $7.000 $6.250 $4.480 $4.280
GUARDRAIL END TREATMENT (INSTALL)
EA 25.000 $2,500.000 $3,500.000 $4,200.000 $3,956.000 $3,745.000
CRASH CUSH ATTEN (INSTL)
EA 2.000 $10,000.000 $16,000.000 $8,500.000 $25,200.000 $23,831.040
CRASH CUSH ATTEN (MOVE & RESET)
EA 94.000 $2,000.000 $2,600.000 $680.000 $560.000 $63.390
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,200.000 $1,600.000 $430.000 $1,200.000 $2,978.880
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 105.000 $756.000 $520.000 $1,050.000 $1,008.000 $898.800
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $874.000 $700.000 $1,100.000 $1,120.000 $946.950
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $994.000 $800.000 $1,400.000 $1,232.000 $1,177.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 2.000 $750.000 $700.000 $1,300.000 $1,176.000 $1,048.600
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 26.000 $975.000 $700.000 $1,300.000 $2,488.000 $1,112.800
REMOVE SM RD SN SUP&AM
EA 96.000 $78.000 $100.000 $100.000 $140.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 94.000 $142.000 $40.000 $120.000 $192.000 $101.650
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 94.000 $142.000 $100.000 $120.000 $168.000 $101.650
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 28.000 $47.000 $100.000 $35.000 $44.800 $42.800
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 28,748.000 $4.000 $4.000 $8.000 $3.700 $5.660
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 24,495.000 $4.000 $4.000 $8.000 $3.700 $5.660
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 1,149,630.000 $0.500 $0.110 $0.500 $0.110 $0.310
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 979,536.000 $0.500 $0.110 $0.500 $0.110 $0.310
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 467,649.000 $1.150 $1.250 $2.000 $1.680 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 341,737.000 $1.700 $1.250 $2.000 $1.710 $1.500
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 1,582.000 $1.120 $0.700 $1.000 $0.540 $1.070
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,843.000 $0.650 $1.100 $0.950 $1.060 $0.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 97.000 $8.400 $6.000 $22.000 $5.320 $19.260
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 3,330.000 $0.750 $0.600 $1.800 $0.540 $1.610
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 324,789.000 $0.250 $0.600 $0.600 $0.540 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 343,273.000 $0.260 $0.600 $0.600 $0.540 $0.500
PREFAB PAV MRK TY C (W) (ARROW)
EA 5.000 $210.000 $300.000 $274.000 $226.240 $235.400
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 26.000 $442.000 $675.000 $470.000 $672.000 $401.250
PREFAB PAV MRK TY C (W) (WORD)
EA 4.000 $271.200 $300.000 $312.000 $291.200 $267.500
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 6.000 $31.000 $40.000 $6.250 $34.720 $5.350
REFL PAV MRKR TY I-C
EA 1,919.000 $2.900 $3.500 $4.000 $3.420 $3.480
REFL PAV MRKR TY II-A-A
EA 4,320.000 $2.600 $3.500 $3.500 $0.450 $2.940
ELIM EXT PAV MRK & MRKS (4")
LF 653,500.000 $0.500 $0.500 $0.800 $0.450 $0.700
TEMP TRAF SIGNALS
EA 2.000 $50,000.000 $90,000.000 $30,000.000 $51,072.000 $97,370.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $13,000.000 $20,000.000 $25,000.000 $19,040.000 $21,000.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $7,500.000 $12,000.000 $10,000.000 $19,040.000 $15,400.000
TMA (STATIONARY)
EA 2.000 $20,000.000 $12,000.000 $140,000.000 $44,800.000 $28,000.000
TMA (MOBILE OPERATION)
HR 912.000 $52.000 $100.000 $70.000 $106.400 $70.000
Totals: $46,872,978.880 $48,936,556.300 $50,997,602.370 $54,256,401.410 $65,986,734.520