PREPARING ROW
|
STA
|
16.500
|
$2,000.000
|
$2,870.000
|
$690.000
|
$1,260.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
178.600
|
$20.000
|
$14.000
|
$20.500
|
$17.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
72.000
|
$9.000
|
$6.000
|
$8.500
|
$17.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
84.800
|
$100.000
|
$16.000
|
$18.000
|
$56.000
|
|
|
REMOVE CONC (RAIL)
|
LF
|
10.000
|
$120.000
|
$30.000
|
$155.000
|
$115.000
|
|
|
OBLITERATING ABANDONED ROAD
|
STA
|
18.100
|
$1,200.000
|
$3,000.000
|
$955.000
|
$1,200.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,369.000
|
$12.000
|
$10.000
|
$9.600
|
$9.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
234.020
|
$700.000
|
$450.000
|
$245.000
|
$480.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
512.000
|
$18.000
|
$12.000
|
$22.000
|
$13.000
|
|
|
BACKFILL (TY B)
|
STA
|
703.750
|
$120.000
|
$200.000
|
$84.500
|
$136.500
|
|
|
BLADING
|
STA
|
727.660
|
$80.000
|
$160.000
|
$68.000
|
$132.500
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
49.400
|
$400.000
|
$500.000
|
$370.000
|
$450.000
|
|
|
SPRINKLING (HOT PAVMT)
|
MG
|
25.000
|
$50.000
|
$100.000
|
$130.000
|
$72.000
|
|
|
FL BS (CMP IN PLC)(TY E GR 4) (6")
|
SY
|
20,045.000
|
$10.000
|
$10.000
|
$8.450
|
$9.900
|
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
|
CY
|
4,253.000
|
$15.000
|
$15.000
|
$22.500
|
$18.300
|
|
|
REWORK BS MTL (TY B) (6") (DENS CONT)
|
SY
|
2,150.000
|
$20.000
|
$7.000
|
$9.500
|
$16.950
|
|
|
REWORK BS MTL (TY B)(12")(DENS CONT)
|
SY
|
9,910.000
|
$20.000
|
$12.000
|
$6.800
|
$7.000
|
|
|
CEMENT
|
TON
|
3,222.970
|
$150.000
|
$150.000
|
$180.000
|
$152.150
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
286,484.860
|
$2.900
|
$2.500
|
$2.900
|
$2.700
|
|
|
PRIME COAT (MC-30)
|
GAL
|
57,729.000
|
$3.700
|
$4.000
|
$4.000
|
$3.750
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
31,082.000
|
$3.000
|
$3.500
|
$3.450
|
$3.800
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
27,606.000
|
$3.000
|
$3.250
|
$3.650
|
$3.800
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
18,043.000
|
$3.500
|
$3.920
|
$4.300
|
$4.650
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
410.000
|
$140.000
|
$140.000
|
$180.000
|
$156.000
|
|
|
D-GR HMA(SQ) TY-D SAC-B PG70-28
|
TON
|
591.000
|
$150.000
|
$95.000
|
$275.000
|
$166.500
|
|
|
D-GR HMA TY-C SAC-A, PG70-28
|
TON
|
10,898.010
|
$85.000
|
$97.500
|
$100.000
|
$101.500
|
|
|
D-GR HMA TY-B PG70-28
|
TON
|
98,943.000
|
$80.000
|
$95.000
|
$102.000
|
$105.150
|
|
|
D-GR HMA TY-D PG70-28 (LEVEL-UP)
|
TON
|
6,127.230
|
$95.000
|
$95.000
|
$135.000
|
$113.400
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG70-28
|
TON
|
33,587.650
|
$115.000
|
$120.000
|
$135.000
|
$139.250
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
1,306.000
|
$50.000
|
$40.000
|
$105.000
|
$72.900
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
277,432.030
|
$1.200
|
$2.960
|
$1.300
|
$1.600
|
|
|
PLANE ASPH CONC PAV (3")
|
SY
|
222,109.030
|
$1.700
|
$3.680
|
$3.450
|
$1.650
|
|
|
PLANE ASPH CONC PAV (6")
|
SY
|
45,115.270
|
$4.500
|
$5.900
|
$3.850
|
$4.250
|
|
|
CEM STABIL BKFL
|
CY
|
150.400
|
$200.000
|
$100.000
|
$265.000
|
$225.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
165.000
|
$10.000
|
$10.000
|
$10.500
|
$47.400
|
|
|
CL C CONC (RETAINING WALL)
|
CY
|
1.300
|
$1,000.000
|
$1,000.000
|
$1,600.000
|
$1,615.000
|
|
|
RIPRAP (CONC) (CL A )
|
CY
|
89.710
|
$700.000
|
$500.000
|
$525.000
|
$702.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
8.000
|
$200.000
|
$150.000
|
$84.000
|
$257.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
25.830
|
$200.000
|
$225.000
|
$445.000
|
$1,045.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
495.000
|
$400.000
|
$350.000
|
$515.000
|
$545.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
404.000
|
$150.000
|
$175.000
|
$105.000
|
$230.000
|
|
|
INLET (COMPL)(TY A)
|
EA
|
1.000
|
$2,000.000
|
$3,000.000
|
$1,600.000
|
$3,175.000
|
|
|
INLET (COMPL)(TY B)
|
EA
|
1.000
|
$1,000.000
|
$3,500.000
|
$2,300.000
|
$3,575.000
|
|
|
SET (REPLACE PIPE RUNNER ASSEMBLY)
|
EA
|
3.000
|
$1,000.000
|
$1,500.000
|
$2,100.000
|
$4,000.000
|
|
|
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
|
EA
|
3.000
|
$6,000.000
|
$10,000.000
|
$9,700.000
|
$9,660.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
3.000
|
$9,000.000
|
$8,000.000
|
$6,000.000
|
$9,680.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
3.000
|
$11,000.000
|
$8,500.000
|
$6,600.000
|
$10,435.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$1,700.000
|
$1,500.000
|
$1,500.000
|
$2,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
13.000
|
$1,700.000
|
$2,500.000
|
$1,500.000
|
$3,670.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
13.000
|
$2,000.000
|
$1,000.000
|
$2,600.000
|
$1,840.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
1.000
|
$15,000.000
|
$5,000.000
|
$16,000.000
|
$41,000.000
|
|
|
REMOV STR (PIPE)
|
EA
|
4.000
|
$1,000.000
|
$1,700.000
|
$475.000
|
$2,300.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,000,000.000
|
$2,000,000.000
|
$1,350,000.000
|
$2,028,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$8,000.000
|
$5,000.000
|
$25,500.000
|
$18,530.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
111.110
|
$40.000
|
$50.000
|
$31.500
|
$42.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
111.110
|
$10.000
|
$10.000
|
$10.500
|
$7.400
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
2,090.000
|
$10.000
|
$8.000
|
$5.000
|
$14.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,064.000
|
$10.000
|
$5.000
|
$5.200
|
$7.850
|
|
|
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
|
LF
|
640.000
|
$35.000
|
$55.000
|
$62.500
|
$103.000
|
|
|
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
640.000
|
$15.000
|
$10.000
|
$13.000
|
$9.150
|
|
|
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
640.000
|
$15.000
|
$10.000
|
$26.000
|
$16.800
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
72.000
|
$40.000
|
$55.000
|
$58.000
|
$41.900
|
|
|
DRIVEWAYS (CONC)
|
SY
|
312.900
|
$100.000
|
$65.000
|
$100.000
|
$84.200
|
|
|
DRIVEWAYS (ACP)
|
SY
|
6,703.000
|
$20.000
|
$55.000
|
$42.000
|
$37.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
99,377.000
|
$0.200
|
$0.250
|
$0.170
|
$0.100
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
112.500
|
$30.000
|
$30.000
|
$33.500
|
$33.750
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$2,000.000
|
$2,100.000
|
$2,500.000
|
$2,530.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,500.000
|
$500.000
|
$1,400.000
|
$1,450.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
150.000
|
$3.000
|
$5.000
|
$4.200
|
$4.200
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
1.000
|
$300.000
|
$250.000
|
$420.000
|
$421.500
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$300.000
|
$500.000
|
$420.000
|
$421.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,000.000
|
$3,500.000
|
$3,300.000
|
$3,280.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$500.000
|
$600.000
|
$420.000
|
$421.500
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,200.000
|
$5,000.000
|
$1,600.000
|
$2,100.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,300.000
|
$5,000.000
|
$1,600.000
|
$1,100.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$12,000.000
|
$40,000.000
|
$10,500.000
|
$12,600.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
7.000
|
$200.000
|
$500.000
|
$195.000
|
$350.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
64.000
|
$800.000
|
$550.000
|
$535.000
|
$920.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
61.000
|
$500.000
|
$450.000
|
$430.000
|
$790.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
9.000
|
$100.000
|
$75.000
|
$73.500
|
$105.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)SRF
|
EA
|
3.000
|
$150.000
|
$60.000
|
$55.500
|
$158.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
|
EA
|
32.000
|
$150.000
|
$55.000
|
$55.500
|
$142.250
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
26.000
|
$150.000
|
$65.000
|
$63.000
|
$142.250
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
90.000
|
$20.000
|
$25.000
|
$21.000
|
$15.800
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
7.000
|
$150.000
|
$30.000
|
$21.000
|
$21.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
20,230.000
|
$0.200
|
$0.180
|
$0.160
|
$0.210
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
268,533.000
|
$0.200
|
$0.180
|
$0.160
|
$0.210
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
16,661.000
|
$0.600
|
$0.360
|
$0.320
|
$0.370
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
2,284.000
|
$0.200
|
$0.180
|
$0.160
|
$0.210
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
267,718.000
|
$0.200
|
$0.180
|
$0.160
|
$0.210
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
6,932.000
|
$1.500
|
$1.200
|
$1.050
|
$1.150
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,351.000
|
$1.500
|
$1.200
|
$1.050
|
$1.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
16,670.000
|
$1.200
|
$1.150
|
$1.000
|
$0.830
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
77,562.000
|
$0.500
|
$0.580
|
$0.510
|
$0.420
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
19,570.000
|
$0.700
|
$0.850
|
$0.740
|
$0.630
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,370.000
|
$0.500
|
$0.580
|
$0.510
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
78,662.000
|
$0.500
|
$0.600
|
$0.520
|
$0.420
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
175.000
|
$20.000
|
$15.890
|
$14.000
|
$21.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
72.000
|
$250.000
|
$242.650
|
$210.000
|
$370.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
327.000
|
$35.000
|
$20.020
|
$17.500
|
$36.900
|
|
REFL PAV MRKR TY I-C
|
EA
|
142.000
|
$3.500
|
$3.820
|
$3.300
|
$3.150
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
304.000
|
$3.500
|
$3.820
|
$3.300
|
$3.150
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,717.000
|
$3.500
|
$3.820
|
$3.300
|
$3.150
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
298,082.000
|
$0.500
|
$0.490
|
$0.420
|
$0.850
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
200.000
|
$1.500
|
$0.970
|
$0.840
|
$1.650
|
|
|
FULL - WIDTH MOWING
|
AC
|
438.320
|
$100.000
|
$250.000
|
$52.500
|
$57.700
|
|
|
LITTER REMOVAL
|
AC
|
438.320
|
$150.000
|
$75.000
|
$52.500
|
$29.000
|
|
|
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
|
SY
|
269,553.740
|
$5.500
|
$6.000
|
$5.350
|
$5.750
|
|
|
ASPH FOR REINF FAB (AC-20-5TR)
|
GAL
|
53,910.000
|
$3.500
|
$4.000
|
$3.600
|
$4.950
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$15,000.000
|
$8,900.000
|
$24,525.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
1.000
|
$12,000.000
|
$10,000.000
|
$10,500.000
|
$1,500.000
|
|
|
TMA (STATIONARY)
|
EA
|
3.000
|
$40,000.000
|
$12,000.000
|
$21,000.000
|
$55,500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$600.000
|
$1,000.000
|
$840.000
|
$565.000
|
|
Totals: |
$22,595,829.216
|
$25,525,377.957
|
$25,828,265.020
|
$27,023,880.745
|