PARMER US 60 (0168-01-030)

Items: 113

County: PARMER
Length: N/A
Highway: US 60
District: LUBBOCK
Control Number: 0168-01-030
DBE Goal: N/A
Project: NH 2019(611)
Guaranty: N/A
Time: 277 WORKING DAYS
Engineer's Estimate: $22,595,829.22
Date: 03/06/2019 (7 years ago)
Contract Number: N/A
Type: REHABILITATION OF EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$22,595,829.22
Over/Under Est: 12.96% $2,929,548.72
$25,828,264.97
Over/Under Est: 14.31% $3,232,435.75
Amt Left: 1.19% $302,887.03
$27,023,880.68
Over/Under Est: 19.6% $4,428,051.46
Amt Left: 5.87% $1,498,502.74
Delta: -4.63% -$1,195,615.71
Subcontractor Percentage Amount
INDUSTRIAL FABRICS, INC. 5.71% $1,454,919.76
HERITAGE MATERIALS, LLC 3.80% $968,247.83
K. L. DURHAM CONSTRUCTION, L.L.C. 2.22% $565,660.57
DTM TRUCKING, INC. 2.14% $545,276.41
PMI PAVEMENT MARKING, LLC 1.73% $440,807.56
FLAT LINE, INC. 1.69% $430,615.48
EAGLE CONSTRUCTION LLC 1.57% $400,039.23
TEXOP CONSTRUCTION 1.18% $300,666.43
BARRICADES UNLIMITED 1.17% $298,118.41
H & F TRUCKING 0.36% $91,728.74
MARCOM'S MOWING SERVICE, LLC 0.25% $63,700.51
LMN TRANSPORT 0.20% $50,960.41
BUTCH'S RAT HOLE & ANCHOR SERVICE, INC. 0.18% $45,864.37
HJC FARMS, INC. 0.08% $20,384.16
J. H. ODEN CONTRACTING COMPANY 0.07% $17,836.14
FC TRAFFIC CONTROL, INC. 0.06% $15,288.12
BLACKTOP INDUSTRIES LLC 0.05% $12,740.10
BIG R TRUCKING TX LLC 0.00% $0.00
TRP CONSTRUCTION GROUP, LLC 0.00% $0.00
Total: 22.46% $5,722,854.23

Bid Items & Bid Tabulations

113 Total 0 of 113
PARMER  |  US 60  |  LUBBOCK  |  0168-01-030  |  03/06/2019  |  $22,595,829.22  |  NH 2019(611)  |  REHAB OF EXIST ROADWAY  |  277 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
DUININCK, INC.
J. LEE MILLIGAN, INC.
PREPARING ROW
STA 16.500 $2,000.000 $2,870.000 $690.000 $1,260.000
REMOVING CONC (DRIVEWAYS)
SY 178.600 $20.000 $14.000 $20.500 $17.000
REMOVING CONC (CURB AND GUTTER)
LF 72.000 $9.000 $6.000 $8.500 $17.000
REMOVING CONC (MISC)
SY 84.800 $100.000 $16.000 $18.000 $56.000
REMOVE CONC (RAIL)
LF 10.000 $120.000 $30.000 $155.000 $115.000
OBLITERATING ABANDONED ROAD
STA 18.100 $1,200.000 $3,000.000 $955.000 $1,200.000
EXCAVATION (ROADWAY)
CY 3,369.000 $12.000 $10.000 $9.600 $9.000
SUBGRADE WIDENING (DENS CONT)
STA 234.020 $700.000 $450.000 $245.000 $480.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 512.000 $18.000 $12.000 $22.000 $13.000
BACKFILL (TY B)
STA 703.750 $120.000 $200.000 $84.500 $136.500
BLADING
STA 727.660 $80.000 $160.000 $68.000 $132.500
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 49.400 $400.000 $500.000 $370.000 $450.000
SPRINKLING (HOT PAVMT)
MG 25.000 $50.000 $100.000 $130.000 $72.000
FL BS (CMP IN PLC)(TY E GR 4) (6")
SY 20,045.000 $10.000 $10.000 $8.450 $9.900
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
CY 4,253.000 $15.000 $15.000 $22.500 $18.300
REWORK BS MTL (TY B) (6") (DENS CONT)
SY 2,150.000 $20.000 $7.000 $9.500 $16.950
REWORK BS MTL (TY B)(12")(DENS CONT)
SY 9,910.000 $20.000 $12.000 $6.800 $7.000
CEMENT
TON 3,222.970 $150.000 $150.000 $180.000 $152.150
CEMENT TREAT(EXIST MATL)(8")
SY 286,484.860 $2.900 $2.500 $2.900 $2.700
PRIME COAT (MC-30)
GAL 57,729.000 $3.700 $4.000 $4.000 $3.750
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 31,082.000 $3.000 $3.500 $3.450 $3.800
FOG SEAL (CSS-1H)
GAL 27,606.000 $3.000 $3.250 $3.650 $3.800
ASPH (AC-20-5TR)
GAL 18,043.000 $3.500 $3.920 $4.300 $4.650
AGGR(TY-PB GR-4 SAC-B)
CY 410.000 $140.000 $140.000 $180.000 $156.000
D-GR HMA(SQ) TY-D SAC-B PG70-28
TON 591.000 $150.000 $95.000 $275.000 $166.500
D-GR HMA TY-C SAC-A, PG70-28
TON 10,898.010 $85.000 $97.500 $100.000 $101.500
D-GR HMA TY-B PG70-28
TON 98,943.000 $80.000 $95.000 $102.000 $105.150
D-GR HMA TY-D PG70-28 (LEVEL-UP)
TON 6,127.230 $95.000 $95.000 $135.000 $113.400
STONE-MTRX-ASPH SMA-D SAC-A PG70-28
TON 33,587.650 $115.000 $120.000 $135.000 $139.250
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 1,306.000 $50.000 $40.000 $105.000 $72.900
PLANE ASPH CONC PAV (2")
SY 277,432.030 $1.200 $2.960 $1.300 $1.600
PLANE ASPH CONC PAV (3")
SY 222,109.030 $1.700 $3.680 $3.450 $1.650
PLANE ASPH CONC PAV (6")
SY 45,115.270 $4.500 $5.900 $3.850 $4.250
CEM STABIL BKFL
CY 150.400 $200.000 $100.000 $265.000 $225.000
TRENCH EXCAVATION PROTECTION
LF 165.000 $10.000 $10.000 $10.500 $47.400
CL C CONC (RETAINING WALL)
CY 1.300 $1,000.000 $1,000.000 $1,600.000 $1,615.000
RIPRAP (CONC) (CL A )
CY 89.710 $700.000 $500.000 $525.000 $702.000
CMP (GAL STL 24 IN)
LF 8.000 $200.000 $150.000 $84.000 $257.000
CONC BOX CULV (3 FT X 2 FT)
LF 25.830 $200.000 $225.000 $445.000 $1,045.000
CONC BOX CULV (5 FT X 4 FT)
LF 495.000 $400.000 $350.000 $515.000 $545.000
RC PIPE (CL III)(24 IN)
LF 404.000 $150.000 $175.000 $105.000 $230.000
INLET (COMPL)(TY A)
EA 1.000 $2,000.000 $3,000.000 $1,600.000 $3,175.000
INLET (COMPL)(TY B)
EA 1.000 $1,000.000 $3,500.000 $2,300.000 $3,575.000
SET (REPLACE PIPE RUNNER ASSEMBLY)
EA 3.000 $1,000.000 $1,500.000 $2,100.000 $4,000.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
EA 3.000 $6,000.000 $10,000.000 $9,700.000 $9,660.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1) (C)
EA 3.000 $9,000.000 $8,000.000 $6,000.000 $9,680.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
EA 3.000 $11,000.000 $8,500.000 $6,600.000 $10,435.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 2.000 $1,700.000 $1,500.000 $1,500.000 $2,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 13.000 $1,700.000 $2,500.000 $1,500.000 $3,670.000
CLEAN EXIST CULVERTS
EA 13.000 $2,000.000 $1,000.000 $2,600.000 $1,840.000
REMOV STR (BOX CULVERT)
EA 1.000 $15,000.000 $5,000.000 $16,000.000 $41,000.000
REMOV STR (PIPE)
EA 4.000 $1,000.000 $1,700.000 $475.000 $2,300.000
MOBILIZATION
LS 1.000 $2,000,000.000 $2,000,000.000 $1,350,000.000 $2,028,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $8,000.000 $5,000.000 $25,500.000 $18,530.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 111.110 $40.000 $50.000 $31.500 $42.000
CONSTRUCTION EXITS (REMOVE)
SY 111.110 $10.000 $10.000 $10.500 $7.400
SANDBAGS FOR EROSION CONTROL
EA 2,090.000 $10.000 $8.000 $5.000 $14.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,064.000 $10.000 $5.000 $5.200 $7.850
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
LF 640.000 $35.000 $55.000 $62.500 $103.000
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
LF 640.000 $15.000 $10.000 $13.000 $9.150
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
LF 640.000 $15.000 $10.000 $26.000 $16.800
CONC CURB & GUTTER (TY II)
LF 72.000 $40.000 $55.000 $58.000 $41.900
DRIVEWAYS (CONC)
SY 312.900 $100.000 $65.000 $100.000 $84.200
DRIVEWAYS (ACP)
SY 6,703.000 $20.000 $55.000 $42.000 $37.000
RUMBLE STRIPS (SHOULDER)
LF 99,377.000 $0.200 $0.250 $0.170 $0.100
MTL W-BEAM GD FEN (STEEL POST)
LF 112.500 $30.000 $30.000 $33.500 $33.750
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $2,000.000 $2,100.000 $2,500.000 $2,530.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,500.000 $500.000 $1,400.000 $1,450.000
REMOVE METAL BEAM GUARD FENCE
LF 150.000 $3.000 $5.000 $4.200 $4.200
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $300.000 $250.000 $420.000 $421.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 1.000 $300.000 $500.000 $420.000 $421.500
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,000.000 $3,500.000 $3,300.000 $3,280.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $500.000 $600.000 $420.000 $421.500
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,200.000 $5,000.000 $1,600.000 $2,100.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,300.000 $5,000.000 $1,600.000 $1,100.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $12,000.000 $40,000.000 $10,500.000 $12,600.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 7.000 $200.000 $500.000 $195.000 $350.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 64.000 $800.000 $550.000 $535.000 $920.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 61.000 $500.000 $450.000 $430.000 $790.000
REMOVE SM RD SN SUP&AM
EA 9.000 $100.000 $75.000 $73.500 $105.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)SRF
EA 3.000 $150.000 $60.000 $55.500 $158.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
EA 32.000 $150.000 $55.000 $55.500 $142.250
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 26.000 $150.000 $65.000 $63.000 $142.250
REMOVE DELIN & OBJECT MARKER ASSMS
EA 90.000 $20.000 $25.000 $21.000 $15.800
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 7.000 $150.000 $30.000 $21.000 $21.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 20,230.000 $0.200 $0.180 $0.160 $0.210
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 268,533.000 $0.200 $0.180 $0.160 $0.210
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 16,661.000 $0.600 $0.360 $0.320 $0.370
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 2,284.000 $0.200 $0.180 $0.160 $0.210
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 267,718.000 $0.200 $0.180 $0.160 $0.210
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 6,932.000 $1.500 $1.200 $1.050 $1.150
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,351.000 $1.500 $1.200 $1.050 $1.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 16,670.000 $1.200 $1.150 $1.000 $0.830
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 77,562.000 $0.500 $0.580 $0.510 $0.420
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 19,570.000 $0.700 $0.850 $0.740 $0.630
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 2,370.000 $0.500 $0.580 $0.510 $0.420
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 78,662.000 $0.500 $0.600 $0.520 $0.420
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 175.000 $20.000 $15.890 $14.000 $21.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 72.000 $250.000 $242.650 $210.000 $370.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 327.000 $35.000 $20.020 $17.500 $36.900
REFL PAV MRKR TY I-C
EA 142.000 $3.500 $3.820 $3.300 $3.150
REFL PAV MRKR TY II-A-A
EA 304.000 $3.500 $3.820 $3.300 $3.150
REFL PAV MRKR TY II-C-R
EA 1,717.000 $3.500 $3.820 $3.300 $3.150
ELIM EXT PAV MRK & MRKS (4")
LF 298,082.000 $0.500 $0.490 $0.420 $0.850
ELIM EXT PAV MRK & MRKS (8")
LF 200.000 $1.500 $0.970 $0.840 $1.650
FULL - WIDTH MOWING
AC 438.320 $100.000 $250.000 $52.500 $57.700
LITTER REMOVAL
AC 438.320 $150.000 $75.000 $52.500 $29.000
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
SY 269,553.740 $5.500 $6.000 $5.350 $5.750
ASPH FOR REINF FAB (AC-20-5TR)
GAL 53,910.000 $3.500 $4.000 $3.600 $4.950
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $15,000.000 $8,900.000 $24,525.000
TMSP RADAR SPEED CONTROL MONITOR
EA 1.000 $12,000.000 $10,000.000 $10,500.000 $1,500.000
TMA (STATIONARY)
EA 3.000 $40,000.000 $12,000.000 $21,000.000 $55,500.000
TMA (MOBILE OPERATION)
DAY 30.000 $600.000 $1,000.000 $840.000 $565.000
Totals: $22,595,829.216 $25,525,377.957 $25,828,265.020 $27,023,880.745