Show Job Controls
Bid Cobra

PARMER US 70 (0052-01-044)

Items: 72

County: PARMER
Length: N/A
Highway: US 70
District: LUBBOCK
Control Number: 0052-01-044
DBE Goal: N/A
Project: NH 2021(294)
Guaranty: N/A
Time: 118 WORKING DAYS
Engineer's Estimate: $2,729,420.95
Date: 01/08/2021 (5 years ago)
Contract Number: N/A
Type: REHABILITATION OF EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$2,729,420.95
$3,220,733.82
Over/Under Est: 18% $491,312.87
$3,379,503.31
Over/Under Est: 23.82% $650,082.36
Amt Left: 4.93% $158,769.49
$3,648,499.72
Over/Under Est: 33.67% $919,078.77
Amt Left: 13.28% $427,765.90
Delta: -7.96% -$268,996.41
$3,752,393.23
Over/Under Est: 37.48% $1,022,972.28
Amt Left: 16.51% $531,659.41
Delta: -2.85% -$103,893.51

Bid Items & Bid Tabulations

72 Total 0 of 72
PARMER  |  US 70  |  LUBBOCK  |  0052-01-044  |  01/08/2021  |  $2,729,420.95  |  NH 2021(294)  |  REHAB OF EXIST ROADWAY  |  118 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GILVIN-TERRILL, LTD.
DUININCK, INC.
J. LEE MILLIGAN, INC.
A. L. HELMCAMP, INC.
PREPARING ROW
STA 21.000 $2,000.000 $850.000 $580.000 $10,000.000 $8,000.000
REMOVING CONC (CURB AND GUTTER)
LF 385.000 $6.000 $15.000 $7.750 $5.500 $17.000
RMV TRT & UNTRT BS & APSH PV (10"-12")
STA 10.800 $2,500.000 $4,000.000 $2,300.000 $4,400.000 $6,000.000
EXCAVATION (ROADWAY)
CY 24,487.000 $10.000 $5.600 $10.500 $14.950 $18.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 7,169.000 $12.000 $6.000 $24.000 $19.750 $12.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 9.450 $400.000 $500.000 $450.000 $445.000 $420.000
FL BS (CMP IN PLC)(TY A GR 4)(4")
SY 12,623.890 $10.000 $18.000 $12.500 $10.950 $15.000
REWORK BS MTL (TY B)(18")(DENS CONT)
STA 37.500 $1,800.000 $3,600.000 $7,300.000 $3,510.000 $2,000.000
REWORK BS MTL (TY B)(10''-12'')(DC)
STA 36.860 $1,200.000 $3,600.000 $4,900.000 $3,675.000 $1,500.000
CEMENT
TON 257.980 $150.000 $175.000 $215.000 $176.650 $200.000
CEMENT TREAT (EXIST MATL)(DC)(8")
SY 13,158.000 $3.000 $6.500 $4.100 $3.100 $5.000
CEMENT TREAT (EXIST MATL)(DC)(6")
SY 13,031.110 $2.500 $4.000 $2.700 $3.150 $5.000
PRIME COAT (MC-30)
GAL 5,155.000 $5.000 $4.000 $5.200 $3.950 $5.000
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 5,943.000 $5.000 $5.000 $3.400 $3.950 $4.000
FOG SEAL (CSS-1H)
GAL 4,863.000 $5.000 $5.000 $3.500 $4.250 $4.000
ASPH (AC-20-5TR)
GAL 28,474.000 $4.000 $3.500 $3.900 $3.650 $4.000
AGGR(TY-PB GR-3 SAC-B)
CY 152.000 $130.000 $165.000 $195.000 $157.000 $275.000
AGGR(TY-PB GR-4 SAC-B)
CY 521.000 $130.000 $165.000 $115.000 $182.000 $200.000
D-GR HMA(SQ) TY-C SAC-A PG70-28
TON 1,475.800 $150.000 $125.000 $135.000 $125.400 $160.000
D-GR HMA(SQ) TY-B PG70-28
TON 2,951.590 $150.000 $125.000 $130.000 $124.000 $140.000
TACK COAT
GAL 3,593.000 $3.000 $7.000 $2.950 $4.100 $5.000
PLANE ASPH CONC PAV (2")
SY 10,646.670 $4.000 $3.500 $2.700 $4.800 $4.000
CEM STABIL BKFL
CY 24.400 $300.000 $250.000 $335.000 $315.000 $315.000
FLOWABLE BACKFILL
CY 550.000 $200.000 $300.000 $335.000 $285.000 $315.000
RIPRAP (CONC)(CL B)
CY 7.600 $600.000 $2,500.000 $730.000 $920.000 $680.000
CONC BOX CULV (5 FT X 4 FT)
LF 258.000 $400.000 $750.000 $675.000 $645.000 $630.000
RC PIPE (CL IV)(24 IN)
LF 128.000 $150.000 $175.000 $170.000 $158.000 $160.000
WINGWALL (FW - 0) (HW=5 FT)
EA 2.000 $10,000.000 $26,000.000 $10,500.000 $12,000.000 $9,870.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $1,500.000 $3,000.000 $1,300.000 $2,800.000 $1,260.000
REMOV STR (PIPE)
EA 1.000 $500.000 $3,000.000 $335.000 $4,600.000 $315.000
MOBILIZATION
LS 1.000 $248,000.000 $290,000.000 $300,000.000 $364,500.000 $350,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $8,000.000 $7,000.000 $11,000.000 $15,000.000 $18,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 111.110 $35.000 $25.000 $55.500 $46.000 $20.000
CONSTRUCTION EXITS (REMOVE)
SY 111.110 $10.000 $22.000 $39.500 $5.850 $5.000
SANDBAGS FOR EROSION CONTROL
EA 260.000 $10.000 $25.000 $20.500 $22.000 $15.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 810.000 $10.000 $14.000 $11.000 $9.000 $6.000
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
LF 1,560.000 $50.000 $90.000 $38.500 $75.500 $45.000
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
LF 1,560.000 $20.000 $15.000 $8.000 $15.400 $10.000
DRIVEWAYS (SURF TREAT)
SY 396.000 $30.000 $70.000 $38.500 $27.350 $40.000
INTERSECTIONS (ACP) (TYPE 1)
SY 961.000 $60.000 $100.000 $86.000 $76.200 $75.000
INTERSECTIONS (ACP) (TYPE 2)
SY 332.000 $50.000 $95.000 $105.000 $93.500 $100.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $900.000 $2,000.000 $1,700.000 $2,400.000 $2,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $13,000.000 $10,000.000 $9,000.000 $9,700.000 $15,000.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 6.000 $190.000 $250.000 $230.000 $575.000 $215.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 32.000 $600.000 $775.000 $810.000 $670.000 $750.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $450.000 $675.000 $785.000 $520.000 $740.000
REMOVE SM RD SN SUP&AM
EA 13.000 $100.000 $100.000 $140.000 $125.000 $130.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 6.000 $100.000 $150.000 $90.000 $220.000 $85.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 4.000 $85.000 $150.000 $90.000 $225.000 $85.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 2,235.000 $0.400 $0.300 $0.340 $0.290 $0.320
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 13,850.000 $0.400 $0.300 $0.340 $0.290 $0.320
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,627.000 $0.600 $0.600 $0.670 $0.580 $0.630
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 18,330.000 $0.400 $0.300 $0.340 $0.290 $0.320
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 778.000 $1.500 $5.000 $1.400 $1.200 $0.720
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 311.000 $1.500 $5.000 $1.400 $1.250 $0.720
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,627.000 $1.000 $0.840 $0.940 $0.930 $0.880
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 18,142.000 $0.500 $0.430 $0.480 $0.480 $0.450
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 2,480.000 $0.700 $0.700 $0.790 $0.780 $0.740
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 840.000 $0.500 $0.500 $0.560 $0.560 $0.530
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 11,272.000 $0.500 $0.430 $0.480 $0.480 $0.450
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 94.000 $23.000 $21.000 $23.500 $23.350 $22.050
PREFAB PAV MRK TY C (W) (ARROW)
EA 10.000 $250.000 $325.000 $365.000 $360.000 $341.250
PREFAB PAV MRK TY C (W) (RR XING)
EA 1.000 $600.000 $850.000 $955.000 $945.000 $892.500
REFL PAV MRKR TY II-A-A
EA 64.000 $3.500 $10.000 $11.000 $11.100 $10.500
REFL PAV MRKR TY II-C-R
EA 263.000 $3.700 $5.000 $5.600 $5.550 $5.250
ELIM EXT PAV MRK & MRKS (4")
LF 23,243.000 $0.500 $1.500 $0.840 $0.850 $2.000
FULL - WIDTH MOWING
AC 18.900 $80.000 $200.000 $56.000 $270.000 $400.000
LITTER REMOVAL
AC 25.330 $45.000 $150.000 $45.000 $265.000 $150.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $15,000.000 $11,000.000 $21,000.000 $25,000.000
TMA (STATIONARY)
DAY 220.000 $200.000 $150.000 $280.000 $480.000 $500.000
TMA (MOBILE OPERATION)
DAY 21.000 $200.000 $950.000 $900.000 $85.000 $1,000.000
TEMP SPEED MONITOR SYS
EA 1.000 $12,000.000 $12,000.000 $11,000.000 $12,550.000 $6,000.000
Totals: $2,729,420.955 $3,220,733.825 $3,379,503.341 $3,648,499.748 $3,752,393.230