PARKER IH0020 (6375-03-001)

Items: 49

County: PARKER
Length: N/A
Highway: IH0020
District: FORT WORTH
Control Number: 6375-03-001
DBE Goal: N/A
Project: RMC - 637503001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,313,386.46
Date: 05/06/2021 (5 years ago)
Contract Number: N/A
Type: GUARDRAIL INSTALLATION AND REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$1,313,386.46
$1,119,924.00
Over/Under Est: -14.73% -$193,462.46
$1,188,544.00
Over/Under Est: -9.51% -$124,842.46
Amt Left: 6.13% $68,620.00
Over/Under Est: 5.29% $69,513.54
Amt Left: 23.48% $262,976.00
Delta: -16.35% -$194,356.00
$1,470,724.00
Over/Under Est: 11.98% $157,337.54
Amt Left: 31.32% $350,800.00
Delta: -6.35% -$87,824.00

Bid Items & Bid Tabulations

49 Total 0 of 49
PARKER  |  IH0020  |  FORT WORTH  |  6375-03-001  |  05/06/2021  |  $1,313,386.46  |  RMC - 637503001  |  GUARDRAIL INSTL AND REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ELITE CASTLE RESOURCES LLC
SHORT-LINE CORPORATION
SOUTHEAST HIGHWAY GUARDRAIL & ATTENUATORS, LLC
VANN/ELLI, INC.
MOBILIZATION (CALLOUT)
EA 24.000 $1,059.440 $1.000 $1.000 $200.000 $1.000
MOBILIZATION (EMERGENCY)
EA 5.000 $1,937.500 $1,000.000 $1,000.000 $500.000 $1,000.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 250.000 $71.700 $40.000 $25.000 $40.000 $24.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $2,178.130 $1,500.000 $2,000.000 $1,650.000 $2,300.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 25.000 $1,204.580 $1,000.000 $1,500.000 $900.000 $1,100.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 5.000 $36.350 $250.000 $200.000 $350.000 $75.000
REMOVE METAL BEAM GUARD FENCE
LF 200.000 $1.160 $5.000 $5.000 $3.000 $2.000
CABLE BARRIER TERMINAL SECTION (TL-3)
EA 4.000 $2,250.000 $2,500.000 $3,500.000 $3,500.000 $2,900.000
CABLE BARRIER TERMINAL SECTION (TL-4)
EA 4.000 $2,250.000 $2,500.000 $3,500.000 $3,500.000 $2,900.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $2,847.850 $3,000.000 $2,500.000 $2,400.000 $2,900.000
CRASH CUSH ATTEN (INSTL)
EA 1.000 $8,347.440 $5,000.000 $6,500.000 $2,000.000 $25,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $2,000.000 $2,500.000 $500.000 $500.000 $2,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 200.000 $22.220 $20.000 $50.000 $9.000 $20.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 15,000.000 $7.390 $10.000 $11.000 $9.000 $13.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 100.000 $32.060 $5.000 $30.000 $25.000 $25.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 50.000 $33.160 $5.000 $50.000 $30.000 $25.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 100.000 $24.170 $25.000 $20.000 $12.000 $30.000
RAISE RAIL ELEMENT
LF 2,500.000 $3.260 $3.000 $2.000 $8.000 $3.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 1,500.000 $39.750 $20.000 $30.000 $70.000 $45.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 50.000 $59.360 $200.000 $100.000 $70.000 $50.000
REALIGN POSTS
EA 250.000 $10.790 $20.000 $50.000 $7.000 $10.000
REMOVE & REPLACE BLOCKOUT
EA 800.000 $12.670 $50.000 $50.000 $30.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 2,000.000 $6.070 $15.000 $15.000 $17.000 $15.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 160.000 $9.700 $100.000 $30.000 $65.000 $60.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 60.000 $2,822.740 $4,850.000 $3,000.000 $2,500.000 $2,800.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 10.000 $1,134.690 $1,000.000 $500.000 $1,500.000 $700.000
REM & RESET SGT IMPACT HEAD
EA 5.000 $26.540 $200.000 $100.000 $100.000 $100.000
REPLACE SGT CABLE ASSEMBLY
EA 10.000 $29.730 $50.000 $100.000 $35.000 $20.000
REPLACE SGT CABLE ANCHOR
EA 5.000 $53.960 $50.000 $50.000 $35.000 $20.000
REPLACE SGT STRUT
EA 5.000 $54.860 $50.000 $50.000 $35.000 $20.000
REPLACE SGT OBJECT MARKER
EA 20.000 $21.720 $50.000 $1.000 $25.000 $40.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $249.570 $250.000 $200.000 $210.000 $325.000
REPLACE POSTS (TL-3)
EA 1,500.000 $163.170 $150.000 $150.000 $100.000 $150.000
REPLACE POSTS (TL-4)
EA 2,500.000 $107.630 $1.000 $100.000 $100.000 $140.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 5.000 $234.460 $250.000 $300.000 $135.000 $300.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 5.000 $52.290 $100.000 $50.000 $75.000 $50.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 10.000 $1,861.840 $3,500.000 $1,000.000 $2,500.000 $3,000.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 10.000 $1,377.150 $1,500.000 $1,000.000 $2,500.000 $3,000.000
REPLACE CABLE (TL-3)
LF 1,000.000 $4.100 $5.000 $1.000 $5.000 $3.000
CHECK / RE-TENSION CABLE
EA 25.000 $763.890 $3,500.000 $400.000 $1,000.000 $300.000
REPLACE POST HARDWARE (TL-4)
EA 2,500.000 $47.320 $1.000 $1.000 $100.000 $40.000
REP OR REPLC CAB BAR TM SEC TL-3(FURN)
EA 1.000 $500.000 $1,000.000 $100.000 $2,500.000 $1,800.000
REP OR REPLC CAB BAR TM SEC TL-4(FURN)
EA 1.000 $500.000 $1,000.000 $100.000 $2,500.000 $1,800.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 20.000 $50.100 $80.000 $50.000 $50.000 $50.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 200.000 $4.830 $8.000 $10.000 $3.000 $5.000
REPAIR (TRACC)
EA 2.000 $3,340.930 $5,000.000 $5,000.000 $3,000.000 $5,000.000
REPAIR (WIDE TRACC)
EA 4.000 $5,673.160 $2,500.000 $5,000.000 $4,000.000 $7,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 4.000 $73.840 $500.000 $200.000 $250.000 $175.000
TMA (STATIONARY)
EA 200.000 $121.060 $1.000 $1.000 $1.000 $80.000
Totals: $1,313,386.460 $1,119,924.000 $1,188,544.000 $1,382,900.000 $1,470,724.000