PARKER FM 3325 (3516-01-020)

Items: 84

County: PARKER
Length: 7.0500 MILES
Highway: FM 3325
District: FORT WORTH
Control Number: 3516-01-020
DBE Goal: 0.0%
Project: F 2026(350)
Guaranty: $100,000.00
Time: 116 WORKING DAYS
Engineer's Estimate: $10,552,188.50
Date: 01/06/2026 (5 months ago)
Contract Number: 1263031
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00206074
Contract Type: Federal
Project Description: FAILURE REPAIRS; MILL AND OVERLAY
Mail/Deliver Bids To: N/A
CHADWICK DABBS
DOUGLAS BATES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (9)
E
Engineer's Estimate
$10,552,188.50
$6,252,902.76
Over/Under Est: -40.74% -$4,299,285.74
Over/Under Est: -36.87% -$3,890,616.56
Amt Left: 6.54% $408,669.18
$6,804,349.46
Over/Under Est: -35.52% -$3,747,839.04
Amt Left: 8.82% $551,446.70
Delta: -2.14% -$142,777.52
$6,885,458.53
Over/Under Est: -34.75% -$3,666,729.97
Amt Left: 10.12% $632,555.77
Delta: -1.19% -$81,109.07
Over/Under Est: -34.37% -$3,626,675.50
Amt Left: 10.76% $672,610.24
Delta: -0.58% -$40,054.47
$7,294,915.07
Over/Under Est: -30.87% -$3,257,273.43
Amt Left: 16.66% $1,042,012.31
Delta: -5.33% -$369,402.07
Over/Under Est: -30.17% -$3,183,951.81
Amt Left: 17.84% $1,115,333.93
Delta: -1.01% -$73,321.62
Over/Under Est: -29.43% -$3,105,261.43
Amt Left: 19.1% $1,194,024.31
Delta: -1.07% -$78,690.38
Over/Under Est: -28.3% -$2,986,101.87
Amt Left: 21% $1,313,183.87
Delta: -1.60% -$119,159.56

Bid Items & Bid Tabulations

84 Total 0 of 84
PARKER  |  FM 3325  |  FORT WORTH  |  3516-01-020  |  01/06/2026  |  $10,552,188.50  |  F 2026(350)  |  REHAB EXIST ROADWAY  |  116 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
NORTHEASTERN PAVERS, LLC
FOUTSCO PAVING COMPANY, LLC
ZACK BURKETT CO.
JAGOE-PUBLIC COMPANY
AUSTIN BRIDGE & ROAD SERVICES, LP
OVERLAND CORPORATION
PEACHTREE CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
EUROVIA ATLANTIC COAST LLC
PREPARING ROW
STA 372.000 $1,000.000 $150.000 $125.000 $220.000 $75.000 $250.000 $100.000 $375.000 $278.000 $400.000
EMBANK (FNL)(OC)(TY B)
CY 7.000 $200.000 $225.000 $500.000 $100.000 $350.000 $1,200.000 $1,200.000 $245.000 $300.000 $200.000
BACKFILL (TY A)
STA 372.000 $400.000 $275.000 $150.000 $309.500 $260.000 $259.060 $295.000 $405.000 $292.000 $225.000
BLOCK SODDING
SY 962.000 $10.000 $8.000 $5.000 $6.160 $12.000 $10.000 $6.200 $7.500 $12.000 $14.000
VEGETATIVE WATERING
TGL 35.000 $100.000 $165.000 $100.000 $20.000 $90.000 $70.000 $355.000 $190.000 $70.000 $180.000
D-GR HMA TY-C SAC-B PG70-28
TON 20,331.000 $180.000 $105.000 $123.300 $112.000 $110.000 $105.000 $135.000 $138.700 $145.000 $120.000
D-GR HMA TY-C PG70-28 (LEVEL-UP)
TON 211.000 $180.000 $175.000 $230.000 $200.000 $150.000 $248.140 $145.000 $275.000 $150.000 $190.000
TACK COAT
GAL 35,351.000 $7.000 $0.010 $0.100 $4.200 $0.250 $0.010 $3.000 $1.000 $0.010 $3.000
TOM-C PG76-22 SAC-A
TON 10,176.000 $190.000 $160.000 $180.000 $155.000 $160.000 $175.000 $163.000 $159.200 $169.000 $185.000
TACK COAT
GAL 35,351.000 $5.000 $0.010 $0.010 $4.200 $0.250 $0.010 $4.000 $1.500 $0.010 $3.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 7,838.000 $80.000 $60.000 $70.000 $75.500 $60.000 $70.960 $80.000 $69.200 $68.000 $75.000
PLANE & TEXT ASPH CONC PAV(0" TO 1")
SY 176,696.000 $3.000 $2.000 $0.700 $1.960 $1.750 $1.590 $1.250 $1.950 $1.850 $1.880
RIPRAP (MOW STRIP)(4 IN)
CY 197.100 $700.000 $750.000 $600.000 $756.000 $800.000 $664.130 $607.500 $757.000 $800.000 $785.000
CLEANING AND SEALING EXISTING JOINTS
LF 80.000 $60.000 $200.000 $75.000 $106.400 $90.000 $75.000 $75.000 $216.000 $85.000 $75.000
MOBILIZATION
LS 1.000 $980,531.000 $575,000.000 $500,000.000 $526,848.000 $765,000.000 $761,806.430 $458,000.000 $500,000.000 $456,353.000 $620,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $12,000.000 $5,000.000 $40,000.000 $3,900.000 $7,000.000 $19,757.780 $8,000.000 $6,575.000 $9,000.000 $26,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $20,000.000 $12,000.000 $0.010 $20,000.000 $8,660.000 $9,900.000 $13,750.000 $10,500.000 $17,500.000
TMA (STATIONARY)
DAY 150.000 $300.000 $0.010 $1.000 $200.000 $100.000 $1.250 $192.000 $75.000 $1.000 $325.000
TMA (MOBILE OPERATION)
DAY 58.000 $450.000 $0.010 $1.000 $0.010 $100.000 $2.000 $95.000 $120.000 $1.000 $715.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,450.000 $4.000 $3.800 $0.500 $4.480 $3.000 $4.450 $3.550 $4.050 $4.750 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,450.000 $2.000 $1.650 $0.100 $1.120 $1.250 $1.000 $1.000 $1.750 $1.050 $1.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 1,608.000 $120.000 $0.010 $1.000 $0.010 $55.000 $43.410 $122.330 $66.500 $55.000 $45.000
ONE-WAY TRAF CONT (PILOT CAR)
HR 536.000 $150.000 $0.010 $1.000 $0.010 $300.000 $210.080 $55.000 $165.000 $185.000 $95.000
INTERSECTIONS (CONC)
SY 472.000 $200.000 $155.000 $140.000 $280.000 $200.000 $148.760 $140.830 $155.500 $155.000 $164.000
DRIVEWAYS (CONC)
SY 203.000 $110.000 $145.000 $230.000 $280.000 $200.000 $238.930 $229.710 $145.500 $146.000 $157.000
DRIVEWAYS (ACP)
SY 420.000 $85.000 $75.000 $50.000 $37.330 $180.000 $247.500 $225.000 $58.200 $85.000 $50.000
MTL W-BEAM GD FEN (TIM POST)
LF 2,787.500 $25.000 $25.000 $22.000 $28.560 $25.000 $20.250 $20.250 $21.900 $24.000 $22.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $2,050.000 $1,800.000 $2,548.000 $3,200.000 $1,625.000 $1,625.000 $1,725.000 $2,000.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 2,787.500 $40.000 $2.750 $2.000 $2.240 $2.500 $2.000 $2.000 $2.150 $2.700 $2.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $275.000 $225.000 $200.000 $224.000 $240.000 $200.000 $200.000 $216.000 $616.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 20.000 $3,400.000 $3,300.000 $3,000.000 $3,987.200 $3,500.000 $2,855.000 $2,855.000 $3,075.000 $3,191.000 $2,950.000
GUARDRAIL END TREATMENT (REMOVE)
EA 20.000 $450.000 $280.000 $250.000 $22.400 $240.000 $200.000 $200.000 $216.400 $270.000 $250.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BR)
EA 78.000 $90.000 $50.000 $45.000 $128.800 $110.000 $89.500 $45.000 $47.500 $49.000 $45.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 6.000 $40.000 $20.000 $20.000 $39.200 $29.000 $24.000 $24.000 $21.500 $21.750 $20.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 30.000 $125.000 $50.000 $45.000 $128.800 $110.000 $92.500 $45.000 $49.100 $47.000 $45.500
REMOVE DELIN & OBJECT MARKER ASSMS
EA 30.000 $55.000 $60.000 $5.000 $61.600 $37.000 $30.000 $50.960 $26.500 $27.000 $100.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 968.000 $1.000 $0.350 $0.220 $0.250 $0.300 $0.220 $0.350 $0.370 $0.230 $0.350
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 73,942.000 $1.000 $0.350 $0.200 $0.220 $0.150 $0.200 $0.250 $0.370 $0.210 $0.250
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 266.000 $1.000 $1.300 $0.550 $0.620 $0.700 $0.550 $1.000 $1.350 $0.580 $1.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 3,832.000 $2.000 $0.500 $0.450 $0.500 $0.600 $0.450 $0.300 $0.520 $0.470 $0.300
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 380.000 $7.000 $2.400 $4.000 $4.480 $5.000 $4.000 $2.750 $2.500 $4.240 $2.750
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 19.000 $115.000 $65.000 $30.000 $33.600 $37.000 $30.000 $75.000 $70.000 $32.000 $75.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 16.000 $130.000 $73.000 $30.000 $33.600 $37.000 $30.000 $70.000 $78.500 $32.000 $70.000
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 9.000 $65.000 $31.000 $10.000 $11.200 $12.000 $10.000 $20.000 $32.500 $10.600 $20.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 11,274.000 $1.000 $0.350 $0.220 $0.250 $0.300 $0.220 $0.350 $0.370 $0.230 $0.350
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 97,597.000 $1.000 $0.350 $0.200 $0.220 $0.240 $0.200 $0.250 $0.370 $0.210 $0.250
WK ZN PAV MRK NON-REMOV (Y)12"(SLD)
LF 2,578.000 $4.000 $1.400 $0.900 $1.010 $1.000 $0.900 $1.000 $1.500 $0.950 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 201.000 $5.000 $1.000 $1.000 $1.400 $2.500 $0.500 $1.240 $2.500 $1.180 $3.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,746.000 $5.000 $1.000 $1.000 $1.400 $2.500 $0.500 $1.170 $2.500 $1.180 $1.500
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 266.000 $4.000 $1.700 $0.870 $0.970 $1.000 $0.870 $1.000 $1.750 $0.920 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,832.000 $2.000 $0.800 $0.800 $0.900 $1.000 $0.800 $0.800 $0.850 $0.840 $0.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 380.000 $12.000 $6.500 $6.900 $7.730 $8.000 $6.900 $6.500 $6.900 $7.300 $6.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 19.000 $225.000 $125.000 $150.000 $168.000 $180.000 $150.160 $160.000 $132.500 $158.000 $160.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 16.000 $250.000 $145.000 $159.000 $178.080 $190.000 $159.000 $170.000 $154.000 $168.000 $170.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 9.000 $80.000 $56.000 $55.000 $61.600 $70.000 $55.000 $60.000 $60.200 $58.000 $60.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 2,578.000 $5.000 $3.550 $2.760 $3.090 $3.500 $2.760 $3.250 $3.750 $2.900 $3.250
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 73,942.000 $2.000 $0.730 $0.670 $0.750 $0.800 $0.670 $0.800 $0.780 $0.710 $0.800
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 97,597.000 $2.000 $0.700 $0.670 $0.750 $0.800 $0.670 $0.800 $0.740 $0.710 $0.800
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
LF 11,274.000 $2.000 $0.800 $0.700 $0.780 $0.900 $0.700 $0.850 $0.850 $0.740 $0.850
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
LF 968.000 $2.000 $2.000 $0.570 $0.640 $0.700 $0.570 $1.000 $2.150 $0.600 $1.000
PAVEMENT SLER 6"
LF 5,460.000 $1.000 $0.170 $0.120 $0.130 $0.150 $0.120 $0.170 $0.180 $0.130 $0.170
PAVEMENT SLER 8"
LF 216.000 $3.000 $0.260 $0.250 $0.280 $0.300 $0.250 $0.350 $0.280 $0.260 $0.350
PAVEMENT SLER 12"
LF 600.000 $6.000 $0.760 $0.750 $0.840 $0.900 $0.750 $1.000 $0.800 $0.800 $1.000
PAVEMENT SLER 24"
LF 131.000 $20.000 $1.350 $1.000 $1.120 $1.250 $1.000 $2.000 $1.400 $1.050 $2.000
PAVEMENT SLER (ARROW)
EA 3.000 $75.000 $25.000 $15.000 $16.800 $18.000 $15.000 $30.000 $27.000 $16.000 $30.000
PAVEMENT SLER (WORD)
EA 1.000 $80.000 $30.000 $15.000 $16.800 $18.000 $15.000 $50.000 $32.000 $16.000 $50.000
PAVEMENT SLER (YLD TRI)
EA 9.000 $25.000 $10.750 $10.000 $11.200 $12.000 $10.000 $20.000 $11.500 $10.600 $20.000
REFL PAV MRKR TY I-C
EA 201.000 $8.000 $5.000 $3.690 $4.130 $4.500 $3.690 $3.750 $5.400 $3.910 $3.750
REFL PAV MRKR TY II-A-A
EA 2,004.000 $8.000 $4.000 $3.600 $4.030 $4.500 $3.600 $3.750 $4.200 $3.810 $3.750
ELIM EXT PM & MRKS (4")
LF 5,460.000 $2.000 $0.340 $0.900 $1.010 $0.750 $0.900 $0.500 $0.360 $0.950 $0.500
ELIM EXT PM & MRKS (8")
LF 216.000 $2.000 $0.690 $0.960 $1.080 $0.750 $0.960 $0.750 $0.720 $1.000 $0.750
ELIM EXT PM & MRKS (12")
LF 600.000 $6.000 $1.600 $1.750 $1.960 $0.750 $1.750 $1.000 $1.700 $1.850 $1.000
ELIM EXT PM & MRKS (24")
LF 131.000 $10.000 $2.650 $3.000 $3.360 $0.750 $3.000 $2.250 $2.800 $3.180 $2.250
ELIM EXT PM & MRKS (ARROW)
EA 3.000 $180.000 $39.000 $45.000 $50.400 $10.000 $45.000 $50.000 $42.000 $47.000 $50.000
ELIM EXT PM & MRKS (WORD)
EA 1.000 $180.000 $44.000 $45.000 $50.400 $60.000 $45.000 $80.000 $47.000 $47.000 $80.000
ELIM EXT PM & MRKS (18")(YLD TRI)
EA 9.000 $120.000 $23.000 $10.000 $11.200 $12.000 $10.000 $15.000 $24.500 $10.500 $15.000
PAV SURF PREP FOR MRK (6")
LF 5,460.000 $2.000 $0.020 $0.300 $0.340 $0.400 $0.300 $0.050 $0.020 $0.320 $0.050
PAV SURF PREP FOR MRK (8")
LF 216.000 $2.000 $0.070 $0.500 $0.560 $0.600 $0.500 $0.100 $0.080 $0.530 $0.100
PAV SURF PREP FOR MRK (12")
LF 600.000 $5.000 $0.270 $0.750 $0.670 $0.750 $0.500 $0.500 $0.280 $0.690 $0.500
PAV SURF PREP FOR MRK (24")
LF 131.000 $10.000 $0.460 $0.750 $0.840 $0.900 $0.750 $1.000 $0.480 $0.800 $1.000
PAV SURF PREP FOR MRK (ARROW)
EA 3.000 $70.000 $12.000 $10.000 $11.200 $12.000 $10.000 $20.000 $12.400 $10.600 $20.000
PAV SURF PREP FOR MRK (WORD)
EA 1.000 $225.000 $12.500 $10.000 $11.200 $12.000 $10.000 $35.000 $12.800 $10.590 $35.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 9.000 $120.000 $5.350 $10.000 $11.200 $12.000 $10.000 $5.000 $5.600 $10.590 $5.000
TREE TRIMMING / BRUSH REMOVAL
MI 7.190 $5,000.000 $7,000.000 $3,000.000 $6,854.000 $12,000.000 $5,841.500 $5,850.000 $6,250.000 $27,000.000 $2,000.000
Totals: $10,552,188.500 $6,252,902.755 $6,661,571.940 $6,804,349.460 $6,885,458.530 $6,925,512.993 $7,294,915.065 $7,368,236.685 $7,446,927.070 $7,566,086.630