PARKER FM 5 (1469-01-022)

Items: 100

County: PARKER
Length: N/A
Highway: FM 5
District: FORT WORTH
Control Number: 1469-01-022
DBE Goal: N/A
Project: C 1469-1-22
Guaranty: N/A
Time: 87 WORKING DAYS
Engineer's Estimate: $1,128,656.00
Date: 03/04/2021 (5 years ago)
Contract Number: N/A
Type: RECONSTRUCT EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (9)
E
Engineer's Estimate
$1,128,656.00
$1,001,549.09
Over/Under Est: -11.26% -$127,106.91
Over/Under Est: -9.33% -$105,318.38
Amt Left: 2.18% $21,788.53
Over/Under Est: -4.26% -$48,088.71
Amt Left: 7.89% $79,018.20
Delta: -5.59% -$57,229.67
Over/Under Est: -0.15% -$1,718.93
Amt Left: 12.52% $125,387.98
Delta: -4.29% -$46,369.78
$1,128,206.78
Over/Under Est: -0.04% -$449.22
Amt Left: 12.65% $126,657.69
Delta: -0.11% -$1,269.71
$1,138,514.89
Over/Under Est: 0.87% $9,858.89
Amt Left: 13.68% $136,965.80
Delta: -0.91% -$10,308.11
Over/Under Est: 10.46% $118,047.28
Amt Left: 24.48% $245,154.19
Delta: -9.50% -$108,188.39
Over/Under Est: 12.98% $146,468.80
Amt Left: 27.32% $273,575.71
Delta: -2.28% -$28,421.52
$1,595,924.90
Over/Under Est: 41.4% $467,268.90
Amt Left: 59.35% $594,375.81
Delta: -25.16% -$320,800.10

Bid Items & Bid Tabulations

100 Total 0 of 100
PARKER  |  FM 5  |  FORT WORTH  |  1469-01-022  |  03/04/2021  |  $1,128,656.00  |  C 1469-1-22  |  RECON EXIST ROADWAY  |  87 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
ED BELL CONSTRUCTION COMPANY
EUROVIA ATLANTIC COAST LLC
JAY MILLS CONTRACTING, INCORPORATED
JAGOE-PUBLIC COMPANY
A. L. HELMCAMP, INC.
SEMA CONSTRUCTION, INC.
NEW WORLD CONTRACTING, LLC
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 17.000 $700.000 $1,375.000 $2,100.000 $650.000 $1,750.000 $2,100.000 $600.000 $7,300.000 $600.000 $7,059.000
REMOVING CONCRETE(MOW STRIP)
LF 500.000 $18.000 $13.600 $1.250 $8.000 $7.000 $14.740 $13.000 $7.500 $4.000 $50.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 1,244.000 $7.000 $8.000 $4.000 $7.000 $12.000 $7.370 $4.000 $9.000 $5.200 $20.000
EXCAVATION (ROADWAY)
CY 1,077.000 $15.000 $11.900 $5.000 $18.000 $16.000 $19.000 $20.000 $13.000 $32.000 $20.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 1,570.000 $18.000 $12.600 $23.000 $28.000 $10.000 $23.000 $28.000 $25.000 $24.000 $30.000
COMPOST MANUF TOPSOIL (4")
SY 7,579.000 $1.000 $1.150 $2.000 $1.030 $1.100 $3.760 $1.750 $1.500 $8.000 $3.000
BLOCK SODDING
SY 7,579.000 $7.000 $3.450 $3.000 $3.040 $3.500 $3.200 $4.000 $4.200 $6.000 $4.000
CELL FBR MLCH SEED(TEMP)(WARM)
SY 3,790.000 $0.500 $1.000 $0.100 $0.890 $1.000 $0.940 $0.650 $0.700 $1.000 $1.000
CELL FBR MLCH SEED(TEMP)(COOL)
SY 3,790.000 $0.500 $1.000 $0.100 $0.890 $1.000 $0.940 $0.650 $0.700 $1.000 $1.000
VEGETATIVE WATERING
MG 530.600 $30.000 $35.000 $3.150 $39.500 $17.000 $42.250 $18.000 $20.000 $56.000 $50.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 4,504.000 $20.000 $12.150 $20.000 $13.500 $11.250 $15.750 $17.000 $12.500 $19.000 $20.000
LIME (HYD, COM, OR QK(SLURRY))
TON 83.000 $200.000 $216.000 $195.000 $185.000 $185.000 $175.000 $210.000 $145.000 $205.000 $200.000
LIME TRT (EXST MATL)(8")
SY 4,980.000 $8.000 $5.500 $3.500 $8.500 $4.150 $10.000 $7.000 $10.000 $8.000 $12.000
PRIME COAT (MULTI OPTION)
GAL 1,351.000 $6.000 $5.000 $7.150 $4.000 $5.000 $5.000 $5.000 $7.000 $5.500 $6.000
ASPH (AC-20-5TR)
GAL 2,389.000 $10.000 $6.500 $6.110 $5.500 $4.000 $5.790 $4.000 $6.500 $5.500 $6.000
AGGR(TY-PB GR-4 SAC-B)
CY 32.000 $100.000 $536.875 $605.000 $555.000 $200.000 $584.280 $300.000 $575.000 $800.000 $800.000
D-GR HMA(SQ) TY-B PG64-28
TON 36.000 $100.000 $145.000 $275.000 $180.000 $250.000 $230.000 $175.000 $265.000 $270.000 $300.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 622.000 $3.000 $3.750 $4.000 $3.500 $7.000 $3.680 $4.000 $3.500 $1.200 $20.000
PLAN & TEXT ASPH CONC PAV (2")
SY 5,339.000 $4.000 $1.750 $2.000 $1.500 $3.500 $1.580 $4.000 $2.500 $1.200 $10.000
RIPRAP (MOW STRIP)(4 IN)
CY 14.000 $550.000 $680.000 $630.000 $785.000 $625.000 $631.650 $860.000 $475.000 $534.000 $500.000
RC PIPE (CL III)(18 IN)
LF 60.000 $70.000 $62.400 $60.000 $55.000 $60.000 $57.900 $90.000 $120.000 $108.000 $85.000
RC PIPE (ARCH)(CL III)(DES 1)
LF 120.000 $125.000 $170.000 $120.000 $150.000 $160.000 $157.910 $170.000 $160.000 $205.000 $150.000
RC PIPE (ARCH)(CL III)(DES 3)
LF 56.000 $220.000 $200.000 $185.000 $175.000 $180.000 $184.230 $200.000 $210.000 $225.000 $200.000
RC PIPE (ARCH)(CL III)(DES 4)
LF 40.000 $250.000 $280.000 $295.000 $250.000 $275.000 $263.190 $260.000 $270.000 $270.000 $250.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,000.000 $1,050.000 $1,100.000 $950.000 $1,150.000 $1,000.120 $850.000 $1,200.000 $3,750.000 $1,850.000
SET (TY II) (DES 1) (RCP) (6: 1) (P)
EA 6.000 $3,500.000 $1,200.000 $1,650.000 $1,050.000 $1,250.000 $1,105.390 $1,100.000 $2,000.000 $6,426.000 $1,850.000
SET (TY II) (DES 3) (RCP) (6: 1) (P)
EA 2.000 $6,500.000 $2,500.000 $1,765.000 $2,250.000 $2,250.000 $2,368.700 $1,500.000 $5,000.000 $10,750.000 $2,000.000
SET (TY II) (DES 4) (RCP) (6: 1) (P)
EA 2.000 $6,800.000 $7,225.000 $1,945.000 $6,370.000 $5,000.000 $6,706.030 $4,000.000 $1,700.000 $16,000.000 $2,500.000
REMOV STR (PIPE)
LF 253.000 $35.000 $13.600 $28.000 $12.000 $15.000 $12.630 $35.000 $25.000 $54.000 $50.000
MOBILIZATION
LS 1.000 $102,605.000 $100,000.000 $114,000.000 $100,000.000 $110,000.000 $110,000.000 $102,000.000 $124,100.000 $105,000.000 $150,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $8,000.000 $15,250.000 $23,000.000 $15,000.000 $13,000.000 $3,000.000 $16,000.000 $19,240.000 $3,450.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 210.000 $30.000 $29.550 $27.500 $26.070 $36.000 $27.450 $23.000 $24.000 $28.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 210.000 $12.000 $10.000 $12.500 $9.000 $17.000 $9.470 $10.000 $9.000 $10.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $25.000 $25.277 $10.500 $22.300 $27.000 $23.480 $10.000 $22.000 $24.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $10.000 $9.150 $5.250 $8.050 $11.000 $8.470 $2.000 $8.000 $9.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,012.000 $2.500 $2.250 $1.750 $1.960 $3.500 $2.060 $2.600 $2.700 $2.500 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,012.000 $1.000 $0.600 $0.250 $0.550 $1.000 $0.580 $1.000 $1.000 $0.600 $2.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 210.000 $3.000 $3.800 $2.500 $3.370 $9.000 $3.550 $4.000 $4.250 $3.600 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 210.000 $1.000 $0.600 $1.050 $0.550 $4.000 $0.580 $1.000 $1.000 $0.600 $9.000
CONSTRUCTING DETOURS
SY 623.000 $55.000 $67.850 $80.000 $80.000 $100.000 $71.500 $90.000 $77.000 $61.000 $65.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,360.000 $35.000 $44.000 $18.000 $39.000 $67.000 $41.060 $60.000 $60.000 $64.000 $75.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 240.000 $50.000 $44.000 $32.000 $39.000 $63.000 $41.060 $60.000 $62.000 $65.000 $75.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 1,040.000 $5.000 $11.350 $6.000 $10.000 $12.000 $10.530 $17.000 $6.200 $6.500 $20.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 200.000 $9.000 $11.350 $8.000 $10.000 $12.000 $10.530 $17.000 $10.500 $11.000 $20.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,360.000 $13.000 $20.400 $7.000 $18.000 $16.000 $18.950 $17.000 $11.000 $6.500 $30.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 240.000 $25.000 $20.400 $17.000 $18.000 $16.000 $18.950 $17.000 $9.500 $10.500 $30.000
DRIVEWAYS (ACP)
SY 382.000 $50.000 $59.000 $50.000 $43.000 $80.000 $53.000 $55.000 $32.000 $54.000 $65.000
TURNOUTS (ACP)
SY 141.000 $65.000 $55.000 $50.000 $38.000 $80.000 $37.000 $55.000 $34.000 $54.000 $65.000
MTL W-BEAM GD FEN (TIM POST)
LF 175.000 $25.000 $20.400 $18.900 $18.000 $25.000 $18.950 $20.000 $19.000 $20.000 $25.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 1.000 $1,000.000 $1,050.000 $971.250 $925.000 $1,300.000 $973.800 $1,000.000 $1,000.000 $990.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 300.000 $3.000 $2.500 $2.360 $2.250 $6.000 $2.370 $2.500 $2.600 $2.500 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,700.000 $2,725.000 $2,520.000 $2,400.000 $3,000.000 $2,526.610 $2,600.000 $2,600.000 $2,580.000 $2,850.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $300.000 $225.000 $210.000 $200.000 $250.000 $210.550 $220.000 $225.000 $215.000 $1,500.000
WIRE FENCE (TY A)
LF 40.000 $20.000 $19.250 $35.000 $85.000 $57.000 $72.640 $30.000 $23.000 $27.000 $10.000
WIRE FENCE (TY A) (MOD)
LF 40.000 $30.000 $28.350 $40.000 $102.000 $72.000 $101.060 $30.000 $25.000 $64.000 $50.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 6.000 $230.000 $250.000 $336.000 $320.000 $400.000 $368.460 $240.000 $250.000 $400.000 $850.000
CONDT (PVC) (SCH 40) (2")
LF 20.000 $20.000 $17.000 $13.000 $30.000 $40.000 $31.580 $32.000 $13.000 $27.000 $15.000
TRAY CABLE (4 CONDR) (12 AWG)
LF 20.000 $5.000 $2.250 $5.000 $5.000 $6.000 $5.260 $5.500 $3.600 $5.500 $3.000
ALUMINUM SIGNS (TY A)
SF 22.000 $30.000 $31.750 $27.500 $25.750 $30.000 $27.110 $275.000 $23.000 $26.000 $30.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 6.000 $550.000 $600.000 $435.750 $415.000 $725.000 $436.890 $500.000 $295.000 $700.000 $850.000
REMOVE SM RD SN SUP&AM
EA 1.000 $1,000.000 $85.000 $262.500 $250.000 $200.000 $263.190 $130.000 $130.000 $140.000 $250.000
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
EA 3.000 $70.000 $50.000 $42.000 $40.000 $100.000 $42.110 $65.000 $43.000 $42.000 $100.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 12,136.000 $1.000 $0.750 $0.740 $0.700 $0.800 $0.840 $0.400 $0.850 $1.000 $1.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 12,136.000 $1.000 $0.750 $0.740 $0.700 $0.800 $0.840 $0.400 $0.850 $1.000 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 196.000 $1.000 $2.000 $1.400 $2.000 $1.700 $1.340 $0.600 $0.850 $3.500 $5.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 196.000 $1.000 $2.000 $1.500 $2.000 $1.700 $1.340 $0.600 $1.000 $3.500 $5.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 440.000 $2.500 $1.150 $1.060 $1.000 $1.100 $1.050 $1.100 $1.200 $1.000 $1.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 922.000 $1.500 $1.150 $1.060 $1.000 $1.100 $1.050 $1.100 $1.200 $1.000 $1.200
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 124.000 $7.000 $6.744 $6.310 $5.950 $7.000 $8.950 $6.500 $7.000 $6.000 $6.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 4.000 $150.000 $240.000 $222.600 $210.000 $300.000 $157.910 $220.000 $250.000 $150.000 $180.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $200.000 $250.000 $238.500 $225.000 $250.000 $210.550 $240.000 $270.000 $182.000 $200.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 758.000 $3.500 $4.500 $4.190 $3.950 $5.000 $4.740 $4.200 $4.600 $4.000 $4.000
PAVEMENT SEALER 4"
LF 10,924.000 $0.500 $0.249 $0.230 $0.220 $0.250 $0.160 $0.220 $0.270 $0.500 $0.250
PAVEMENT SEALER 8"
LF 1,362.000 $0.500 $0.440 $0.400 $0.380 $0.500 $0.320 $0.380 $0.500 $0.500 $0.500
PAVEMENT SEALER 12"
LF 758.000 $2.500 $1.150 $1.060 $1.000 $1.250 $0.470 $1.050 $1.250 $1.500 $1.250
PAVEMENT SEALER 24"
LF 124.000 $3.500 $2.250 $2.120 $2.000 $2.500 $1.050 $2.000 $2.400 $2.000 $2.500
PAVEMENT SEALER (ARROW)
EA 4.000 $30.000 $85.000 $79.500 $75.000 $100.000 $26.320 $75.000 $90.000 $54.000 $100.000
PAVEMENT SEALER (WORD)
EA 4.000 $35.000 $85.000 $79.500 $75.000 $100.000 $36.850 $75.000 $85.000 $54.000 $100.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 4,160.000 $0.500 $0.450 $0.420 $0.400 $0.500 $0.530 $0.450 $0.500 $1.000 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 6,764.000 $0.500 $0.450 $0.420 $0.400 $0.500 $0.530 $0.400 $0.500 $1.000 $1.000
REFL PAV MRKR TY I-C
EA 42.000 $5.000 $4.400 $4.080 $3.850 $5.000 $7.370 $5.000 $4.600 $4.000 $5.000
REFL PAV MRKR TY II-A-A
EA 342.000 $3.500 $4.400 $4.080 $3.850 $5.000 $7.370 $5.000 $4.600 $4.000 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 640.000 $0.500 $0.450 $0.420 $0.400 $0.500 $2.110 $0.400 $0.500 $1.000 $1.200
VEH SIG SEC (12")LED(YEL)
EA 4.000 $400.000 $450.000 $420.000 $660.000 $750.000 $694.820 $700.000 $310.000 $535.000 $400.000
BACK PLATE (12")(1 SEC)(VENTED)ALUM
EA 4.000 $150.000 $135.000 $80.000 $300.000 $350.000 $315.830 $320.000 $80.000 $130.000 $150.000
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 132.000 $4.000 $5.500 $3.000 $5.000 $6.000 $5.260 $6.000 $3.000 $4.500 $3.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $7,000.000 $8,500.000 $9,500.000 $17,300.000 $10,000.000 $18,212.620 $19,000.000 $9,000.000 $9,150.000 $12,500.000
TREE REMOVAL (4" - 12" DIA)
EA 14.000 $1,000.000 $86.000 $50.000 $61.000 $400.000 $894.840 $200.000 $70.000 $242.000 $1,000.000
TREE REMOVAL (12" - 18" DIA)
EA 1.000 $800.000 $700.000 $450.000 $500.000 $750.000 $526.380 $500.000 $600.000 $520.000 $2,000.000
TREE REMOVAL (18" - 24" DIA)
EA 2.000 $1,500.000 $700.000 $475.000 $500.000 $1,000.000 $1,034.860 $950.000 $600.000 $678.000 $3,000.000
TREE REMOVAL (24" - 30" DIA)
EA 3.000 $1,500.000 $700.000 $500.000 $500.000 $1,500.000 $1,579.130 $980.000 $600.000 $695.000 $4,000.000
TREE REMOVAL (30" - 36" DIA)
EA 2.000 $2,000.000 $1,000.000 $750.000 $750.000 $2,000.000 $1,579.130 $1,300.000 $900.000 $1,045.000 $5,000.000
TREE REMOVAL (36" - 42" DIA)
EA 1.000 $2,500.000 $3,500.000 $2,500.000 $2,500.000 $2,500.000 $2,631.880 $1,500.000 $3,100.000 $1,370.000 $10,000.000
SP MIXES SP-C SAC-A PG70-28
TON 1,011.000 $120.000 $126.000 $135.000 $106.000 $130.000 $120.000 $140.000 $126.000 $138.000 $130.000
TACK COAT
GAL 1,627.000 $3.000 $0.010 $3.000 $3.000 $0.010 $3.650 $3.500 $5.300 $5.000 $6.000
REMOVE AND RELOCATE GATE ASSEMBLY
EA 1.000 $14,000.000 $5,600.000 $1,100.000 $6,000.000 $2,500.000 $6,823.090 $1,500.000 $5,500.000 $3,350.000 $10,000.000
MOVE CATTLE GUARD
EA 1.000 $20,000.000 $4,000.000 $2,750.000 $3,500.000 $4,000.000 $10,352.890 $2,500.000 $2,500.000 $1,150.000 $5,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $13,000.000 $4,000.000 $6,300.000 $16,000.000 $14,000.000 $7,639.170 $12,000.000 $7,500.000 $18,300.000 $12,500.000
TMA (STATIONARY)
DAY 120.000 $200.000 $0.010 $73.500 $300.000 $175.000 $255.710 $75.000 $190.000 $201.000 $250.000
TMA (MOBILE OPERATION)
DAY 30.000 $450.000 $0.010 $252.000 $575.000 $500.000 $450.600 $50.000 $660.000 $185.000 $550.000
Totals: $1,128,656.000 $1,001,549.106 $1,023,337.620 $1,080,567.290 $1,126,937.070 $1,128,206.780 $1,138,514.890 $1,246,703.280 $1,275,124.800 $1,595,924.900