PARKER IH 20 (0314-07-054)

Items: 38

County: PARKER
Length: N/A
Highway: IH 20
District: FORT WORTH
Control Number: 0314-07-054
DBE Goal: N/A
Project: NH 1702(088)
Guaranty: N/A
Time: 64 WORKING DAYS
Engineer's Estimate: $2,242,995.00
Date: 05/02/2017 (9 years ago)
Contract Number: N/A
Type: MILL AND OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$2,242,995.00
Over/Under Est: -24.32% -$545,483.05
Over/Under Est: -23.42% -$525,382.70
Amt Left: 1.18% $20,100.35
Over/Under Est: -20.26% -$454,397.21
Amt Left: 5.37% $91,085.84
Delta: -4.13% -$70,985.49
Over/Under Est: -19.56% -$438,769.25
Amt Left: 6.29% $106,713.80
Delta: -0.87% -$15,627.96
Over/Under Est: -12.52% -$280,935.03
Amt Left: 15.58% $264,548.02
Delta: -8.75% -$157,834.22
$1,991,827.70
Over/Under Est: -11.2% -$251,167.30
Amt Left: 17.34% $294,315.75
Delta: -1.52% -$29,767.73

Bid Items & Bid Tabulations

38 Total 0 of 38
PARKER  |  IH 20  |  FORT WORTH  |  0314-07-054  |  05/02/2017  |  $2,242,995.00  |  NH 1702(088)  |  MILL AND OVERLAY  |  64 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
THE LANE CONSTRUCTION CORPORATION
PEACHTREE CONSTRUCTION, LTD.
NORTHEASTERN PAVERS, INC.
OLDCASTLE MATERIALS TEXAS, INC.
IOC COMPANY, LLC
BACKFILL (TY B)
STA 216.000 $175.000 $80.000 $79.500 $150.000 $125.000 $270.000 $50.000
AGGR(TY-PB GR-4 SAC-B)
CY 895.000 $95.000 $110.000 $105.000 $98.000 $85.000 $91.000 $90.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 37,415.000 $3.600 $2.170 $3.000 $2.850 $2.800 $2.150 $2.750
D-GR HMA TY C SAC-B PG70-28(LATEX ADD)
TON 10,999.000 $85.000 $65.000 $69.250 $73.500 $72.000 $82.000 $95.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 800.000 $65.000 $52.000 $37.000 $60.000 $48.000 $64.600 $72.000
PLANE ASPH CONC PAV (1" TO 3")
SY 93,768.000 $2.000 $1.800 $1.350 $1.330 $2.000 $1.350 $0.800
FULL - DEPTH REPAIR CRCP (8")
SY 800.000 $225.000 $240.000 $175.000 $180.000 $190.000 $175.000 $230.000
RIPRAP (MOW STRIP)(5 IN)
CY 150.000 $500.000 $500.000 $600.000 $450.000 $500.000 $453.000 $250.000
HEADER TYPE EXPANSION JOINT
LF 498.000 $150.000 $60.000 $120.000 $45.000 $68.000 $61.190 $100.000
JOINT SEALANT
LF 498.000 $20.000 $16.000 $25.500 $26.000 $15.000 $13.440 $20.000
MOBILIZATION
LS 1.000 $165,000.000 $110,688.000 $50,000.000 $110,000.000 $140,000.000 $180,100.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $5,000.000 $7,000.000 $20,150.000 $4,500.000 $1,200.000 $12,300.000 $2,000.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 100.000 $20.000 $10.000 $5.000 $5.000 $0.010 $5.030 $3.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $5.000 $2.000 $2.000 $1.000 $0.010 $1.010 $1.000
RUMBLE STRIPS (SHOULDER)
LF 33,840.000 $0.500 $0.150 $0.240 $0.240 $0.150 $0.360 $0.100
MTL W-BEAM GD FEN (TIM POST)
LF 1,450.000 $20.000 $21.000 $20.000 $23.000 $23.000 $22.500 $15.000
MTL W-BEAM GD FEN (STEEL POST)
LF 100.000 $60.000 $26.000 $23.000 $25.000 $23.000 $25.000 $50.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $1,475.000 $1,900.000 $2,500.000 $2,400.000 $2,471.150 $1,200.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,500.000 $1,200.000 $1,000.000 $1,200.000 $1,200.000 $1,192.250 $500.000
REMOVE METAL BEAM GUARD FENCE
LF 1,550.000 $5.000 $3.500 $3.000 $2.200 $2.200 $2.180 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $200.000 $125.000 $300.000 $165.000 $165.000 $162.600 $50.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $300.000 $250.000 $300.000 $165.000 $165.000 $162.600 $50.000
GDRAIL END TRT(INST)(WOOD POST)(TY III)
EA 5.000 $2,500.000 $2,050.000 $2,500.000 $3,100.000 $3,000.000 $3,089.000 $2,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 19.000 $50.000 $35.000 $3.000 $38.000 $40.000 $37.950 $20.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 16,440.000 $0.500 $0.200 $0.250 $0.350 $0.250 $0.300 $0.230
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 68,145.000 $0.500 $0.150 $0.180 $0.350 $0.200 $0.230 $0.170
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 14,400.000 $1.250 $0.350 $0.410 $0.600 $0.450 $0.510 $0.400
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 68,235.000 $0.500 $0.150 $0.180 $0.350 $0.200 $0.230 $0.170
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 200.000 $1.000 $1.000 $1.200 $1.200 $2.500 $1.450 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,800.000 $2.500 $0.750 $0.900 $1.000 $1.000 $1.090 $0.860
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 1,100.000 $4.000 $1.600 $4.250 $3.500 $2.500 $2.310 $1.750
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,200.000 $4.000 $2.900 $3.450 $3.500 $2.500 $4.180 $3.200
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 5,480.000 $1.000 $0.550 $0.650 $0.700 $0.600 $0.800 $0.600
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 22,730.000 $1.000 $0.480 $0.570 $0.700 $0.450 $0.700 $0.550
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 22,745.000 $1.000 $0.480 $0.570 $0.700 $0.450 $0.700 $0.550
PREFAB PAV MRK TY C (W) (NUMBER)
EA 4.000 $220.000 $195.000 $230.000 $300.000 $220.000 $280.170 $200.000
REFL PAV MRKR TY II-C-R
EA 500.000 $7.000 $3.000 $3.550 $4.300 $3.250 $4.320 $3.450
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 200.000 $150.000 $35.000 $65.000 $85.000 $85.000 $105.570 $50.000
Totals: $2,242,995.000 $1,697,511.950 $1,717,612.300 $1,788,597.790 $1,804,225.750 $1,962,059.970 $1,991,827.700