|
|
PREPARING ROW
|
STA
|
162.340
|
$4,000.000
|
$34,870.000
|
$32,742.910
|
$33,129.800
|
$29,561.000
|
$34,660.030
|
$3,500.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
9,476.000
|
$12.500
|
$13.600
|
$9.500
|
$32.000
|
$18.050
|
$17.230
|
$7.500
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
5,922.000
|
$25.000
|
$7.170
|
$8.000
|
$8.000
|
$9.290
|
$9.460
|
$8.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
2,257.000
|
$40.000
|
$15.760
|
$6.000
|
$8.000
|
$11.830
|
$16.660
|
$8.000
|
|
|
REMOVING STAB BASE & ASPH PAV (7"-12")
|
SY
|
24,088.000
|
$8.000
|
$9.020
|
$7.000
|
$14.500
|
$17.810
|
$15.340
|
$12.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
490,972.000
|
$11.000
|
$8.170
|
$10.000
|
$8.000
|
$7.700
|
$8.510
|
$12.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
339,754.000
|
$13.900
|
$3.930
|
$3.000
|
$4.000
|
$5.880
|
$5.230
|
$16.000
|
|
|
BACKFILL (TY B)
|
STA
|
162.340
|
$190.000
|
$697.880
|
$200.000
|
$105.300
|
$425.820
|
$168.350
|
$94.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
509,771.000
|
$2.500
|
$1.570
|
$1.750
|
$1.400
|
$1.810
|
$3.670
|
$0.750
|
|
|
DRILL SEEDING (PERM) (URBAN) (CLAY)
|
SY
|
509,771.000
|
$0.300
|
$0.180
|
$0.180
|
$0.180
|
$0.180
|
$0.180
|
$0.200
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
30,706.000
|
$0.250
|
$0.140
|
$0.140
|
$0.180
|
$0.140
|
$0.140
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
1,388.000
|
$35.000
|
$10.000
|
$30.000
|
$35.000
|
$24.440
|
$71.680
|
$45.000
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
2,206.000
|
$290.000
|
$300.910
|
$330.000
|
$377.490
|
$305.700
|
$357.050
|
$342.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
132,356.000
|
$6.000
|
$3.530
|
$5.000
|
$4.330
|
$3.970
|
$4.370
|
$6.000
|
|
|
PRIME COAT (EC-30)
|
GAL
|
26,472.000
|
$6.500
|
$5.020
|
$5.250
|
$5.000
|
$4.950
|
$4.950
|
$6.500
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
107,616.000
|
$78.000
|
$72.400
|
$85.000
|
$88.000
|
$84.680
|
$87.060
|
$104.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (11")
|
SY
|
9,997.000
|
$100.000
|
$82.400
|
$100.000
|
$92.000
|
$97.940
|
$100.680
|
$175.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,022.000
|
$260.000
|
$174.840
|
$155.000
|
$285.820
|
$191.590
|
$276.710
|
$64.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
860.000
|
$3.750
|
$12.510
|
$12.500
|
$2.520
|
$20.300
|
$2.500
|
$2.500
|
|
|
TEMPORARY SPL SHORING
|
SF
|
15,824.000
|
$30.000
|
$32.450
|
$7.000
|
$33.960
|
$36.640
|
$29.670
|
$5.500
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
3,081.000
|
$265.000
|
$192.970
|
$200.490
|
$223.630
|
$285.000
|
$256.040
|
$281.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
85.000
|
$330.000
|
$614.310
|
$558.630
|
$545.010
|
$562.000
|
$672.000
|
$689.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
84.000
|
$400.000
|
$708.990
|
$644.730
|
$629.010
|
$485.000
|
$732.000
|
$796.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
480.000
|
$500.000
|
$455.230
|
$564.180
|
$585.000
|
$395.000
|
$500.300
|
$566.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
68.000
|
$230.000
|
$259.220
|
$261.380
|
$255.000
|
$255.000
|
$302.000
|
$286.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
149.000
|
$560.000
|
$625.180
|
$630.380
|
$615.000
|
$615.000
|
$799.000
|
$689.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
216.000
|
$300.000
|
$400.140
|
$363.870
|
$355.000
|
$355.000
|
$330.000
|
$449.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (24 IN)
|
LF
|
120.000
|
$215.000
|
$355.060
|
$322.880
|
$315.000
|
$315.000
|
$440.000
|
$398.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
156.000
|
$400.000
|
$527.510
|
$479.700
|
$468.000
|
$468.000
|
$715.000
|
$592.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
279.200
|
$1,320.000
|
$1,000.000
|
$1,200.000
|
$985.470
|
$1,176.180
|
$2,026.460
|
$1,058.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
170.900
|
$1,700.000
|
$1,150.000
|
$1,550.000
|
$1,317.950
|
$1,491.240
|
$1,895.570
|
$1,432.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
178.200
|
$1,600.000
|
$1,220.000
|
$1,600.000
|
$1,325.570
|
$1,357.060
|
$1,674.660
|
$1,600.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
3,770.000
|
$800.000
|
$393.620
|
$500.000
|
$406.030
|
$443.890
|
$559.120
|
$700.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
67,160.000
|
$29.000
|
$20.100
|
$22.500
|
$18.520
|
$22.570
|
$26.400
|
$31.000
|
|
|
BRIDGE MEDIAN (HPC)
|
SF
|
3,766.000
|
$12.000
|
$13.450
|
$21.500
|
$12.980
|
$23.360
|
$18.920
|
$13.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
567.000
|
$800.000
|
$554.050
|
$600.000
|
$636.980
|
$567.810
|
$882.610
|
$1,662.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
21,039.000
|
$58.000
|
$66.140
|
$95.000
|
$120.550
|
$114.270
|
$112.430
|
$52.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
8,365.670
|
$200.000
|
$192.150
|
$170.000
|
$233.990
|
$173.510
|
$193.060
|
$235.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
515.000
|
$600.000
|
$546.620
|
$500.000
|
$518.760
|
$645.690
|
$556.940
|
$617.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
33.000
|
$630.000
|
$613.030
|
$800.000
|
$796.090
|
$570.600
|
$882.650
|
$692.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
744.000
|
$160.000
|
$122.280
|
$125.000
|
$84.640
|
$242.440
|
$176.640
|
$141.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
453.000
|
$210.000
|
$114.570
|
$130.000
|
$89.830
|
$250.270
|
$170.050
|
$145.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
392.000
|
$750.000
|
$531.290
|
$550.000
|
$570.950
|
$775.640
|
$691.710
|
$600.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
669.000
|
$560.000
|
$618.140
|
$550.000
|
$550.910
|
$524.380
|
$572.300
|
$698.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
1,564.000
|
$21.000
|
$13.710
|
$15.000
|
$17.730
|
$15.020
|
$14.460
|
$14.000
|
|
|
RAIL (TY C411) (MOD)
|
LF
|
1,713.600
|
$275.000
|
$217.050
|
$275.000
|
$188.140
|
$473.060
|
$390.540
|
$168.000
|
|
|
RAIL (TY C402) (MOD-1)
|
LF
|
1,396.200
|
$195.000
|
$334.480
|
$270.000
|
$263.530
|
$255.890
|
$306.660
|
$287.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
444.000
|
$155.000
|
$105.670
|
$135.000
|
$147.640
|
$104.390
|
$117.220
|
$85.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
304.000
|
$585.000
|
$556.740
|
$800.000
|
$526.530
|
$562.220
|
$1,000.000
|
$592.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
31.000
|
$860.000
|
$857.320
|
$850.000
|
$1,185.660
|
$2,518.430
|
$1,020.600
|
$1,639.380
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,291.000
|
$100.000
|
$101.940
|
$100.000
|
$98.880
|
$95.650
|
$94.270
|
$85.010
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
677.000
|
$125.000
|
$126.900
|
$135.000
|
$138.650
|
$104.710
|
$125.900
|
$114.670
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
452.000
|
$180.000
|
$168.170
|
$170.000
|
$155.450
|
$148.080
|
$178.810
|
$158.830
|
|
|
RC PIPE (CL IV)(42 IN)
|
LF
|
61.000
|
$270.000
|
$269.200
|
$220.000
|
$330.750
|
$257.960
|
$311.670
|
$257.940
|
|
|
INLET (COMPL)(CO)(10 FT)(FTW)
|
EA
|
12.000
|
$10,000.000
|
$8,410.300
|
$15,200.000
|
$17,471.690
|
$15,173.440
|
$15,579.570
|
$9,863.860
|
|
|
INLT (COMPL)(AD)(4'X 4'-3' X 3')(FTW)
|
EA
|
7.000
|
$9,500.000
|
$5,292.530
|
$4,000.000
|
$11,737.820
|
$6,033.820
|
$11,473.890
|
$6,768.550
|
|
|
HEADWALL (CH - FW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$7,500.000
|
$5,970.970
|
$4,500.000
|
$6,610.290
|
$16,345.070
|
$17,982.110
|
$5,295.620
|
|
|
HEADWALL (CH - FW - 0) (DIA= 42 IN)
|
EA
|
1.000
|
$8,000.000
|
$11,128.540
|
$8,000.000
|
$11,144.030
|
$17,517.620
|
$19,455.470
|
$6,101.540
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$7,500.000
|
$5,256.450
|
$4,000.000
|
$3,849.680
|
$15,704.060
|
$13,993.230
|
$4,734.830
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
4.000
|
$13,000.000
|
$13,915.840
|
$10,000.000
|
$11,458.960
|
$12,243.160
|
$20,114.780
|
$7,180.190
|
|
|
WINGWALL (FW - S) (HW=7 FT)
|
EA
|
2.000
|
$40,000.000
|
$15,037.350
|
$12,000.000
|
$14,572.980
|
$17,488.490
|
$25,634.840
|
$11,818.900
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$20,000.000
|
$36,496.250
|
$30,000.000
|
$19,873.750
|
$26,508.010
|
$40,130.640
|
$26,264.830
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
1.000
|
$30,000.000
|
$49,614.170
|
$40,000.000
|
$27,512.700
|
$29,978.590
|
$46,736.090
|
$33,864.530
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
15.000
|
$1,800.000
|
$1,951.350
|
$2,200.000
|
$1,531.830
|
$2,490.210
|
$3,848.140
|
$1,458.690
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$3,300.000
|
$4,719.960
|
$3,000.000
|
$2,585.890
|
$5,190.420
|
$6,864.770
|
$2,256.590
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
5.000
|
$4,900.000
|
$4,151.340
|
$3,200.000
|
$3,006.730
|
$4,891.240
|
$6,087.620
|
$2,502.470
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$800.000
|
$786.820
|
$2,000.000
|
$1,044.900
|
$1,577.960
|
$1,844.860
|
$845.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
4.000
|
$1,600.000
|
$1,550.120
|
$1,100.000
|
$1,022.020
|
$2,018.130
|
$2,068.110
|
$3,039.000
|
|
|
REMOV STR (PIPE)
|
LF
|
6.000
|
$20.000
|
$273.150
|
$92.000
|
$71.280
|
$211.920
|
$221.350
|
$18.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
4.000
|
$85.000
|
$371.970
|
$200.000
|
$267.310
|
$453.620
|
$328.030
|
$313.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$80,000.000
|
$225,000.000
|
$52,000.000
|
$129,350.360
|
$127,925.800
|
$112,290.000
|
$136,999.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$5,448,000.000
|
$5,439,849.220
|
$5,300,000.000
|
$5,378,293.070
|
$5,666,460.000
|
$5,600,000.000
|
$6,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
29.000
|
$14,000.000
|
$26,494.250
|
$25,000.000
|
$12,500.000
|
$9,535.810
|
$27,580.040
|
$8,037.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,680.000
|
$32.000
|
$45.110
|
$28.000
|
$28.000
|
$43.930
|
$28.000
|
$38.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,680.000
|
$25.000
|
$14.200
|
$10.000
|
$10.000
|
$13.830
|
$10.000
|
$11.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,776.000
|
$35.000
|
$44.180
|
$27.000
|
$27.000
|
$43.020
|
$27.000
|
$34.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,776.000
|
$11.800
|
$12.140
|
$10.000
|
$10.000
|
$11.820
|
$10.000
|
$11.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
33,043.000
|
$2.750
|
$3.670
|
$2.880
|
$2.880
|
$3.570
|
$2.880
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
33,043.000
|
$1.000
|
$0.820
|
$0.750
|
$0.750
|
$0.800
|
$0.750
|
$0.550
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
420.000
|
$5.000
|
$6.820
|
$4.250
|
$4.250
|
$6.640
|
$4.250
|
$5.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
420.000
|
$1.500
|
$1.360
|
$1.000
|
$1.000
|
$1.320
|
$1.000
|
$1.100
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,243.000
|
$70.000
|
$107.630
|
$115.000
|
$130.920
|
$69.680
|
$105.300
|
$124.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
21,090.000
|
$50.000
|
$48.970
|
$44.000
|
$29.740
|
$65.000
|
$41.430
|
$84.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
25,290.000
|
$15.000
|
$5.180
|
$6.000
|
$6.070
|
$7.000
|
$9.930
|
$3.500
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
21,090.000
|
$12.000
|
$10.870
|
$9.000
|
$4.170
|
$10.000
|
$13.040
|
$6.500
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
16,242.000
|
$110.000
|
$71.430
|
$73.000
|
$74.470
|
$66.000
|
$88.260
|
$95.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
7,098.000
|
$6.500
|
$5.000
|
$3.000
|
$8.750
|
$6.860
|
$5.180
|
$4.500
|
|
|
CONC SIDEWALKS (4")
|
SY
|
2,802.000
|
$90.000
|
$48.190
|
$65.000
|
$66.150
|
$97.610
|
$60.950
|
$74.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
8.000
|
$2,100.000
|
$2,193.210
|
$2,500.000
|
$2,704.490
|
$1,420.000
|
$3,462.610
|
$2,595.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
8.000
|
$2,100.000
|
$2,625.670
|
$2,500.000
|
$3,305.490
|
$1,700.000
|
$3,462.610
|
$2,538.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
4.000
|
$3,500.000
|
$5,251.350
|
$3,500.000
|
$3,004.990
|
$3,400.000
|
$3,463.110
|
$3,864.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
8.000
|
$3,300.000
|
$4,633.540
|
$3,500.000
|
$2,604.320
|
$3,000.000
|
$3,463.110
|
$5,133.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
31,748.000
|
$0.190
|
$0.360
|
$0.110
|
$1.000
|
$0.270
|
$0.540
|
$0.500
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,550.000
|
$35.000
|
$27.080
|
$26.000
|
$26.500
|
$29.000
|
$26.500
|
$30.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
15.000
|
$1,300.000
|
$1,021.720
|
$1,475.000
|
$1,000.000
|
$1,600.000
|
$1,000.000
|
$1,120.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
500.000
|
$2.500
|
$2.550
|
$3.000
|
$2.500
|
$4.000
|
$2.500
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$160.000
|
$204.340
|
$225.000
|
$200.000
|
$400.000
|
$200.000
|
$224.000
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
4.000
|
$250.000
|
$153.260
|
$225.000
|
$150.000
|
$300.000
|
$150.000
|
$168.000
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-3)
|
EA
|
2.000
|
$5,000.000
|
$2,578.900
|
$5,000.000
|
$3,420.000
|
$3,360.000
|
$5,000.000
|
$4,660.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
16,101.000
|
$6.000
|
$3.090
|
$4.750
|
$4.500
|
$10.400
|
$13.010
|
$3.500
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
2.000
|
$500.000
|
$257.890
|
$2,500.000
|
$375.000
|
$1,033.000
|
$2,500.000
|
$460.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
15.000
|
$3,100.000
|
$2,860.810
|
$2,725.000
|
$2,800.000
|
$2,950.000
|
$2,800.000
|
$3,137.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
9.000
|
$1,400.000
|
$1,238.750
|
$1,145.000
|
$1,168.370
|
$3,200.000
|
$1,513.710
|
$368.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
13.000
|
$1,200.000
|
$991.000
|
$765.000
|
$780.610
|
$1,200.000
|
$787.130
|
$368.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
13.000
|
$9,200.000
|
$7,164.640
|
$7,185.000
|
$7,331.630
|
$17,627.180
|
$9,203.380
|
$7,692.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
8.000
|
$1,500.000
|
$2,648.840
|
$2,408.750
|
$2,350.000
|
$2,350.000
|
$1,799.000
|
$2,680.400
|
|
|
IN RD IL (U/P) (TY 2) (150W EQ) LED
|
EA
|
8.000
|
$1,500.000
|
$2,874.270
|
$2,613.750
|
$2,550.000
|
$2,550.000
|
$1,885.000
|
$2,908.510
|
|
|
IN RD IL (TY SA) 40T-10 (250W EQ) LED
|
EA
|
27.000
|
$4,195.000
|
$6,312.130
|
$5,740.000
|
$5,600.000
|
$5,600.000
|
$4,150.000
|
$6,387.320
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
16,306.000
|
$15.000
|
$10.760
|
$9.790
|
$9.550
|
$9.550
|
$30.050
|
$10.890
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
4,735.000
|
$25.000
|
$14.410
|
$13.100
|
$12.780
|
$12.780
|
$33.950
|
$14.580
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
443.000
|
$40.000
|
$37.200
|
$33.820
|
$33.000
|
$33.000
|
$71.000
|
$37.640
|
|
|
CONDT (PVC) (SCH 40) (3") (STL ENCSE)
|
LF
|
105.000
|
$50.000
|
$28.180
|
$25.630
|
$25.000
|
$25.000
|
$240.000
|
$28.510
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
1,590.000
|
$30.000
|
$24.800
|
$22.550
|
$22.000
|
$22.000
|
$43.000
|
$25.090
|
|
|
CONDT (PVC) (SCH 40) (4") (BORE)
|
LF
|
787.000
|
$40.000
|
$43.960
|
$39.980
|
$39.000
|
$39.000
|
$74.000
|
$44.480
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
1,374.000
|
$27.000
|
$33.310
|
$30.290
|
$29.550
|
$29.550
|
$41.500
|
$33.700
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
951.000
|
$35.000
|
$42.830
|
$38.950
|
$38.000
|
$38.000
|
$46.050
|
$43.340
|
|
|
CONDT (RM) (1")
|
LF
|
977.000
|
$35.000
|
$31.560
|
$28.700
|
$28.000
|
$28.000
|
$42.050
|
$31.940
|
|
|
CONDT (RM) (2")
|
LF
|
24.000
|
$50.000
|
$47.340
|
$43.050
|
$42.000
|
$42.000
|
$39.150
|
$47.910
|
|
|
CONDT (RM) (3")
|
LF
|
66.000
|
$135.000
|
$60.870
|
$55.350
|
$54.000
|
$54.000
|
$65.600
|
$61.590
|
|
|
ELEC CONDR (NO.10) BARE
|
LF
|
3,321.000
|
$1.500
|
$1.300
|
$1.180
|
$1.150
|
$1.150
|
$1.900
|
$1.310
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
18,795.000
|
$1.500
|
$1.230
|
$1.120
|
$1.090
|
$1.090
|
$2.760
|
$1.240
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
39,516.000
|
$1.750
|
$2.090
|
$1.900
|
$1.850
|
$1.850
|
$2.150
|
$2.110
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
35,135.000
|
$2.000
|
$2.130
|
$1.940
|
$1.890
|
$1.890
|
$2.220
|
$2.160
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
189.000
|
$2.000
|
$2.990
|
$2.720
|
$2.650
|
$2.650
|
$3.600
|
$3.020
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
378.000
|
$2.300
|
$2.870
|
$2.610
|
$2.550
|
$2.550
|
$3.760
|
$2.910
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
1,182.000
|
$3.000
|
$4.230
|
$3.840
|
$3.750
|
$3.750
|
$2.800
|
$4.280
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
2,364.000
|
$3.300
|
$4.320
|
$3.930
|
$3.830
|
$3.830
|
$3.200
|
$4.370
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
33.000
|
$1,300.000
|
$1,765.900
|
$1,605.840
|
$1,566.670
|
$1,566.670
|
$1,740.000
|
$1,786.930
|
|
|
GROUND BOX TY D (162922)
|
EA
|
12.000
|
$1,050.000
|
$563.580
|
$512.500
|
$500.000
|
$500.000
|
$1,980.000
|
$570.300
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
37.000
|
$1,700.000
|
$2,101.830
|
$1,911.320
|
$1,864.700
|
$1,864.700
|
$2,638.000
|
$2,126.870
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)PS(U)
|
EA
|
2.000
|
$8,600.000
|
$10,144.490
|
$9,225.000
|
$9,000.000
|
$9,000.000
|
$13,140.000
|
$10,265.340
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
|
EA
|
2.000
|
$9,000.000
|
$10,313.570
|
$9,378.750
|
$9,150.000
|
$9,150.000
|
$12,200.000
|
$10,436.430
|
|
|
ELC SRV TY D 120/240 070(NS)SS(N)SP(O)
|
EA
|
10.000
|
$5,500.000
|
$9,997.960
|
$9,091.750
|
$8,870.000
|
$8,870.000
|
$11,975.000
|
$10,117.070
|
|
|
ELC SRV TY D 120/240 070(NS)SS(N)SP(U)
|
EA
|
1.000
|
$5,000.000
|
$10,088.130
|
$9,173.750
|
$8,950.000
|
$8,950.000
|
$12,610.000
|
$10,208.310
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
1,568.000
|
$35.000
|
$33.550
|
$0.010
|
$28.000
|
$33.000
|
$27.550
|
$22.220
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
922.000
|
$35.000
|
$42.700
|
$43.050
|
$26.000
|
$42.000
|
$29.650
|
$42.420
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
1,339.000
|
$35.000
|
$35.580
|
$35.880
|
$26.000
|
$35.000
|
$32.600
|
$32.030
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
8.000
|
$780.000
|
$771.570
|
$565.000
|
$565.000
|
$759.000
|
$869.000
|
$570.700
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
28.000
|
$975.000
|
$828.500
|
$625.000
|
$730.000
|
$815.000
|
$1,011.000
|
$631.300
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
2.000
|
$940.000
|
$846.790
|
$625.000
|
$705.000
|
$833.000
|
$922.000
|
$631.300
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
13.000
|
$970.000
|
$864.080
|
$715.000
|
$795.000
|
$850.000
|
$999.000
|
$722.210
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$840.000
|
$811.720
|
$625.000
|
$660.000
|
$798.500
|
$1,101.000
|
$631.310
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
4.000
|
$1,000.000
|
$991.150
|
$715.000
|
$1,250.000
|
$975.000
|
$1,780.000
|
$722.210
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
24.000
|
$1,400.000
|
$1,016.560
|
$700.000
|
$855.000
|
$1,000.000
|
$1,305.000
|
$707.060
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$1,500.000
|
$1,509.590
|
$825.000
|
$1,040.000
|
$1,485.000
|
$1,720.000
|
$833.320
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
|
EA
|
2.000
|
$1,500.000
|
$1,555.340
|
$915.000
|
$895.000
|
$1,530.000
|
$2,010.000
|
$924.230
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T)
|
EA
|
8.000
|
$1,200.000
|
$1,169.040
|
$915.000
|
$1,020.000
|
$1,150.000
|
$1,200.000
|
$924.230
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
4.000
|
$3,000.000
|
$2,399.080
|
$1,150.000
|
$2,150.000
|
$2,360.000
|
$2,900.000
|
$1,161.600
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(T-2EXT)
|
EA
|
8.000
|
$1,500.000
|
$2,607.470
|
$1,500.000
|
$2,240.000
|
$2,565.000
|
$2,475.000
|
$1,515.130
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
3.000
|
$2,370.000
|
$3,334.310
|
$4,000.000
|
$2,300.000
|
$3,280.000
|
$3,875.000
|
$3,313.080
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$600.000
|
$665.850
|
$475.000
|
$750.000
|
$700.000
|
$1,610.000
|
$479.790
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
16.000
|
$130.000
|
$111.820
|
$125.000
|
$75.000
|
$110.000
|
$302.000
|
$126.260
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
2,775.000
|
$7.250
|
$7.120
|
$7.180
|
$7.000
|
$7.000
|
$7.450
|
$7.070
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
4.000
|
$34,000.000
|
$46,721.050
|
$47,109.000
|
$45,960.000
|
$45,960.000
|
$33,810.000
|
$46,423.550
|
|
|
INS OH SN SUP(35 FT BAL TEE)
|
EA
|
2.000
|
$54,000.000
|
$49,750.400
|
$50,163.500
|
$48,940.000
|
$48,940.000
|
$64,275.000
|
$49,433.610
|
|
|
INS OH SN SUP(35 FT CANT)
|
EA
|
5.000
|
$38,000.000
|
$53,836.960
|
$54,284.000
|
$52,960.000
|
$52,960.000
|
$39,625.000
|
$53,494.160
|
|
|
SIGN WALKWAY (48 IN) WITH HNDRL
|
LF
|
16.000
|
$500.000
|
$665.850
|
$671.380
|
$655.000
|
$655.000
|
$210.000
|
$661.610
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
342.000
|
$25.000
|
$25.790
|
$18.000
|
$13.000
|
$27.000
|
$26.220
|
$13.710
|
|
|
INSTL OM ASSM (OM-4)(TWT)WAP
|
EA
|
16.000
|
$385.000
|
$46.420
|
$325.000
|
$415.000
|
$116.500
|
$50.000
|
$28.860
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
115.000
|
$115.000
|
$128.940
|
$45.000
|
$45.000
|
$116.500
|
$100.580
|
$28.860
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
|
EA
|
52.000
|
$125.000
|
$128.940
|
$55.000
|
$45.000
|
$128.000
|
$75.430
|
$28.860
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
48.000
|
$125.000
|
$128.940
|
$55.000
|
$47.000
|
$100.000
|
$84.600
|
$28.860
|
|
|
INSTL OM ASSM (OM-3L)(WFLX)GND)GND
|
EA
|
4.000
|
$350.000
|
$77.370
|
$425.000
|
$495.000
|
$554.000
|
$100.000
|
$28.860
|
|
|
INSTL OM ASSM (OM-3R)(WFLX)GND)GND
|
EA
|
4.000
|
$350.000
|
$77.370
|
$425.000
|
$495.000
|
$554.000
|
$423.790
|
$51.080
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
5,913.000
|
$1.000
|
$1.250
|
$0.950
|
$0.950
|
$1.200
|
$1.910
|
$1.210
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
32,365.000
|
$1.000
|
$1.100
|
$0.950
|
$0.950
|
$1.060
|
$0.900
|
$1.070
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
52.000
|
$6.000
|
$5.200
|
$12.000
|
$12.000
|
$5.000
|
$18.050
|
$5.050
|
|
|
WK ZN PAV MRK REMOV (Y)4"(DOT)
|
LF
|
25.000
|
$2.000
|
$2.080
|
$0.950
|
$0.950
|
$2.000
|
$13.800
|
$2.020
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
29,232.000
|
$0.800
|
$1.100
|
$0.950
|
$0.950
|
$1.060
|
$0.900
|
$1.070
|
|
|
WK ZN PAV MRK REMOV (W)12"(DOT)
|
LF
|
803.000
|
$4.000
|
$2.080
|
$2.750
|
$2.750
|
$2.000
|
$4.990
|
$2.020
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
237.000
|
$1.650
|
$1.040
|
$1.250
|
$1.250
|
$1.000
|
$4.140
|
$1.010
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
16,680.000
|
$1.150
|
$0.790
|
$1.450
|
$1.450
|
$0.760
|
$1.180
|
$0.770
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
4,214.000
|
$3.950
|
$2.380
|
$2.750
|
$2.750
|
$2.290
|
$3.930
|
$2.310
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
438.000
|
$7.000
|
$6.240
|
$5.800
|
$5.800
|
$6.000
|
$8.490
|
$6.060
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
38.000
|
$160.000
|
$123.810
|
$135.000
|
$135.000
|
$119.000
|
$166.690
|
$120.200
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
12.000
|
$300.000
|
$155.030
|
$165.000
|
$165.000
|
$149.000
|
$315.340
|
$150.500
|
|
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
|
EA
|
15.000
|
$190.000
|
$208.090
|
$165.000
|
$165.000
|
$200.000
|
$212.350
|
$202.020
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
38.000
|
$190.000
|
$134.220
|
$175.000
|
$175.000
|
$129.000
|
$191.110
|
$130.300
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
7,900.000
|
$1.200
|
$0.670
|
$0.800
|
$0.800
|
$0.640
|
$1.310
|
$0.650
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
41,507.000
|
$0.370
|
$0.290
|
$0.550
|
$0.550
|
$0.280
|
$0.370
|
$0.280
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
38,507.000
|
$0.370
|
$0.290
|
$0.550
|
$0.550
|
$0.280
|
$0.370
|
$0.280
|
|
|
PAVEMENT SEALER 6"
|
LF
|
98,331.000
|
$0.200
|
$0.200
|
$0.250
|
$0.250
|
$0.190
|
$0.210
|
$0.190
|
|
|
PAVEMENT SEALER 8"
|
LF
|
16,680.000
|
$0.500
|
$0.220
|
$0.350
|
$0.350
|
$0.210
|
$0.450
|
$0.210
|
|
|
PAVEMENT SEALER 12"
|
LF
|
6,219.000
|
$1.000
|
$0.350
|
$0.500
|
$0.500
|
$0.340
|
$0.630
|
$0.340
|
|
|
PAVEMENT SEALER 24"
|
LF
|
1,578.000
|
$2.200
|
$0.570
|
$0.750
|
$0.750
|
$0.550
|
$1.590
|
$0.560
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
38.000
|
$40.000
|
$16.650
|
$20.000
|
$20.000
|
$16.000
|
$39.280
|
$16.160
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
38.000
|
$60.000
|
$16.650
|
$30.000
|
$30.000
|
$16.000
|
$57.330
|
$16.160
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
12.000
|
$45.000
|
$19.770
|
$30.000
|
$30.000
|
$19.000
|
$65.830
|
$19.190
|
|
|
PAVEMENT SEALER (NUMBER)
|
EA
|
15.000
|
$35.000
|
$20.810
|
$15.000
|
$15.000
|
$20.000
|
$46.720
|
$20.200
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
7,900.000
|
$0.680
|
$0.630
|
$0.990
|
$0.990
|
$0.610
|
$0.880
|
$0.620
|
|
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
|
LF
|
2,382.000
|
$2.550
|
$2.080
|
$3.200
|
$3.200
|
$2.000
|
$4.350
|
$2.020
|
|
PREFAB PAV MRK TY C (W)(24")(SLD) CNTST
|
LF
|
1,140.000
|
$10.000
|
$15.610
|
$14.000
|
$14.000
|
$15.000
|
$25.220
|
$15.150
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,720.000
|
$4.350
|
$3.720
|
$4.150
|
$4.150
|
$3.580
|
$5.310
|
$3.620
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
57,472.000
|
$0.400
|
$0.730
|
$0.540
|
$0.540
|
$0.700
|
$0.520
|
$0.710
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
98,331.000
|
$0.050
|
$0.210
|
$0.100
|
$0.100
|
$0.200
|
$0.160
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
16,680.000
|
$0.150
|
$0.230
|
$0.180
|
$0.180
|
$0.220
|
$0.270
|
$0.220
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
6,219.000
|
$0.500
|
$0.520
|
$0.400
|
$0.400
|
$0.500
|
$1.060
|
$0.510
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,578.000
|
$1.000
|
$0.520
|
$0.500
|
$0.500
|
$0.500
|
$2.020
|
$0.510
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
36.000
|
$20.000
|
$18.730
|
$15.000
|
$15.000
|
$18.000
|
$33.980
|
$18.180
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
12.000
|
$25.000
|
$24.970
|
$20.000
|
$20.000
|
$24.000
|
$44.590
|
$24.240
|
|
|
PAV SURF PREP FOR MRK (NUMBER)
|
EA
|
15.000
|
$30.000
|
$18.730
|
$20.000
|
$20.000
|
$18.000
|
$31.850
|
$18.180
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
144.000
|
$30.000
|
$18.730
|
$20.000
|
$20.000
|
$18.000
|
$48.840
|
$18.180
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
1,720.000
|
$0.800
|
$0.410
|
$0.200
|
$0.200
|
$0.390
|
$2.020
|
$0.390
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
60.000
|
$350.000
|
$337.920
|
$307.300
|
$299.800
|
$299.800
|
$693.000
|
$341.950
|
|
|
BACK PLATE (12")(2 SEC)
|
EA
|
30.000
|
$85.000
|
$174.710
|
$158.880
|
$155.000
|
$155.000
|
$308.000
|
$135.480
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
1,371.000
|
$4.000
|
$4.940
|
$4.490
|
$4.380
|
$4.380
|
$4.400
|
$4.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
|
LF
|
6,996.000
|
$7.000
|
$5.640
|
$5.130
|
$5.000
|
$5.000
|
$9.900
|
$7.470
|
|
|
PED POLE ASSEMBLY
|
EA
|
20.000
|
$10,000.000
|
$3,212.420
|
$2,921.250
|
$2,850.000
|
$2,850.000
|
$12,015.000
|
$3,250.690
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
30,446.000
|
$105.000
|
$95.030
|
$90.000
|
$96.350
|
$93.650
|
$93.650
|
$120.000
|
|
|
PATCHING MILLED CONCRETE RUMBLE STRIPS
|
LF
|
22,773.000
|
$7.000
|
$14.670
|
$8.710
|
$5.000
|
$19.090
|
$10.000
|
$4.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
1,496.000
|
$75.000
|
$146.490
|
$28.000
|
$15.310
|
$59.220
|
$64.960
|
$104.040
|
|
|
FIBER OPTIC CBL (MULTI-MODE)(6 FIBER)
|
LF
|
134.000
|
$5.000
|
$3.950
|
$3.590
|
$3.500
|
$3.500
|
$137.000
|
$3.990
|
|
|
FO CBL (12 SMF)(PIGTAIL)(INS ONLY)
|
LF
|
1,958.000
|
$100.000
|
$2.420
|
$2.200
|
$2.150
|
$2.150
|
$3.850
|
$2.450
|
|
|
FO CBL (24 SMF)(INS ONLY)
|
LF
|
1,700.000
|
$100.000
|
$2.680
|
$2.440
|
$2.380
|
$2.380
|
$4.450
|
$2.710
|
|
|
FO CBL (36 SMF)
|
LF
|
11,729.000
|
$4.200
|
$4.150
|
$3.770
|
$3.680
|
$3.680
|
$2.570
|
$4.200
|
|
|
FO CBL (72 SMF)
|
LF
|
39,268.000
|
$4.500
|
$5.070
|
$4.610
|
$4.500
|
$4.500
|
$2.920
|
$5.130
|
|
|
FO SPLICE ENCLOSURE (TYPE 1)
|
EA
|
14.000
|
$2,100.000
|
$5,275.130
|
$4,797.000
|
$4,680.000
|
$4,680.000
|
$2,485.000
|
$5,337.980
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
228.000
|
$69.000
|
$46.210
|
$42.030
|
$41.000
|
$41.000
|
$86.400
|
$46.760
|
|
|
PRETERM FIBER PATCH PANEL (12 POSITION)
|
EA
|
10.000
|
$1,400.000
|
$5,506.200
|
$5,007.130
|
$4,885.000
|
$4,885.000
|
$1,775.000
|
$5,571.800
|
|
|
PRETERM FIBER PATCH PANEL (24 POSITION)
|
EA
|
5.000
|
$1,840.000
|
$5,613.280
|
$5,104.500
|
$4,980.000
|
$4,980.000
|
$3,090.000
|
$5,680.160
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
4.000
|
$10,000.000
|
$11,271.650
|
$10,250.000
|
$10,000.000
|
$10,000.000
|
$9,410.000
|
$11,405.940
|
|
|
CCTV MOUNT (POLE)
|
EA
|
4.000
|
$650.000
|
$1,127.170
|
$1,025.000
|
$1,000.000
|
$1,000.000
|
$665.000
|
$1,140.590
|
|
|
ITS MULTI-DUCT CND (PVC-40)
|
LF
|
31,930.000
|
$26.000
|
$25.920
|
$23.580
|
$23.000
|
$23.000
|
$48.870
|
$26.230
|
|
|
ITS MULTI-DUCT CND (PVC-80)(BORE)
|
LF
|
3,278.000
|
$35.000
|
$44.470
|
$40.440
|
$39.450
|
$39.450
|
$62.350
|
$45.000
|
|
|
INSTALL DMS (POLE MTD CABINET)
|
EA
|
2.000
|
$20,000.000
|
$37,816.390
|
$34,388.750
|
$33,550.000
|
$33,550.000
|
$30,260.000
|
$38,266.920
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
2.000
|
$8,100.000
|
$10,138.850
|
$9,219.880
|
$8,995.000
|
$8,995.000
|
$10,450.000
|
$10,259.640
|
|
|
ITS RADIO (SNGL)(5 GHZ)-C-P
|
EA
|
2.000
|
$4,000.000
|
$4,001.440
|
$3,638.750
|
$3,550.000
|
$3,550.000
|
$8,455.000
|
$4,049.100
|
|
|
ITS POLE (40 FT)(90 MPH)
|
EA
|
5.000
|
$15,000.000
|
$18,350.250
|
$16,687.000
|
$16,280.000
|
$16,280.000
|
$11,425.000
|
$18,568.870
|
|
|
ITS POLE (60 FT)(90 MPH)
|
EA
|
4.000
|
$25,000.000
|
$20,908.920
|
$19,013.750
|
$18,550.000
|
$18,550.000
|
$22,055.000
|
$21,158.010
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)
|
EA
|
6.000
|
$6,500.000
|
$11,023.680
|
$10,024.500
|
$9,780.000
|
$9,780.000
|
$6,775.000
|
$11,155.010
|
|
|
ITS POLE MNT CAB (TY 3)(CONF 2)
|
EA
|
5.000
|
$6,500.000
|
$10,026.130
|
$9,117.380
|
$8,895.000
|
$8,895.000
|
$8,065.000
|
$10,145.580
|
|
|
DEAD END ROADWAY BARRICADE
|
LF
|
136.000
|
$165.000
|
$28.360
|
$145.000
|
$100.000
|
$131.850
|
$100.000
|
$133.070
|
|
|
TERMINAL SERVER (INSTALL ONLY)
|
EA
|
6.000
|
$180.000
|
$7,950.180
|
$1,588.750
|
$1,550.000
|
$1,550.000
|
$1,111.000
|
$5,155.480
|
|
|
TMA (STATIONARY)
|
DAY
|
181.000
|
$220.000
|
$200.640
|
$200.000
|
$40.820
|
$418.860
|
$177.160
|
$181.500
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
46.000
|
$220.000
|
$693.890
|
$800.000
|
$714.290
|
$827.760
|
$938.960
|
$451.350
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
19.000
|
$4,000.000
|
$5,094.790
|
$4,633.000
|
$4,520.000
|
$4,520.000
|
$5,640.000
|
$5,155.480
|
|
|
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
|
EA
|
12.000
|
$10,000.000
|
$6,255.770
|
$5,688.750
|
$5,550.000
|
$5,550.000
|
$8,080.000
|
$6,330.300
|
|
|
ITS RVSD (DATA COLLECT & WWA) SYS
|
EA
|
6.000
|
$12,700.000
|
$202,889.750
|
$18,450.000
|
$18,000.000
|
$18,000.000
|
$18,235.000
|
$205,306.880
|
|
|
INSTALL OF FIELD HARD ETHERNET SWITCH
|
EA
|
16.000
|
$3,500.000
|
$963.730
|
$876.380
|
$855.000
|
$855.000
|
$1,780.000
|
$975.210
|
|
|
HIGHWAY TRAFFIC SIGNALS
|
EA
|
2.000
|
$28,000.000
|
$48,468.110
|
$44,075.000
|
$43,000.000
|
$43,000.000
|
$61,930.000
|
$49,045.530
|
|
|
LED DECORATIVE ILLUMINATION ASSEMBLY
|
EA
|
8.000
|
$18,000.000
|
$14,472.800
|
$13,161.000
|
$12,840.000
|
$12,840.000
|
$12,680.000
|
$14,645.220
|
|
|
DECORATIVE TRF SIG POLE W/LUM (40' ARM)
|
EA
|
7.000
|
$39,000.000
|
$49,426.200
|
$44,946.250
|
$43,850.000
|
$43,850.000
|
$81,400.000
|
$50,015.040
|
|
|
DECORATIVE TRF SIG POLE W/LUM (48' ARM)
|
EA
|
1.000
|
$40,000.000
|
$51,054.940
|
$46,427.380
|
$45,295.000
|
$45,295.000
|
$87,560.000
|
$51,663.190
|
|
|
DECORATIVE TRF SIG POLE (40' ARM)
|
EA
|
2.000
|
$38,000.000
|
$40,408.880
|
$36,746.250
|
$35,850.000
|
$35,850.000
|
$73,810.000
|
$40,890.290
|
|
|
DECORATIVE TRF SIG POLE (44' ARM)
|
EA
|
2.000
|
$38,500.000
|
$43,869.270
|
$39,893.000
|
$38,920.000
|
$38,920.000
|
$76,780.000
|
$44,391.910
|
|
Totals: |
$57,955,584.700
|
$54,398,492.236
|
$54,770,185.769
|
$54,880,540.240
|
$56,779,253.998
|
$62,877,162.952
|
$63,536,485.090
|