Show Job Controls
Bid Cobra

PANOLA US 79 (0246-02-050)

Items: 81

County: PANOLA
Length: N/A
Highway: US 79
District: ATLANTA
Control Number: 0246-02-050
DBE Goal: N/A
Project: STP 2020(497)
Guaranty: N/A
Time: 262 WORKING DAYS
Engineer's Estimate: $14,992,431.63
Date: 03/05/2020 (6 years ago)
Contract Number: N/A
Type: WIDENING, CMT TREAT SUBGRADE, ACP SURFACE AND PM
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$14,992,431.63
$13,343,182.17
Over/Under Est: -11% -$1,649,249.46
Over/Under Est: -10.12% -$1,516,893.42
Amt Left: 0.99% $132,356.04
$13,633,330.78
Over/Under Est: -9.07% -$1,359,100.85
Amt Left: 2.17% $290,148.61
Delta: -1.17% -$157,792.57
$14,206,150.32
Over/Under Est: -5.24% -$786,281.31
Amt Left: 6.47% $862,968.15
Delta: -4.20% -$572,819.54

Bid Items & Bid Tabulations

81 Total 0 of 81
PANOLA  |  US 79  |  ATLANTA  |  0246-02-050  |  03/05/2020  |  $14,992,431.63  |  STP 2020(497)  |  WIDENING, CMT TREAT SUBGRADE, ACP S...  |  262 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
MADDEN CONTRACTING COMPANY, LLC.
EAST TEXAS BRIDGE, INC.
H. V. CAVER, INC.
PREPARING ROW
AC 10.500 $6,000.000 $10,000.000 $8,190.000 $15,000.000 $6,000.000
PREP ROW (TREE)(GREATER THAN 24" DIA)
EA 5.000 $1,500.000 $1,600.000 $1,575.000 $2,000.000 $1,200.000
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 19.000 $750.000 $300.000 $278.250 $300.000 $300.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 317.000 $9.450 $10.000 $15.000 $8.000 $19.250
REMOVING CONCRETE(MOW STRIP)
LF 1,635.000 $8.150 $7.500 $10.000 $9.000 $13.250
SUBGRADE WIDENING (ORD COMP)
STA 235.000 $210.000 $350.000 $176.000 $250.000 $210.000
BACKFILL (TY A)
STA 234.000 $181.160 $220.000 $500.000 $250.000 $210.000
BLADING
STA 235.000 $150.000 $190.000 $71.000 $150.000 $300.000
FURNISHING AND PLACING TOPSOIL (4")
STA 234.000 $660.000 $120.000 $71.000 $225.000 $530.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 43,985.000 $0.750 $0.750 $0.720 $0.750 $0.750
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 21,993.000 $0.750 $0.650 $0.670 $0.630 $0.680
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 21,993.000 $0.750 $0.650 $0.680 $0.630 $0.680
VEGETATIVE WATERING
MG 704.000 $8.680 $18.000 $10.000 $12.000 $10.000
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 13,055.600 $12.000 $15.000 $15.130 $22.000 $17.550
FL BS (CMP IN PLACE)(TY E GR 4)(4")
SY 13,055.600 $12.000 $7.000 $1.430 $6.000 $4.600
CEMENT
TON 3,643.000 $152.000 $162.000 $152.000 $155.000 $153.000
CEMENT TRT (MX EXST MTL & NW BS)(10")
SY 142,649.000 $2.900 $3.500 $2.970 $2.000 $3.000
PRIME COAT (MC-30)
GAL 35,662.000 $5.000 $3.500 $3.620 $4.000 $4.500
ASPH (TIER I)
GAL 74,302.000 $3.320 $3.000 $3.300 $3.150 $3.720
AGGR(TY-PB GR-4 SAC-A)
CY 1,930.000 $110.000 $110.000 $122.000 $110.000 $134.900
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 26,374.000 $131.120 $120.000 $132.500 $137.000 $132.950
TACK COAT
GAL 22,269.000 $2.500 $3.500 $2.000 $2.500 $2.100
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 160.900 $120.000 $160.000 $200.000 $100.000 $85.000
PLAN ASPH CONC PAV(0" TO 2.25")
SY 1,956.000 $4.000 $5.500 $2.300 $7.000 $6.500
PLANE ASPH CONC PAV (2" TO 6")
SY 130,412.800 $4.500 $1.700 $3.250 $3.500 $2.340
CONC STR REPAIR (EPOXY MORTAR)
SF 1,092.000 $226.700 $130.000 $50.000 $140.000 $130.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 3.000 $91.210 $620.000 $1,000.000 $600.000 $600.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 59.000 $355.810 $300.000 $500.000 $300.000 $280.000
RIPRAP (MOW STRIP)(4 IN)
CY 80.000 $472.550 $450.000 $525.000 $450.000 $450.000
RETROFIT RAIL (ADD HSS)
LF 743.300 $76.750 $80.000 $100.000 $130.000 $70.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 6.000 $725.000 $530.000 $750.000 $800.000 $450.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 4.000 $715.000 $660.000 $900.000 $800.000 $600.000
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 2.000 $6,472.390 $7,000.000 $10,000.000 $6,000.000 $8,000.000
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
EA 1.000 $5,743.000 $7,200.000 $10,000.000 $6,000.000 $12,000.000
MOBILIZATION
LS 1.000 $1,300,000.000 $900,000.000 $452,000.000 $550,000.000 $1,072,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 20.000 $5,000.000 $6,000.000 $2,000.000 $10,000.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 896.000 $26.400 $35.000 $29.000 $33.000 $30.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 1,747.000 $50.000 $40.000 $59.000 $65.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 1,736.000 $10.390 $6.000 $15.000 $15.000 $15.150
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,800.000 $2.680 $4.500 $2.500 $3.000 $2.550
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,800.000 $1.000 $1.500 $1.150 $1.150 $1.200
CONC CURB (TY II)
LF 317.000 $14.820 $15.000 $30.000 $40.000 $60.000
DRIVEWAYS (CONC)
SY 550.000 $90.000 $75.000 $100.000 $80.000 $100.000
DRIVEWAYS (ACP)
SY 3,591.000 $40.000 $42.000 $40.000 $18.000 $50.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 131,956.000 $0.250 $0.130 $0.100 $0.200 $0.110
MTL W-BEAM GD FEN (TIM POST)
LF 975.000 $21.730 $22.000 $20.000 $23.000 $21.500
MTL W-BEAM GD FEN (STEEL POST)
LF 125.000 $73.300 $28.000 $70.000 $80.000 $95.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,621.330 $2,000.000 $1,350.000 $1,600.000 $2,000.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 2.000 $945.000 $1,300.000 $1,000.000 $1,100.000 $1,050.000
REMOVE METAL BEAM GUARD FENCE
LF 1,250.000 $2.580 $3.000 $2.000 $2.500 $3.800
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $307.500 $260.000 $150.000 $200.000 $255.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,627.270 $3,000.000 $2,475.000 $2,600.000 $2,600.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $289.970 $310.000 $200.000 $230.000 $260.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 8.000 $290.000 $330.000 $325.000 $400.000 $269.790
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $466.890 $680.000 $650.000 $700.000 $615.000
MAILBOX INSTALL-S (TWW-POST) TY 1
EA 101.000 $215.000 $300.000 $290.000 $300.000 $238.330
REMOVE SM RD SN SUP&AM
EA 1.000 $200.000 $160.000 $150.000 $200.000 $125.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 74.000 $19.620 $22.000 $15.000 $20.000 $30.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 50.000 $100.000 $50.000 $50.000 $70.000 $60.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 18.000 $23.060 $30.000 $35.000 $40.000 $47.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 240,281.000 $0.200 $0.130 $0.120 $0.110 $0.130
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 209,480.000 $0.200 $0.130 $0.120 $0.110 $0.130
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,427.000 $1.250 $0.700 $1.000 $1.500 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 11,335.000 $1.340 $0.700 $1.000 $1.500 $1.000
PREFAB PAV MRK TY C (W) (8") (SLD)
LF 521.000 $5.500 $4.500 $4.200 $4.400 $4.210
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 125.000 $15.000 $12.000 $11.000 $16.000 $12.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $230.000 $220.000 $200.000 $220.000 $220.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $260.000 $310.000 $290.000 $330.000 $300.000
REFL PAV MRKR TY I-C
EA 193.000 $3.250 $3.100 $2.900 $5.000 $3.000
REFL PAV MRKR TY II-A-A
EA 2,557.000 $3.250 $3.100 $2.900 $3.500 $3.000
ELIM EXT PAV MRK & MRKS (4")
LF 29,362.000 $0.470 $0.350 $0.300 $0.270 $0.310
SP MIXES SP-C SAC-A PG76-22
TON 51,933.000 $110.460 $100.000 $108.500 $100.000 $105.000
TACK COAT
GAL 40,319.000 $2.500 $3.500 $2.000 $2.000 $2.100
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,500.000 $13,000.000 $18,300.000 $15,000.000 $15,000.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 13,196.000 $3.000 $4.000 $3.500 $4.000 $3.540
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
LF 131,956.000 $0.500 $0.550 $0.520 $0.660 $0.530
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
LF 15,125.000 $0.530 $0.550 $0.520 $0.660 $0.530
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
LF 109,268.000 $0.510 $0.550 $0.520 $0.660 $0.530
REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)
LF 9,016.000 $0.510 $0.550 $0.520 $0.660 $0.530
TMA (STATIONARY)
DAY 262.000 $200.000 $250.000 $150.000 $200.000 $100.000
TMA (MOBILE OPERATION)
HR 120.000 $50.000 $77.000 $1.000 $30.000 $25.500
Totals: $14,992,431.635 $13,343,182.170 $13,475,538.226 $13,633,330.780 $14,206,150.322