Show Job Controls
Bid Cobra

PALO PINTO CR (0902-39-029)

Items: 44

County: PALO PINTO
Length: N/A
Highway: CR
District: FORT WORTH
Control Number: 0902-39-029
DBE Goal: N/A
Project: BR 2022(022)
Guaranty: N/A
Time: 64 WORKING DAYS
Engineer's Estimate: $691,302.90
Date: 08/03/2023 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
KOREY COBURN
THOMAS MARQUARDT
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$691,302.90
$724,492.00
Over/Under Est: 4.8% $33,189.10
Over/Under Est: 38.24% $264,362.60
Amt Left: 31.91% $231,173.50
Over/Under Est: 96.24% $665,305.25
Amt Left: 87.25% $632,116.15
Delta: -41.95% -$400,942.65
Subcontractor Percentage Amount
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.00% $0.00
AWP SAFETY 0.00% $0.00
MORRIS COUNTY CONTRACTORS, L.L.C. 0.00% $0.00
HODGES AND SON CONSTRUCTION COMPANY, INC. 0.00% $0.00
PEACHTREE CONSTRUCTION, LTD. 0.00% $0.00
STRIPE-A-ZONE, LLC 0.00% $0.00
TORO BRAVO CONSTRUCTION, LLC 0.00% $0.00
Total: 0.00% $0.00

Bid Items & Bid Tabulations

44 Total 0 of 44
PALO PINTO  |  CR  |  FORT WORTH  |  0902-39-029  |  08/03/2023  |  $691,302.90  |  BR 2022(022)  |  BRIDGE REPL  |  64 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PMCO CONSTRUCTION LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
STERLING DELAWARE HOLDING COMPANY
PREPARING ROW
STA 3.850 $5,000.000 $3,000.000 $27,000.000 $16,883.000
REMOVE STAB BASE & ASPH PAV (4"-5")
SY 339.000 $19.000 $20.000 $40.000 $19.000
EXCAVATION (ROADWAY)
CY 202.000 $16.000 $28.000 $35.000 $170.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 32.000 $30.000 $60.000 $150.000 $51.000
COMPOST MANUF TOPSOIL (4")
SY 376.000 $5.000 $7.700 $10.000 $22.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 1,186.000 $2.500 $3.400 $2.000 $2.150
CELL FBR MLCH SEED(TEMP)(WARM)
SY 593.000 $2.500 $3.600 $4.000 $3.900
CELL FBR MLCH SEED(TEMP)(COOL)
SY 593.000 $2.000 $3.600 $4.000 $3.900
VEGETATIVE WATERING
MG 42.000 $50.000 $50.000 $1.000 $61.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 698.000 $35.000 $34.000 $50.000 $44.000
PRIME COAT (MULTI OPTION)
GAL 204.000 $6.000 $32.000 $25.000 $20.000
CEM STABIL BKFL
CY 47.300 $223.000 $255.000 $300.000 $422.000
DRILL SHAFT (24 IN)
LF 174.000 $270.000 $345.000 $265.000 $320.000
CL C CONC (ABUT)(HPC)
CY 17.600 $1,500.000 $1,400.000 $2,400.000 $4,100.000
CL C CONC (CAP)(HPC)
CY 13.200 $1,700.000 $2,200.000 $2,200.000 $4,500.000
CL C CONC (COLUMN)(HPC)
CY 7.000 $1,500.000 $1,800.000 $2,500.000 $5,000.000
REINF CONC SLAB (HPC)
SF 2,210.000 $28.000 $30.000 $30.000 $70.000
APPROACH SLAB (HPC)
CY 38.500 $1,000.000 $700.000 $1,200.000 $1,350.000
PRESTR CONC SLAB BEAM (5SB12)
LF 417.500 $299.000 $229.000 $295.000 $390.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 477.000 $220.000 $145.000 $160.000 $283.000
RIPRAP (MOW STRIP)(5 IN)
CY 20.000 $500.000 $750.000 $800.000 $1,040.000
RAIL (TY T223)(HPC)
LF 194.000 $175.000 $150.000 $160.000 $380.000
ARMOR JOINT (SEALED)
LF 48.000 $150.000 $170.000 $200.000 $345.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $20,500.000 $30,000.000 $25,000.000 $75,441.000
MOBILIZATION
LS 1.000 $6,777.200 $72,000.000 $82,000.000 $130,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $8,412.000 $3,500.000 $15,500.000 $10,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 130.000 $44.000 $39.000 $1.000 $36.950
ROCK FILTER DAMS (REMOVE)
LF 130.000 $16.000 $10.000 $1.000 $29.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 708.000 $3.600 $4.300 $1.000 $7.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 708.000 $1.000 $1.150 $1.000 $1.400
MTL W-BEAM GD FEN (TIM POST)
LF 100.000 $40.000 $35.500 $30.000 $30.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,600.000 $1,300.000 $2,000.000 $1,400.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,200.000 $3,300.000 $3,500.000 $3,500.000
WIRE FENCE (TY C)
LF 118.000 $33.000 $35.000 $25.000 $40.000
REMOVE SM RD SN SUP&AM
EA 8.000 $150.000 $100.000 $50.000 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $33.000 $40.500 $50.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 4.000 $37.000 $32.000 $50.000 $40.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 4.000 $115.000 $100.000 $250.000 $100.000
REFL PAV MRK TY II (W) 6" (SLD)
LF 250.000 $1.000 $12.400 $5.000 $2.000
REFL PAV MRK TY II (Y) 6" (SLD)
LF 250.000 $1.000 $1.900 $5.000 $2.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 771.000 $2.000 $3.500 $4.000 $2.500
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 770.000 $2.000 $3.510 $4.000 $2.500
PAV SURF PREP FOR MRK (6")
LF 500.000 $0.750 $0.700 $2.000 $1.500
SP MIXES SP-C SAC-A PG70-28
TON 173.000 $133.000 $250.000 $275.000 $244.500
Totals: $691,302.900 $724,492.000 $955,665.500 $1,356,608.150