Show Job Controls
Bid Cobra

ORANGE S BURTON RD (0920-30-090)

Items: 55

County: ORANGE
Length: 0.0000 MILES
Highway: S BURTON RD
District: BEAUMONT
Control Number: 0920-30-090
DBE Goal: 0.0%
Project: BR 2024(171)
Guaranty: $36,000.00
Time: 216 WORKING DAYS
Engineer's Estimate: $1,780,484.90
Date: 05/07/2026 (4 weeks ago)
Contract Number: 5263222
Type: BRIDGE REPLACEMENT
Project ID: A00178374
Contract Type: Federal
Project Description: S BURTON RD @ SANDY CREEK BRIDGE REPLACEMENT (STR#201810AA0237001)
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
BRYCE BROUSSARD
JIM GRISSOM
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,780,484.90
$1,783,411.33
Over/Under Est: 0.16% $2,926.43
Over/Under Est: 10.79% $192,095.60
Amt Left: 10.61% $189,169.17
Over/Under Est: 16.13% $287,106.25
Amt Left: 15.93% $284,179.82
Delta: -4.82% -$95,010.65

Bid Items & Bid Tabulations

55 Total 0 of 55
ORANGE  |  S BURTON RD  |  BEAUMONT  |  0920-30-090  |  05/07/2026  |  $1,780,484.90  |  BR 2024(171)  |  BRIDGE REPL  |  216 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SKYLINE BRIDGE LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
GARRET SHIELDS INFRASTRUCTURE
PREPARING ROW
STA 12.100 $2,000.000 $1,500.000 $7,520.000 $1,000.000
RMV (3"-7") TRT/UNTRT BASE & ASPH PAV
SY 1,329.000 $8.000 $8.000 $2.000 $10.000
RMV (6"-10") TRT/UNTRT BASE & ASPH PAV
SY 907.000 $4.500 $14.000 $25.000 $10.000
EXCAV (ROADWAY)
CY 522.000 $12.000 $14.500 $15.000 $30.000
EXCAV (CHANNEL)
CY 710.000 $25.000 $12.000 $15.000 $30.000
EMBANK (FNL)(OC)(TY C)
CY 1,368.000 $40.000 $30.000 $25.000 $40.000
EMBANK (FNL)(DC)(TY C)
CY 391.000 $20.000 $45.000 $25.000 $40.000
BROADCAST SEED (PERM_RURAL_SAND)
SY 3,172.000 $1.000 $1.250 $2.000 $0.150
BROADCAST SEED (PERM_URBAN_SAND)
SY 655.000 $1.400 $1.600 $2.000 $0.250
BROADCAST SEED (PERM_URBAN_CLAY)
SY 656.000 $1.400 $1.600 $2.000 $0.100
VEGETATIVE WATERING
TGL 31.000 $25.000 $1.000 $1.000 $50.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 561.000 $80.000 $175.000 $130.000 $130.000
PRIME COAT (AE-P)
GAL 577.000 $8.000 $22.000 $10.000 $5.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 1,190.000 $3.500 $16.000 $15.000 $5.000
AGGR (TY-PB OR PL, GR-4)(SAC-A)
CY 31.000 $500.000 $1,500.000 $1,500.000 $300.000
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 385.000 $140.000 $375.000 $200.000 $200.000
TACK COAT
GAL 174.000 $4.000 $10.000 $8.000 $20.000
CEM STABIL BKFL
CY 177.000 $130.000 $250.000 $300.000 $200.000
DRILL SHAFT (24 IN)
LF 828.000 $200.000 $165.000 $190.000 $200.000
DRILL SHAFT (30 IN)
LF 348.000 $350.000 $205.000 $260.000 $300.000
CL C CONC (ABUT)
CY 69.000 $1,200.000 $1,200.000 $1,600.000 $1,000.000
REINF CONC SLAB (BOX BEAM)
SF 1,832.000 $45.000 $22.000 $28.000 $30.000
REINF CONC SLAB (SLAB BEAM)
SF 2,804.000 $31.000 $21.000 $28.000 $30.000
APPROACH SLAB
CY 123.000 $725.000 $775.000 $800.000 $1,000.000
SHEAR KEY
CY 18.700 $725.000 $600.000 $800.000 $1,000.000
PRESTR CONC SLAB BEAM (5SB15)
LF 545.000 $275.000 $340.000 $320.000 $300.000
PRESTR CONC BOX BEAM (4B28)
LF 278.000 $425.000 $400.000 $380.000 $400.000
PRESTR CONC BOX BEAM (5B28)
LF 139.000 $365.000 $335.000 $380.000 $500.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 275.000 $190.000 $167.000 $250.000 $200.000
RAIL (TY T223)
LF 428.000 $100.000 $116.000 $180.000 $150.000
ARMOR JOINT (SEALED)
LF 163.000 $150.000 $100.000 $180.000 $200.000
RC PIPE (CL III)(18 IN)
LF 20.000 $90.000 $90.000 $80.000 $80.000
RC PIPE (CL III)(24 IN)
LF 20.000 $110.000 $110.000 $85.000 $120.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,200.000 $930.000 $3,000.000 $1,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $2,000.000 $1,350.000 $3,000.000 $2,500.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 3.000 $20,000.000 $11,500.000 $20,000.000 $25,000.000
REMOV STR (PIPE)
EA 2.000 $600.000 $150.000 $500.000 $1,000.000
MOBILIZATION
LS 1.000 $100,000.000 $150,000.000 $175,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $5,000.000 $1,745.000 $4,000.000 $20,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 21.000 $175.000 $124.750 $75.000 $100.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 232.000 $50.000 $10.000 $1.000 $20.000
ROCK FILTER DAMS (REMOVE)
LF 232.000 $20.000 $1.000 $1.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,511.000 $8.000 $3.000 $1.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,511.000 $6.000 $1.000 $1.000 $1.000
DRIVEWAYS (BASE)
SY 148.000 $35.000 $65.700 $70.000 $30.000
MTL W-BEAM GD FEN (TIM POST)
LF 262.500 $25.000 $25.750 $25.000 $18.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 9.000 $2,050.000 $1,725.000 $1,600.000 $1,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,500.000 $1,450.000 $1,600.000 $1,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $3,500.000 $3,300.000 $3,500.000 $3,500.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
EA 2.000 $30,000.000 $24,000.000 $10,000.000 $18,000.000
RELOCATE EXISTING MAILBOX
EA 3.000 $400.000 $250.000 $500.000 $500.000
REMOVE SM RD SN SUP&AM
EA 6.000 $105.000 $100.000 $50.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 6.000 $30.000 $25.000 $40.000 $10.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 12.000 $40.000 $50.000 $40.000 $30.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 2.000 $30.000 $25.000 $500.000 $10.000
Totals: $1,780,484.900 $1,783,411.325 $1,972,580.500 $2,067,591.150
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (NON-PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $10,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
Total: $30,000.00