Show Job Controls
Bid Cobra

ORANGE CS (0920-30-078)

Items: 45

County: ORANGE
Length: N/A
Highway: CS
District: BEAUMONT
Control Number: 0920-30-078
DBE Goal: N/A
Project: BR 2014(323)
Guaranty: N/A
Time: 339 WORKING DAYS
Engineer's Estimate: $4,298,083.07
Date: 01/08/2019 (7 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$4,298,083.07
$3,732,469.40
Over/Under Est: -13.16% -$565,613.67
Over/Under Est: -2.34% -$100,703.57
Amt Left: 12.46% $464,910.10
Over/Under Est: 1.24% $53,234.03
Amt Left: 16.58% $618,847.70
Delta: -3.67% -$153,937.60
Over/Under Est: 17.19% $738,665.83
Amt Left: 34.94% $1,304,279.50
Delta: -15.75% -$685,431.80
$5,691,869.00
Over/Under Est: 32.43% $1,393,785.93
Amt Left: 52.5% $1,959,399.60
Delta: -13.01% -$655,120.10
Over/Under Est: 86.86% $3,733,423.83
Amt Left: 115.18% $4,299,037.50
Delta: -41.10% -$2,339,637.90

Bid Items & Bid Tabulations

45 Total 0 of 45
ORANGE  |  CS  |  BEAUMONT  |  0920-30-078  |  01/08/2019  |  $4,298,083.07  |  BR 2014(323)  |  REPLACE BRIDGE AND APPROACHES  |  339 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RAGLE CONSTRUCTION, INC.
STATELINE CONSTRUCTION, LLC
TEXAS MATERIALS GROUP, INC.
JAY-REESE CONTRACTORS, INC.
MK CONSTRUCTORS
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
PREPARING ROW
STA 13.500 $2,900.000 $24,375.000 $1,800.000 $2,165.000 $5,000.000 $50,000.000 $1,000.000
REMOVING CONC (PAV)
SY 322.000 $6.500 $8.000 $12.000 $29.500 $30.000 $27.000 $8.000
EXCAVATION (ROADWAY)
CY 604.000 $15.000 $35.000 $14.000 $14.300 $40.000 $23.000 $28.500
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 573.000 $20.000 $20.000 $22.000 $29.500 $60.000 $30.000 $30.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 1,494.000 $0.310 $0.500 $1.000 $1.040 $1.100 $1.000 $2.500
CELL FBR MLCH SEED(TEMP)(WARM)
SY 1,494.000 $0.270 $0.500 $1.000 $1.040 $1.100 $1.000 $0.100
VEGETATIVE WATERING
MG 38.000 $20.000 $50.000 $100.000 $51.000 $30.000 $112.000 $25.000
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 1,205.000 $2.000 $1.500 $6.000 $1.400 $1.500 $2.000 $2.500
PRIME COAT (CSS-1H)
GAL 80.000 $5.000 $10.000 $22.000 $12.600 $10.000 $10.000 $9.000
D-GR HMA(SQ) TY-B PG64-22
TON 486.000 $80.000 $110.000 $185.000 $109.000 $120.000 $123.000 $137.000
D-GR HMA(SQ) TY-D SAC-A PG70-22
TON 206.000 $100.000 $120.000 $185.000 $160.000 $250.000 $253.000 $150.000
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
TON 55.000 $150.000 $120.000 $185.000 $250.000 $275.000 $281.000 $175.000
PLANE ASPH CONC PAV(0" TO 2")
SY 935.000 $3.000 $6.500 $13.000 $8.000 $10.000 $100.000 $3.000
CEM STABIL BKFL
CY 139.000 $150.000 $70.000 $290.000 $73.000 $100.000 $97.000 $150.000
SHEET PILING (PZ - 35)
SF 4,528.000 $69.000 $45.000 $62.000 $65.000 $96.000 $70.000 $50.000
PRESTR CONC PIL (20 IN SQ)
LF 3,235.000 $180.000 $95.000 $130.000 $120.000 $128.000 $273.000 $300.000
CL C CONC (ABUT)
CY 23.200 $1,100.000 $800.000 $1,110.000 $2,400.000 $2,450.000 $1,530.000 $3,000.000
CL C CONC (CAP)
CY 165.000 $1,700.000 $1,400.000 $1,675.000 $2,230.000 $2,500.000 $1,756.000 $2,000.000
CL C CONC (COPING)
CY 24.000 $670.000 $740.000 $875.000 $2,700.000 $2,650.000 $1,675.000 $3,000.000
REINF CONC SLAB (SLAB BEAM)
SF 22,808.000 $22.000 $14.000 $25.750 $33.500 $30.000 $27.000 $40.000
APPROACH SLAB
CY 48.000 $350.000 $330.000 $725.000 $1,275.000 $1,100.000 $665.000 $1,000.000
PRESTR CONC SLAB BEAM (4SB15)
LF 5,608.000 $250.000 $165.000 $195.000 $138.750 $180.000 $241.000 $300.000
RIPRAP (CONC)(5 IN)
CY 69.000 $450.000 $420.000 $520.000 $610.000 $1,000.000 $716.000 $300.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 123.000 $190.000 $140.000 $145.000 $230.000 $150.000 $180.000 $250.000
RAIL (TY T223)
LF 1,444.000 $96.000 $80.000 $115.000 $128.000 $220.000 $90.000 $250.000
ARMOR JOINT
LF 197.000 $100.000 $70.000 $95.000 $180.000 $80.000 $171.000 $300.000
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 1.000 $247,500.000 $600,000.000 $415,000.000 $631,000.000 $600,000.000 $316,000.000 $2,000,000.000
MOBILIZATION
LS 1.000 $381,978.000 $375,000.000 $420,000.000 $403,120.000 $500,000.000 $550,000.000 $775,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 23.000 $5,000.000 $850.000 $2,450.000 $600.000 $2,000.000 $475.000 $10,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,756.000 $4.000 $2.000 $3.000 $2.900 $3.100 $3.000 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,756.000 $1.200 $0.600 $1.000 $0.800 $1.000 $1.000 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 425.000 $22.000 $25.000 $28.000 $22.500 $25.000 $25.000 $21.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,980.000 $1,615.000 $1,885.000 $1,355.000 $1,500.000 $1,517.000 $1,450.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,300.000 $2,680.000 $3,110.000 $2,350.000 $2,600.000 $2,621.000 $2,875.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $450.000 $800.000 $500.000 $455.000 $500.000 $506.000 $1,400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $600.000 $900.000 $800.000 $510.000 $550.000 $563.000 $1,200.000
REMOVE SM RD SN SUP&AM
EA 5.000 $85.000 $100.000 $500.000 $76.000 $100.000 $84.000 $200.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 18.000 $25.000 $25.000 $300.000 $15.500 $20.000 $17.000 $45.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $25.000 $30.000 $50.000 $27.500 $30.000 $30.000 $45.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 1,500.000 $0.200 $0.250 $1.500 $0.260 $0.500 $0.300 $0.250
REFL PAV MRK TY II (Y) 4" (SLD)
LF 1,500.000 $0.320 $0.250 $1.500 $0.260 $0.500 $0.300 $0.250
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 2,457.000 $0.350 $0.900 $1.500 $0.940 $1.000 $1.000 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 2,670.000 $0.370 $0.900 $1.500 $0.940 $1.000 $1.000 $1.000
REFL PAV MRKR TY II-A-A
EA 66.000 $3.250 $10.000 $7.000 $10.050 $5.000 $11.000 $10.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 84.000 $50.000 $115.000 $110.000 $108.000 $75.000 $134.000 $90.000
Totals: $4,298,083.070 $3,732,469.400 $4,197,379.500 $4,351,317.100 $5,036,748.900 $5,691,869.000 $8,031,506.900