Bid Cobra

ORANGE FM 408 (0883-02-091)

Items: 50

County: ORANGE
Length: N/A
Highway: FM 408
District: BEAUMONT
Control Number: 0883-02-091
DBE Goal: N/A
Project: STP 2023(889)VRU
Guaranty: N/A
Time: 78 WORKING DAYS
Engineer's Estimate: $4,082,106.00
Date: 06/02/2023 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
BRYCE BROUSSARD
JIM GRISSOM
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$4,082,106.00
$4,993,301.06
Over/Under Est: 22.32% $911,195.06
Subcontractor Percentage Amount
J & M CONTRACTING, COMPANY 5.39% $276,920.30
AMERICAN REMEDIATION OPTIONS, INC. 2.01% $103,267.12
SK CONCRETE SERVICES LLC 0.91% $46,752.78
TEXAS MAINTENANCE AND CONSTRUCTION LLC 0.91% $46,752.78
TRP CONSTRUCTION GROUP, LLC 0.71% $36,477.44
BARRICADES UNLIMITED 0.29% $14,899.24
WEST TEXAS ROCK RESOURCES, LLC 0.16% $8,220.27
AWP SAFETY 0.13% $6,678.97
Total: 10.51% $539,968.90

Bid Items & Bid Tabulations

50 Total 0 of 50
ORANGE  |  FM 408  |  BEAUMONT  |  0883-02-091  |  06/02/2023  |  $4,082,106.00  |  STP 2023(889)VRU  |  HAZARD ELIM & SAFETY  |  78 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
REMOVING CONC (DRIVEWAYS)
SY 760.000 $20.000 $108.050
SUBGRADE WIDENING (ORD COMP)
STA 168.000 $2,000.000 $1,495.000
BACKFILL (TY A OR B)
STA 168.000 $500.000 $353.000
CELL FBR MLCH SEED(PERM)(URBAN)(SANDY)
SY 18,582.000 $1.000 $0.440
VEGETATIVE WATERING
MG 157.000 $20.000 $78.580
FL BS (CMP IN PLACE)(TYA GR1-2)(IN VEH)
CY 80.000 $200.000 $269.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 2,397.000 $125.000 $183.500
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 1,340.000 $5.000 $6.790
CUT AND RESTORE PAV (FLEX BASE)
SY 18.000 $130.000 $129.250
RIPRAP (MOW STRIP)(4 IN)
CY 45.000 $750.000 $1,100.000
RC PIPE (CL III)(18 IN)
LF 110.000 $100.000 $100.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 32.000 $1,000.000 $1,375.000
SET (TY II) (21 IN) (RCP) (6: 1) (P)
EA 17.000 $1,200.000 $2,310.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 3.000 $1,500.000 $2,860.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $1,800.000 $4,015.000
REMOV STR (PIPE)
LF 110.000 $15.000 $82.500
MOBILIZATION
LS 1.000 $500,000.000 $403,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $10,000.000 $7,500.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,000.000 $5.000 $7.150
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,000.000 $1.000 $1.650
INTRSCT, DRVWAYS, & TURNOUT (CONC)
SY 760.000 $120.000 $65.000
INTRSCT, DRVWAYS, & TURNOUT (ACP)
SY 1,937.000 $80.000 $68.000
RUMBLE STRIPS (SHOULDER)
LF 27,838.000 $1.000 $1.000
RUMBLE STRIPS (CENTERLINE)
LF 13,948.000 $1.000 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 525.000 $35.000 $28.600
REMOVE METAL BEAM GUARD FENCE
LF 525.000 $5.000 $3.300
REMOVE TERMINAL ANCHOR SECTION
EA 8.000 $200.000 $275.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,200.000 $3,190.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 49.000 $500.000 $357.500
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 3.000 $800.000 $742.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 35.000 $600.000 $632.500
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 6.000 $900.000 $984.500
REMOVE SM RD SN SUP&AM
EA 41.000 $100.000 $104.500
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BR)
EA 20.000 $30.000 $16.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,518.000 $5.000 $3.350
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 85.000 $1.000 $1.380
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 31,868.000 $0.500 $0.680
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 2,930.000 $0.500 $0.750
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 15,866.000 $0.500 $0.680
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 340.000 $50.000 $18.700
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 4.000 $150.000 $55.000
REFL PAV MRKR TY II-A-A
EA 380.000 $5.000 $6.600
JT / CRCK SEAL (HOT - POURED RUBBER)
LF 33,314.000 $10.000 $4.400
D-GR HMA TY-B PG64-22
TON 6,542.000 $130.000 $208.000
TACK COAT
GAL 892.000 $6.000 $20.000
SP MIXES SP-C SAC-A PG76-22
TON 6,131.000 $150.000 $240.000
TACK COAT
GAL 3,344.000 $6.000 $8.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $18,500.000
TMA (STATIONARY)
DAY 52.000 $350.000 $624.000
TMA (MOBILE OPERATION)
DAY 26.000 $350.000 $625.000
Totals: $4,082,106.000 $4,993,301.060