Show Job Controls
Bid Cobra

ORANGE FM 105 (0883-02-086)

Items: 38

County: ORANGE
Length: N/A
Highway: FM 105
District: BEAUMONT
Control Number: 0883-02-086
DBE Goal: N/A
Project: SSW 883-2-86
Guaranty: N/A
Time: 49 WORKING DAYS
Engineer's Estimate: $1,339,278.52
Date: 05/02/2018 (8 years ago)
Contract Number: N/A
Type: BS, ACP, MILLED RUMBLE STRIPS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$1,339,278.52
$1,139,721.42
Over/Under Est: -14.9% -$199,557.10
$1,469,219.37
Over/Under Est: 9.7% $129,940.85
Amt Left: 28.91% $329,497.95
$1,790,684.55
Over/Under Est: 33.71% $451,406.03
Amt Left: 57.12% $650,963.13
Delta: -21.88% -$321,465.18

Bid Items & Bid Tabulations

38 Total 0 of 38
ORANGE  |  FM 105  |  BEAUMONT  |  0883-02-086  |  05/02/2018  |  $1,339,278.52  |  SSW 883-2-86  |  BS, ACP, MILLED RUMBLE STRIPS  |  49 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
OLDCASTLE MATERIALS TEXAS, INC.
A. L. HELMCAMP, INC.
PTSS INVESTMENTS, LLC
SUBGRADE WIDENING (DENS CONT)
STA 128.790 $440.980 $175.000 $770.000 $300.000
BACKFILL (TY A OR B)
STA 128.790 $130.000 $83.000 $170.000 $210.000
CELL FBR MLCH SEED(TEMP)(WARM)
AC 2.640 $950.000 $1,360.000 $2,000.000 $1,500.000
VEGETATIVE WATERING
MG 215.040 $17.920 $21.500 $18.000 $25.000
FL BS (RDWY DEL) (TY D GR 1-2)
TON 3,682.000 $50.000 $40.000 $47.000 $45.000
CEMENT
TON 577.000 $200.000 $145.000 $170.000 $215.000
CEMENT TREAT (MX EXST MTL & NW BS)(8")
SY 40,068.000 $3.130 $3.300 $3.500 $5.000
PRIME COAT (RC-250)
GAL 8,013.000 $4.500 $3.600 $4.000 $6.000
ASPH (CRS-2P)
GAL 19,233.000 $3.550 $3.300 $3.000 $6.000
AGGR(TY-D GR-3 SAC-A)
CY 441.000 $167.650 $128.000 $65.000 $220.000
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 441.000 $225.000 $125.000 $65.000 $210.000
D-GR HMA TY-D PG64-22
TON 4,407.000 $75.000 $71.000 $95.000 $120.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
EA 2.000 $4,546.200 $3,650.000 $15,700.000 $5,005.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
EA 2.000 $7,176.160 $8,450.000 $28,000.000 $8,674.000
SET (TY II) (15 IN) (RCP) (6: 1) (P)
EA 2.000 $800.000 $1,420.000 $940.000 $1,067.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 4.000 $1,384.000 $1,435.000 $1,000.000 $1,067.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $850.000 $1,450.000 $1,100.000 $1,130.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 4.000 $1,850.000 $1,720.000 $1,200.000 $2,055.000
MOBILIZATION
LS 1.000 $105,335.000 $99,000.000 $130,000.000 $137,100.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $3,500.000 $990.000 $13,000.000 $7,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 600.000 $25.670 $26.500 $33.000 $25.000
ROCK FILTER DAMS (REMOVE)
LF 600.000 $7.660 $8.100 $3.000 $15.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 30.000 $6.000 $8.550 $15.000 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 30.000 $2.000 $3.600 $4.000 $4.000
DRIVEWAYS (ACP)
SY 38.670 $45.320 $88.000 $52.000 $50.000
DRIVEWAYS (BASE)
SY 299.780 $36.610 $30.000 $13.000 $50.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 25,179.000 $0.200 $0.250 $0.240 $0.400
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 12,450.000 $0.430 $0.220 $0.260 $0.400
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 10.000 $47.620 $46.000 $100.000 $70.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 14.000 $10.000 $10.100 $50.000 $40.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 4.000 $26.500 $27.500 $80.000 $50.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,862.000 $1.180 $1.900 $1.250 $1.250
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 30.000 $1.000 $1.220 $1.260 $1.350
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 25,758.000 $0.390 $0.310 $0.320 $0.350
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 2,580.000 $0.300 $0.360 $0.370 $0.450
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 11,555.000 $0.320 $0.340 $0.350 $0.450
REFL PAV MRKR TY II-A-A
EA 277.000 $2.640 $4.050 $4.200 $4.500
TMA (STATIONARY)
EA 2.000 $1,500.000 $3,600.000 $10,000.000 $26,000.000
Totals: $1,339,278.521 $1,139,721.420 $1,469,219.370 $1,790,684.550