ORANGE FM 1131 (0784-04-023)

Items: 48

County: ORANGE
Length: N/A
Highway: FM 1131
District: BEAUMONT
Control Number: 0784-04-023
DBE Goal: N/A
Project: STP 2019(623)HES
Guaranty: N/A
Time: 180 WORKING DAYS
Engineer's Estimate: $973,050.00
Date: 03/05/2019 (7 years ago)
Contract Number: N/A
Type: MODERNIZE BRIDGE RAIL,SAFETY TREAT FIXED OBJECTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$973,050.00
Over/Under Est: -7.75% -$75,416.00
Over/Under Est: 8.34% $81,181.00
Amt Left: 17.45% $156,597.00
Over/Under Est: 10.54% $102,594.60
Amt Left: 19.83% $178,010.60
Delta: -2.03% -$21,413.60
$1,175,880.00
Over/Under Est: 20.84% $202,830.00
Amt Left: 31% $278,246.00
Delta: -9.32% -$100,235.40
$1,310,282.00
Over/Under Est: 34.66% $337,232.00
Amt Left: 45.97% $412,648.00
Delta: -11.43% -$134,402.00
Over/Under Est: 35.73% $347,666.00
Amt Left: 47.13% $423,082.00
Delta: -0.80% -$10,434.00

Bid Items & Bid Tabulations

48 Total 0 of 48
ORANGE  |  FM 1131  |  BEAUMONT  |  0784-04-023  |  03/05/2019  |  $973,050.00  |  STP 2019(623)HES  |  MODERNIZE BRIDGE RAIL,SAFETY TREAT F...  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
NORMAN HIGHWAY CONSTRUCTORS, INC.
STATELINE CONSTRUCTION, LLC
WIDGEON CONSTRUCTION, INC.
MK CONSTRUCTORS
SJ&J CONSTRUCTION, LLC
CHAMPION INFRASTRUCTURE, LLC
REMOVING CONC (RIPRAP)
SY 17.000 $10.000 $60.000 $100.000 $89.000 $175.000 $40.000 $40.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 350.000 $20.000 $50.000 $35.000 $68.000 $28.000 $28.000 $32.000
BLOCK SODDING
SY 1,000.000 $5.000 $10.000 $7.000 $14.250 $5.000 $6.500 $9.000
VEGETATIVE WATERING
MG 16.800 $100.000 $110.000 $25.000 $300.000 $225.000 $40.000 $60.000
CUT & RESTORE ASPH PAVING
SY 28.000 $100.000 $100.000 $95.000 $223.500 $140.000 $100.000 $80.000
CUT AND RESTORE PAV (FLEX BASE)
SY 424.000 $60.000 $32.000 $55.000 $48.000 $35.000 $60.000 $60.000
RIPRAP (CONC)(4 IN)
CY 120.000 $450.000 $460.000 $595.000 $530.000 $520.000 $800.000 $860.000
RIPRAP (MOW STRIP)(4 IN)
CY 100.000 $450.000 $460.000 $525.000 $535.000 $420.000 $900.000 $680.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 48.000 $600.000 $500.000 $595.000 $1,088.000 $630.000 $1,200.000 $590.000
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
LF 16.000 $800.000 $770.000 $925.000 $1,970.000 $1,075.000 $1,600.000 $790.000
RC PIPE (CL III)(15 IN)
LF 4.000 $200.000 $104.000 $140.000 $189.700 $300.000 $60.000 $210.000
RC PIPE (CL III)(18 IN)
LF 2,222.000 $60.000 $91.000 $48.000 $58.000 $95.000 $80.000 $52.000
RC PIPE (CL III)(24 IN)
LF 202.000 $75.000 $102.000 $85.000 $73.000 $125.000 $105.000 $82.000
RC PIPE (CL III)(36 IN)
LF 12.000 $120.000 $154.000 $195.000 $152.000 $200.000 $400.000 $290.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $5,000.000 $3,000.000 $9,500.000 $6,774.000 $5,285.000 $6,000.000 $4,000.000
INLET (COMPL)(PSL)(FG)(5FTX6FT-4FTX4FT)
EA 2.000 $7,500.000 $4,900.000 $10,250.000 $7,950.000 $5,650.000 $10,000.000 $5,854.000
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $12,000.000 $12,000.000 $14,500.000 $16,625.000 $16,900.000 $12,000.000 $11,500.000
WINGWALL (PW - 2) (HW=6 FT)
EA 2.000 $14,000.000 $14,000.000 $19,545.000 $15,720.000 $18,600.000 $14,000.000 $16,000.000
SET (TY II) (15 IN) (RCP) (3: 1) (C)
EA 1.000 $1,000.000 $640.000 $650.000 $991.000 $1,400.000 $900.000 $1,200.000
SET (TY II) (15 IN) (RCP) (6: 1) (P)
EA 10.000 $1,200.000 $640.000 $650.000 $991.000 $2,000.000 $900.000 $1,400.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 9.000 $1,000.000 $640.000 $650.000 $991.000 $1,900.000 $1,200.000 $1,600.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 1.000 $1,200.000 $672.000 $650.000 $1,020.000 $1,475.000 $1,200.000 $1,800.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 216.000 $800.000 $732.000 $685.000 $1,080.000 $1,150.000 $1,200.000 $1,600.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 13.000 $1,000.000 $762.000 $1,250.000 $1,125.000 $1,400.000 $1,700.000 $1,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 18.000 $1,350.000 $1,200.000 $1,350.000 $1,410.000 $2,200.000 $1,700.000 $2,800.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $2,000.000 $3,700.000 $3,250.000 $3,817.000 $4,400.000 $3,500.000 $4,400.000
REMOV & RE - LAY PIPE (18 IN)
LF 76.000 $50.000 $75.000 $150.000 $69.000 $130.000 $60.000 $45.000
REMOV STR (SET)
EA 16.000 $500.000 $300.000 $800.000 $367.500 $190.000 $500.000 $600.000
REMOV STR (WINGWALL)
EA 4.000 $1,000.000 $1,150.000 $5,500.000 $1,030.000 $3,950.000 $800.000 $1,200.000
REMOV STR (HEADWALL)
EA 2.000 $800.000 $1,150.000 $8,500.000 $880.000 $5,050.000 $800.000 $1,000.000
REMOV STR (PIPE)
LF 2,214.000 $15.000 $15.000 $15.000 $13.000 $5.000 $30.000 $16.000
MOBILIZATION
LS 1.000 $100,000.000 $25,000.000 $95,000.000 $46,300.000 $100,000.000 $80,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $3,000.000 $900.000 $4,850.000 $1,240.000 $830.000 $5,000.000 $4,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 110.000 $40.000 $33.000 $38.000 $24.000 $33.000 $30.000 $40.000
ROCK FILTER DAMS (REMOVE)
LF 110.000 $10.000 $9.000 $12.000 $10.500 $9.000 $15.000 $20.000
SANDBAGS FOR EROSION CONTROL (8")
LF 1,000.000 $5.000 $8.500 $3.000 $19.250 $8.000 $6.000 $10.000
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 1,000.000 $1.000 $5.000 $5.000 $5.600 $5.000 $7.000 $10.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,327.000 $20.000 $23.000 $30.000 $22.400 $22.000 $30.000 $24.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $2,000.000 $2,150.000 $2,220.000 $3,060.000 $2,000.000 $1,800.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 73.000 $100.000 $64.000 $125.000 $78.000 $61.000 $60.000 $70.000
REMOVE METAL BEAM GUARD FENCE
LF 380.000 $5.000 $3.000 $3.000 $6.000 $3.000 $3.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $400.000 $280.000 $1,000.000 $190.000 $275.000 $400.000 $350.000
GUARDRAIL END TREATMENT (INSTALL)
EA 11.000 $2,500.000 $280.000 $3,200.000 $2,590.000 $275.000 $2,600.000 $2,800.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 1.000 $15,000.000 $18,000.000 $14,985.000 $20,500.000 $20,000.000 $26,000.000 $32,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $25.000 $17.000 $65.000 $25.000 $17.000 $90.000 $20.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 51.000 $50.000 $62.000 $65.000 $45.000 $60.000 $60.000 $120.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 25.000 $50.000 $37.000 $65.000 $34.000 $35.000 $60.000 $20.000
TMA (STATIONARY)
DAY 135.000 $300.000 $280.000 $185.000 $245.000 $360.000 $120.000 $350.000
Totals: $973,050.000 $897,634.000 $1,054,231.000 $1,075,644.600 $1,175,880.000 $1,310,282.000 $1,320,716.000