Show Job Controls
Bid Cobra

ORANGE SH 12 (0499-03-058)

Items: 70

County: ORANGE
Length: N/A
Highway: SH 12
District: BEAUMONT
Control Number: 0499-03-058
DBE Goal: N/A
Project: STP 2018(565)HES
Guaranty: N/A
Time: 187 WORKING DAYS
Engineer's Estimate: $7,685,429.79
Date: 02/02/2018 (8 years ago)
Contract Number: N/A
Type: INST CONT TURN LANE & RUMBLE STRIPS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$7,685,429.79
$6,632,538.46
Over/Under Est: -13.7% -$1,052,891.33
$7,411,039.54
Over/Under Est: -3.57% -$274,390.25
Amt Left: 11.74% $778,501.08
$7,891,538.40
Over/Under Est: 2.68% $206,108.61
Amt Left: 18.98% $1,258,999.94
Delta: -6.48% -$480,498.86
Over/Under Est: 16.8% $1,291,081.38
Amt Left: 35.34% $2,343,972.71
Delta: -13.75% -$1,084,972.77

Bid Items & Bid Tabulations

70 Total 0 of 70
ORANGE  |  SH 12  |  BEAUMONT  |  0499-03-058  |  02/02/2018  |  $7,685,429.79  |  STP 2018(565)HES  |  INST CONT TURN LANE & RUMBLE STRIPS  |  187 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
OLDCASTLE MATERIALS TEXAS, INC.
A. L. HELMCAMP, INC.
MK CONSTRUCTORS
ANGEL BROTHERS HOLDINGS CORP.
REMOVING CONC (DRIVEWAYS)
SY 327.580 $17.500 $10.800 $25.000 $55.000 $10.000
REMOVING STAB BASE AND ASPH PAV(15")
SY 65,704.500 $7.200 $9.400 $6.000 $10.620 $6.500
SUBGRADE WIDENING (ORD COMP)
STA 295.670 $400.000 $425.000 $600.000 $370.000 $1,700.000
BACKFILL (TY A OR B)
STA 295.670 $150.000 $88.000 $200.000 $270.000 $200.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 67,300.000 $0.300 $0.300 $0.260 $0.320 $0.350
CELL FBR MLCH SEED(TEMP)(WARM)
SY 33,650.000 $0.300 $0.290 $0.260 $0.310 $0.320
CELL FBR MLCH SEED(TEMP)(COOL)
SY 33,650.000 $0.300 $0.290 $0.260 $0.310 $0.320
VEGETATIVE WATERING
MG 1,698.960 $18.000 $16.250 $10.000 $19.770 $10.000
PROOF ROLLING
HR 15.020 $75.000 $74.000 $75.000 $295.000 $60.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 16,971.120 $45.000 $65.000 $62.000 $55.000 $65.000
CEMENT
TON 4,049.970 $190.000 $210.000 $225.000 $229.000 $250.000
CEMENT TREAT (SUBGRADE)(6")
SY 101,826.590 $4.000 $1.900 $3.000 $3.770 $3.000
CEMENT TREAT(MX EXST MTL & NW BS)(12")
SY 95,252.960 $4.000 $2.730 $3.250 $5.510 $4.000
PRIME COAT (AE-P)
GAL 19,050.650 $5.000 $2.400 $5.000 $3.580 $4.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 68,061.640 $3.300 $3.060 $3.600 $4.400 $3.500
AGGR(TY-PD GR-4 OR TY-PL GR-4)
CY 1,454.240 $197.000 $157.000 $150.000 $125.500 $150.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 16,306.440 $120.000 $97.000 $118.000 $145.000 $145.000
PLANE ASPH CONC PAV(0" TO 4")
SY 1,386.670 $6.000 $7.100 $7.000 $5.500 $4.000
PLANE CONC PAV(0" TO 1-1/2")
SY 1,400.660 $5.000 $12.350 $7.000 $5.500 $20.000
FULL-DEPTH REPAIR CPCD (VAR DEPTH)
CY 100.000 $300.000 $425.000 $750.000 $765.000 $750.000
RIPRAP (MOW STRIP)(4 IN)
CY 23.000 $450.000 $475.000 $580.000 $474.000 $750.000
CLEANING AND SEALING JOINTS (CL 7)
LF 432.000 $50.000 $11.550 $32.000 $37.400 $12.000
MULTI-LAYER POLYMER OVERLAY
SY 300.000 $80.000 $64.250 $63.000 $51.250 $75.000
MILLING CONCRETE SLAB (1/4IN)
SY 300.000 $22.000 $26.600 $26.250 $16.500 $35.000
MOBILIZATION
LS 1.000 $750,005.000 $286,000.000 $600,000.000 $295,000.000 $850,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $8,000.000 $925.000 $7,000.000 $9,600.000 $12,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 840.000 $28.000 $30.000 $35.000 $32.450 $30.000
ROCK FILTER DAMS (REMOVE)
LF 840.000 $9.500 $8.050 $6.000 $8.800 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,440.000 $28.000 $2.410 $3.200 $2.640 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,440.000 $15.000 $0.760 $0.750 $0.850 $0.800
INTERSECTIONS (CONC)
SY 101.700 $95.000 $125.000 $115.000 $110.300 $120.000
INTERSECTIONS (ACP)
SY 2,210.200 $35.000 $82.000 $45.000 $21.000 $45.000
DRIVEWAYS (CONC)
SY 584.140 $65.000 $74.000 $90.000 $71.000 $100.000
DRIVEWAYS (ACP)
SY 2,459.170 $30.000 $82.000 $42.000 $21.000 $50.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 64,753.000 $0.250 $0.100 $0.150 $0.120 $0.600
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 15,067.000 $0.450 $0.190 $0.200 $0.320 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 350.000 $20.000 $21.100 $22.000 $23.100 $20.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $3,000.000 $1,455.000 $1,500.000 $1,600.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $4.500 $2.520 $3.000 $3.000 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,150.000 $2,110.000 $2,200.000 $2,310.000 $2,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $625.000 $297.000 $300.000 $325.000 $300.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 95.000 $230.000 $176.000 $190.000 $193.000 $400.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 6.000 $250.000 $186.000 $200.000 $204.000 $450.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $500.000 $497.000 $520.000 $545.000 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 23.000 $505.000 $398.000 $415.000 $435.000 $500.000
REMOVE SM RD SN SUP&AM
EA 13.000 $60.000 $76.000 $80.000 $83.000 $55.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 6.000 $20.000 $20.200 $16.000 $17.000 $12.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 38.000 $70.000 $56.000 $56.000 $60.000 $70.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 44.000 $10.000 $10.100 $11.000 $11.000 $10.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $40.000 $15.100 $30.000 $31.000 $50.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 58,624.000 $0.200 $0.200 $0.200 $0.220 $0.220
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 273,809.000 $0.500 $0.260 $0.250 $0.280 $0.270
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 273,809.000 $0.500 $0.260 $0.250 $0.280 $0.270
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 83.000 $1.750 $1.500 $0.600 $1.100 $5.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,409.000 $1.250 $1.500 $0.600 $1.100 $1.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,858.000 $0.700 $0.760 $0.800 $0.850 $0.800
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 3,095.000 $0.350 $0.310 $0.330 $0.330 $0.350
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 64,753.000 $0.400 $0.310 $0.330 $0.330 $0.350
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 4,818.000 $0.300 $0.310 $0.330 $0.330 $0.350
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 68,163.000 $0.450 $0.310 $0.330 $0.330 $0.350
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 728.000 $12.000 $12.100 $15.000 $13.200 $13.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 25.000 $200.000 $186.000 $200.000 $204.000 $200.000
PREFAB PAV MRK TY C (W) (WORD)
EA 7.000 $285.000 $251.000 $260.000 $275.000 $260.000
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 12.000 $40.000 $25.250 $26.000 $28.000 $26.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 10.000 $50.000 $30.250 $32.000 $33.000 $35.000
REFL PAV MRKR TY I-C
EA 260.000 $3.500 $3.050 $3.500 $3.300 $4.000
REFL PAV MRKR TY II-A-A
EA 946.000 $3.250 $3.050 $3.500 $3.300 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 58,624.000 $0.450 $0.660 $0.580 $0.610 $0.600
REMOVE CENTERLINE TEXTURING
LF 29,312.000 $8.000 $2.830 $5.000 $3.600 $10.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $8,500.000 $15,000.000 $5,500.000 $5,000.000
Totals: $7,685,429.792 $6,632,538.482 $7,411,039.544 $7,891,538.441 $8,976,511.170