Show Job Controls
Bid Cobra

ORANGE SH 87 (0305-07-062)

Items: 65

County: ORANGE
Length: N/A
Highway: SH 87
District: BEAUMONT
Control Number: 0305-07-062
DBE Goal: N/A
Project: C 305-7-62
Guaranty: N/A
Time: 90 WORKING DAYS
Engineer's Estimate: $4,486,424.97
Date: 04/04/2018 (8 years ago)
Contract Number: N/A
Type: BASE REPAIR, OCST, ACP, STRIPE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$4,486,424.97
$3,213,535.64
Over/Under Est: -28.37% -$1,272,889.33
Over/Under Est: -23.7% -$1,063,426.41
Amt Left: 6.52% $209,462.92
Over/Under Est: -6.96% -$312,381.91
Amt Left: 29.89% $960,507.42
Delta: -21.94% -$751,044.50

Bid Items & Bid Tabulations

65 Total 0 of 65
ORANGE  |  SH 87  |  BEAUMONT  |  0305-07-062  |  04/04/2018  |  $4,486,424.97  |  C 305-7-62  |  BASE REPAIR, OCST, ACP, STRIPE  |  90 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PTSS INVESTMENTS, LLC
OLDCASTLE MATERIALS TEXAS, INC.
ANGEL BROTHERS HOLDINGS CORP.
REMOVING CONC (RIPRAP)
CY 6.000 $200.000 $44.000 $420.000 $150.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 160.000 $12.000 $30.000 $30.000 $25.000
BLOCK SODDING
SY 700.000 $5.000 $5.500 $5.100 $6.000
VEGETATIVE WATERING
MG 6.000 $20.000 $25.000 $130.000 $125.000
SUPERPAVE MIXTURES SP-D SAC-A PG76-22
TON 23,748.000 $100.000 $80.000 $83.000 $115.000
FLEX PAVE STRUCTURE REPAIR (8"-10")
SY 500.000 $50.000 $125.000 $80.000 $90.000
PLANE ASPH CONC PAV(1.5" MICRO-MILLING)
SY 287,858.000 $3.000 $1.750 $1.600 $1.750
RIPRAP (MOW STRIP)(4 IN)
CY 37.000 $400.000 $618.000 $460.000 $750.000
CONC BOX CULV (7 FT X 4 FT)(EXTEND)
LF 44.000 $1,000.000 $969.000 $1,000.000 $1,200.000
RC PIPE (CL III)(18 IN)
LF 32.000 $80.000 $65.000 $144.000 $100.000
RC PIPE (CL III)(24 IN)
LF 42.000 $80.000 $113.000 $133.000 $125.000
RC PIPE (CL III)(30 IN)
LF 8.000 $100.000 $148.000 $305.000 $200.000
RC PIPE (CL III)(36 IN)
LF 36.000 $120.000 $151.000 $185.000 $220.000
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX5FT)
EA 1.000 $5,000.000 $6,592.000 $5,900.000 $4,500.000
WINGWALL (PW - 2) (HW=5 FT)
EA 2.000 $5,000.000 $9,218.000 $12,800.000 $16,500.000
SET (TY I)(S=3 FT)(HW=2FT)(4:1)(C)
EA 1.000 $8,000.000 $7,509.000 $3,050.000 $3,800.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 2.000 $8,000.000 $7,509.000 $3,050.000 $5,675.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 8.000 $10,000.000 $7,931.000 $4,600.000 $6,200.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 4.000 $10,000.000 $11,227.000 $5,800.000 $6,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 1.000 $2,000.000 $927.000 $1,490.000 $1,100.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 1.000 $2,000.000 $1,648.000 $2,000.000 $2,700.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $2,400.000 $1,957.000 $2,550.000 $1,250.000
REMOV STR (HEADWALL)
EA 14.000 $1,500.000 $1,051.000 $1,230.000 $1,500.000
REMOV STR (PIPE)
LF 8.000 $30.000 $22.000 $51.000 $100.000
MOBILIZATION
LS 1.000 $400,000.000 $150,000.000 $305,000.000 $150,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $5,000.000 $2,100.000 $2,500.000 $7,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 140.000 $40.000 $32.500 $30.000 $75.000
ROCK FILTER DAMS (REMOVE)
LF 140.000 $10.000 $8.800 $8.200 $20.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 200.000 $8.000 $6.050 $5.600 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $2.000 $1.100 $1.050 $2.000
DRIVEWAYS (ACP)
SY 10,645.000 $30.000 $10.000 $20.000 $18.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 85,113.000 $0.120 $0.400 $0.100 $0.220
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 29,735.000 $0.120 $0.400 $0.200 $0.600
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $20.000 $21.300 $19.500 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $1,812.000 $1,690.000 $2,200.000
REMOVE METAL BEAM GUARD FENCE
LF 600.000 $3.500 $2.750 $2.550 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $250.000 $2.750 $255.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,000.000 $24.000 $2,200.000 $2,750.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 10.000 $20.000 $15.750 $15.400 $24.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 14.000 $50.000 $47.250 $46.000 $55.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 8,206.000 $0.220 $0.180 $0.180 $0.200
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 91,120.000 $0.200 $0.180 $0.180 $0.200
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 923.000 $0.380 $0.420 $0.410 $0.450
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 246.000 $2.000 $2.360 $2.300 $2.600
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 34.000 $47.000 $42.000 $41.000 $45.000
WK ZN PAV MRK NON-REMOV (W)(RR XING)
EA 2.000 $525.000 $158.000 $154.000 $175.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 6.000 $125.000 $47.250 $46.000 $52.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 15,510.000 $0.200 $0.180 $0.180 $0.200
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 38,792.000 $0.200 $0.180 $0.180 $0.200
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 7,112.000 $0.900 $1.000 $1.700 $0.450
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 6,593.000 $0.350 $1.000 $1.700 $0.450
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 923.000 $0.700 $0.650 $0.630 $0.700
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 8,206.000 $0.350 $0.310 $0.300 $0.350
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 91,120.000 $0.350 $0.310 $0.300 $0.350
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 15,510.000 $0.400 $0.310 $0.300 $0.350
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 38,792.000 $0.350 $0.310 $0.300 $0.350
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 359.000 $7.000 $5.770 $5.600 $6.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 742.000 $12.000 $11.550 $11.300 $12.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 34.000 $200.000 $189.000 $185.000 $210.000
PREFAB PAV MRK TY C (W) (WORD)
EA 6.000 $250.000 $246.750 $240.000 $270.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 2.000 $600.000 $472.500 $460.000 $520.000
PREFAB PAV MRK TY C(EVAC SYM, BLUE/WHT)
EA 20.000 $520.000 $499.000 $485.000 $550.000
REFL PAV MRKR TY I-C
EA 1,706.000 $3.000 $2.780 $2.700 $3.000
REFL PAV MRKR TY II-A-A
EA 1,278.000 $3.000 $2.780 $2.700 $3.000
TMA (STATIONARY)
DAY 90.000 $200.000 $125.000 $160.000 $250.000
Totals: $4,486,424.970 $3,213,535.640 $3,422,998.560 $4,174,043.060