ORANGE BU 90Y (0028-15-062)

Items: 50

County: ORANGE
Length: 1.6200 MILES
Highway: BU 90Y
District: BEAUMONT
Control Number: 0028-15-062
DBE Goal: 5.0%
Project: F 2025(844)
Guaranty: $58,000.00
Time: 48 WORKING DAYS
Engineer's Estimate: $2,910,047.69
Date: 07/02/2025 (11 months ago)
Contract Number: 7253211
Type: PREVENTIVE MAINTENANCE
Project ID: A00210032
Contract Type: Federal
Project Description: BU 90Y-(SIMMONS DRIVE, NORTH TO 1.62 MILES NORTH) MILL, FDCR, JOINT SEAL, OCST, AND 1.25" TOM
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
BRYCE BROUSSARD
JIM GRISSOM
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$2,910,047.69
$2,802,309.20
Over/Under Est: -3.7% -$107,738.49
Subcontractor Percentage Amount
DUSTROL, INC. 4.23% $118,663.06
ISI CONTRACTING, INC. 3.80% $106,600.38
A.J.J.A . TRUCKING, INC. 2.89% $81,072.40
AMERICAN REMEDIATION OPTIONS, INC. 2.62% $73,498.16
TRP CONSTRUCTION GROUP, LLC 1.95% $54,702.83
HOLES-GOLDEN TRIANGLE LLC 0.46% $12,904.26
LONESTAR TRAFFIC SAFETY, LLC 0.23% $6,452.13
Total: 16.18% $453,893.22

Bid Items & Bid Tabulations

50 Total 0 of 50
ORANGE  |  BU 90Y  |  BEAUMONT  |  0028-15-062  |  07/02/2025  |  $2,910,047.69  |  F 2025(844)  |  PREVENT MAINT  |  48 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
REMOV CONC (MOWSTRIP)
SY 88.000 $20.000 $40.000
REMOV CONC (CURB)
LF 90.000 $9.000 $58.000
REMOV CONC (RAIL)
LF 156.000 $48.000 $85.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 5,140.000 $130.000 $383.000
TACK COAT
GAL 3,738.000 $4.400 $5.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 323.000 $85.000 $203.000
PLANE & TEXT ASPH CONC PAV(1.5")
SY 59,968.000 $5.130 $2.000
RIPRAP (MOW STRIP)(4 IN)
CY 10.000 $670.000 $1,205.000
CLEANING AND SEALING EXISTING JOINTS
LF 570.000 $60.000 $1.000
RETROFIT RAIL (TY T221)
LF 156.000 $300.000 $400.000
INLET (COMPL)(PCO)(4FT)(BOTH)
EA 1.000 $12,640.000 $20,000.000
MOBILIZATION
LS 1.000 $500,000.000 $280,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $4,000.000 $5,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,000.000 $5,000.000
TMA (STATIONARY)
DAY 48.000 $270.000 $300.000
TMA (MOBILE OPERATION)
DAY 48.000 $400.000 $775.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 200.000 $44.000 $53.000
ROCK FILTER DAMS (REMOVE)
LF 200.000 $12.000 $11.150
TEMP SEDMT CONT FENCE (INSTALL)
LF 200.000 $4.000 $8.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 200.000 $4.000 $2.200
CONC CURB (TY II)
LF 90.000 $45.000 $35.000
MTL W-BEAM GD FEN (TIM POST)
LF 38.000 $29.000 $47.000
MTL THRIE-BEAM GD FEN (TIM POST)
EA 2.000 $2,750.000 $2,300.000
REMOVE METAL BEAM GUARD FENCE
LF 73.000 $4.800 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $330.000 $280.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,200.000 $3,680.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
EA 1.000 $31,520.000 $30,005.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $720.000 $675.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 14.000 $741.000 $808.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 1.000 $810.000 $825.000
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
EA 3.000 $1,200.000 $1,060.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 6.000 $29.000 $16.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 3.000 $46.000 $39.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 4,150.000 $52.000 $0.750
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 4,200.000 $0.330 $0.750
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 2,760.000 $44.000 $0.600
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 15,340.000 $49.000 $0.750
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,145.000 $2.500 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,649.000 $2.500 $1.300
REFL PAV MRK TY I (W)6"(BRK)(090MIL)
LF 4,150.000 $0.650 $1.000
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 4,200.000 $0.650 $1.000
REFL PAV MRK TY I (Y)6"(BRK)(090MIL)
LF 2,760.000 $0.650 $1.000
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 15,340.000 $0.650 $1.000
PREFAB PM TY C (W)(8")(SLD)
LF 320.000 $6.950 $5.200
PREFAB PM TY C (W)(24")(SLD)
LF 26.000 $12.500 $20.750
PREFAB PM TY C (W)(ARROW)
EA 30.000 $220.000 $330.000
PREFAB PM TY C (W)(WORD)
EA 2.000 $300.000 $445.000
REFL PAV MRKR TY I-C
EA 275.000 $3.250 $8.000
REFL PAV MRKR TY II-A-A
EA 196.000 $5.750 $8.000
CURB INLET SEDIMENT PROTECTION
LF 400.000 $20.000 $11.000
Totals: $2,910,047.690 $2,802,309.200
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $97,920.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $3,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
Total: $110,920.00