Show Job Controls
Bid Cobra

NUECES SH0358 (6475-87-001)

Items: 31

County: NUECES
Length: 0.0100 MILES
Highway: SH0358
District: CORPUS CHRISTI
Control Number: 6475-87-001
DBE Goal: N/A
Project: RMC - 647587001
Guaranty: $15,000.00
Time: 180 CALENDAR DAYS
Engineer's Estimate: $749,398.50
Date: 11/19/2024 (1 year ago)
Contract Number: 11241608
Type: ILLUMINATION MAINTENANCE
Project ID: A00212677
Project Description: ILLUMINATION MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$749,398.50
$730,498.31
Over/Under Est: -2.52% -$18,900.19
$920,535.00
Over/Under Est: 22.84% $171,136.50
Amt Left: 26.01% $190,036.69

Bid Items & Bid Tabulations

31 Total 0 of 31
NUECES  |  SH0358  |  CORPUS CHRISTI  |  6475-87-001  |  11/19/2024  |  $749,398.50  |  RMC - 647587001  |  ILLUM MAINT  |  180 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MALDONADO-BURKETT, LLP
3LW CIVIL LLC
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 130.000 $300.000 $331.100 $175.000
RIPRAP (CONC)(CL B)
CY 5.250 $550.000 $2,191.240 $600.000
MOBILIZATION
LS 1.000 $55,511.000 $73,042.350 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $3,500.000 $9,922.500 $25,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $3,500.000 $5,953.500 $10,000.000
TMA (STATIONARY)
DAY 250.000 $200.000 $99.230 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 5.000 $8.000 $5.910 $1.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 5.000 $2.000 $5.910 $1.000
CONDT (PVC) (SCH 40) (2")
LF 100.000 $12.000 $17.340 $15.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 100.000 $22.000 $30.510 $25.000
CONDUIT (PREPARE)
LF 100.000 $3.000 $3.130 $5.000
ELEC CONDR (NO.12) INSULATED
LF 2,500.000 $2.000 $0.720 $1.350
ELEC CONDR (NO.8) INSULATED
LF 90,000.000 $3.000 $1.610 $2.250
GROUND BOX TY D (162922)W/APRON
EA 30.000 $1,300.000 $1,613.200 $1,200.000
REMOVE GROUND BOX
EA 30.000 $400.000 $392.930 $350.000
REMOVE ELECTRICAL SERVICES
EA 5.000 $650.000 $1,009.610 $500.000
ELC SRV TY A 240/480 060(SS)SS(E)GC(O)
EA 5.000 $9,500.000 $11,150.290 $9,500.000
ELC SRV TY D 120/240 100(NS)GS(N)GC(O)
EA 5.000 $9,500.000 $7,340.760 $9,500.000
REMOVE LUMINAIRE POLE
EA 10.000 $750.000 $1,036.900 $1,000.000
INSTALL ABOVE-GROUND CONDUIT
LF 100.000 $15.000 $68.000 $20.000
REPLACE ABOVE-GROUND CONDUIT
LF 100.000 $20.000 $77.460 $20.000
INSTALL UNDERGROUND CONDUIT
LF 100.000 $15.000 $51.760 $15.000
REPLACE UNDERGROUND CONDUIT
LF 50.000 $50.000 $72.860 $15.000
INSTALL ELECTRICAL SPLICE
EA 50.000 $90.000 $91.290 $75.000
INSTALL ROADWAY ILLUM ASSEMBLY (LED)
EA 20.000 $2,000.000 $1,455.730 $2,500.000
REPLACE LUMINAIRE FIXTURE (LED)
EA 50.000 $500.000 $555.200 $400.000
REMOVE FOUNDATION
EA 15.000 $500.000 $1,334.030 $750.000
REPLACE TRANSFORMER BASE COVER
EA 100.000 $200.000 $42.010 $50.000
REPLACE FUSE
EA 50.000 $50.000 $50.820 $50.000
REPLACE BREAKAWAY FUSE HOLDER
EA 50.000 $150.000 $93.630 $150.000
TROUBLESHOOT FOR REPAIRS
HR 30.000 $100.000 $365.770 $125.000
Totals: $749,398.500 $730,498.310 $920,535.000