NUECES FM0665 (6366-21-001)

Items: 29

County: NUECES
Length: N/A
Highway: FM0665
District: CORPUS CHRISTI
Control Number: 6366-21-001
DBE Goal: N/A
Project: RMC - 636621001
Guaranty: N/A
Time: 20 W
Engineer's Estimate: $249,596.08
Date: 12/16/2020 (5 years ago)
Contract Number: N/A
Type: PAVING AND STRIPING OF PARKING LOT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$249,596.08
$238,829.81
Over/Under Est: -4.31% -$10,766.27
Over/Under Est: 3.48% $8,685.42
Amt Left: 8.14% $19,451.69
Over/Under Est: 10.18% $25,397.92
Amt Left: 15.14% $36,164.19
Delta: -6.47% -$16,712.50
Over/Under Est: 10.32% $25,768.87
Amt Left: 15.3% $36,535.14
Delta: -0.13% -$370.95
Over/Under Est: 45.7% $114,053.22
Amt Left: 52.26% $124,819.49
Delta: -32.06% -$88,284.35

Bid Items & Bid Tabulations

29 Total 0 of 29
NUECES  |  FM0665  |  CORPUS CHRISTI  |  6366-21-001  |  12/16/2020  |  $249,596.08  |  RMC - 636621001  |  PAVING AND STRIPING OF PARKING LOT  |  20 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
DOUBLE L CONTRACTING, LLC
TIERRA LEASE SERVICE, LLC
D. I. J. CONSTRUCTION, INC.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
J. CARROLL WEAVER, INC.
PREPARING ROW
STA 1.000 $2,000.000 $16,500.000 $500.000 $5,000.000 $7,986.090 $11,785.570
REMOVING CONC (CURB OR CURB & GUTTER)
LF 100.000 $9.000 $15.000 $5.000 $20.000 $12.250 $29.460
REMOVING CONC (SIDEWALK OR RAMP)
SY 80.000 $22.000 $40.000 $5.000 $25.000 $28.130 $18.420
BACKFILLING PAVEMENT EDGES
CY 22.000 $100.000 $50.000 $35.000 $300.000 $218.910 $134.010
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 590.000 $75.000 $99.770 $96.000 $25.000 $87.580 $145.000
CEMENT
TON 36.200 $160.000 $189.000 $200.000 $300.000 $202.730 $195.130
CEMENT TREAT (EXIST MATL) (6")
SY 4,060.000 $5.000 $3.450 $4.000 $12.000 $2.620 $5.290
PRIME COAT (MC-30)
GAL 815.000 $11.000 $4.090 $4.000 $10.000 $4.800 $5.390
ASPH (MULTI OPTION)
GAL 1,778.000 $5.000 $2.520 $3.250 $6.000 $3.730 $3.430
AGGR (MULTI OPTION)
CY 41.000 $130.000 $93.610 $200.000 $250.000 $244.150 $715.710
D-GR HMA(SQ) TY-D SAC-B PG70-22
TON 352.000 $150.000 $120.120 $175.000 $150.000 $128.490 $205.170
PLANE ASPH CONC PAV (1.5")
SY 2,500.000 $3.000 $3.760 $3.500 $8.000 $4.220 $5.720
MOBILIZATION
LS 1.000 $22,690.600 $15,000.000 $25,000.000 $20,000.000 $41,801.300 $31,234.270
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 1.000 $1,000.000 $1,000.000 $1,000.000 $1,500.000 $653.610 $7,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 600.000 $2.000 $2.500 $2.000 $3.500 $4.040 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 600.000 $1.000 $1.500 $1.000 $1.500 $1.290 $2.400
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 48.000 $10.000 $10.000 $5.000 $12.000 $6.830 $42.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 48.000 $2.000 $5.000 $1.000 $2.500 $4.080 $3.600
CONC CURB (TY I)
LF 580.000 $15.000 $29.700 $35.000 $25.000 $15.940 $42.000
DRIVEWAYS (ACP)
SY 215.000 $75.000 $22.970 $25.000 $36.000 $74.390 $38.400
CONC SIDEWALKS (4")
SY 290.000 $80.000 $56.250 $65.000 $70.000 $76.730 $14.400
CURB RAMPS (TY 1)
EA 4.000 $2,200.000 $1,500.000 $1,500.000 $1,500.000 $1,768.220 $2,160.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 2.000 $720.000 $871.250 $750.000 $800.000 $938.400 $780.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 2,150.000 $0.200 $0.670 $0.750 $1.000 $0.880 $0.900
REFL PAV MRK TY II (W) 8" (SLD)
LF 1,100.000 $0.460 $1.180 $1.500 $1.200 $1.760 $1.800
RE PM W/RET REQ TY II (W) 4" (SLD)
LF 2,150.000 $0.750 $1.280 $0.850 $1.000 $0.990 $1.020
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $214.490 $256.250 $250.000 $220.000 $333.400 $300.000
PRE PM TY C(ACC PRK)(BL&WH)(W/BORDR)LG
EA 4.000 $350.000 $410.000 $300.000 $200.000 $359.200 $360.000
TREE REMOVAL (18" - 24" DIA)
EA 1.000 $200.000 $500.000 $1,500.000 $1,000.000 $2,429.530 $2,946.400
Totals: $249,596.080 $238,829.810 $258,281.500 $274,994.000 $275,364.956 $363,649.306