NUECES FM 43 (1557-01-043)

Items: 87

County: NUECES
Length: N/A
Highway: FM 43
District: CORPUS CHRISTI
Control Number: 1557-01-043
DBE Goal: N/A
Project: C 1557-1-43
Guaranty: N/A
Time: 187 WORKING DAYS
Engineer's Estimate: $4,386,361.04
Date: 06/03/2021 (5 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (7)
E
Engineer's Estimate
$4,386,361.04
$5,154,966.44
Over/Under Est: 17.52% $768,605.40
Over/Under Est: 20.34% $892,404.77
Amt Left: 2.4% $123,799.37
Over/Under Est: 21.39% $938,066.18
Amt Left: 3.29% $169,460.78
Delta: -0.87% -$45,661.41
$5,384,504.00
Over/Under Est: 22.76% $998,142.96
Amt Left: 4.45% $229,537.56
Delta: -1.13% -$60,076.78
$5,421,714.05
Over/Under Est: 23.6% $1,035,353.01
Amt Left: 5.17% $266,747.61
Delta: -0.69% -$37,210.05
Over/Under Est: 30.16% $1,322,750.90
Amt Left: 10.75% $554,145.50
Delta: -5.30% -$287,397.89
$6,462,084.50
Over/Under Est: 47.32% $2,075,723.46
Amt Left: 25.36% $1,307,118.06
Delta: -13.19% -$752,972.56
Subcontractor Percentage Amount
HIGHWAY BARRICADES AND SERVICES, LLC 3.71% $220,156.26
FUQUAY, INC. 3.64% $216,002.37
TRAF-TEX, INC. 1.15% $68,242.51
SOIL TECH ADVANCE INC. 0.46% $27,297.00
PERFORMANCE EQUIPMENT SERVICE 0.45% $26,703.59
Total: 9.41% $558,401.73

Bid Items & Bid Tabulations

87 Total 0 of 87
NUECES  |  FM 43  |  CORPUS CHRISTI  |  1557-01-043  |  06/03/2021  |  $4,386,361.04  |  C 1557-1-43  |  SURF/ROADWAY RESTOR  |  187 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
HAAS-ANDERSON CONSTRUCTION, LTD.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
J E CONSTRUCTION SERVICES, LLC
BAY LTD.
CK NEWBERRY, LLC
J. CARROLL WEAVER, INC.
FOREMOST PAVING, INC.
REMOVING STAB BASE & ASPH PAV (8"-10")
SY 16,092.000 $6.500 $4.150 $5.150 $4.000 $4.400 $5.000 $6.690 $7.700
SUBGRADE WIDENING (DENS CONT)
STA 81.000 $461.000 $809.000 $600.670 $540.000 $640.000 $300.000 $540.890 $2,500.000
BACKFILL (TY A OR B)
STA 211.000 $137.000 $164.000 $150.240 $82.000 $300.000 $150.000 $206.970 $475.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 3.890 $633.000 $2,110.000 $1,571.480 $1,168.000 $1,700.000 $850.000 $1,581.750 $1,950.000
FERTILIZER
TON 0.740 $850.000 $1,110.000 $1,024.900 $2,800.000 $830.000 $1,600.000 $804.760 $1,100.000
VEGETATIVE WATERING
MG 304.000 $18.000 $44.000 $66.050 $52.000 $30.000 $14.000 $26.640 $45.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 7,650.000 $70.000 $71.000 $71.980 $82.000 $95.000 $75.000 $91.520 $74.000
LIME (HYD, COM OR QK)(SLURRY)
TON 710.000 $180.000 $213.000 $175.820 $220.000 $210.000 $200.000 $204.240 $195.000
LIME TRT (SUBGRADE)(8")
SY 35,762.000 $3.000 $3.250 $2.720 $4.000 $3.100 $2.500 $6.970 $5.500
PRIME COAT (MC-30)
GAL 6,617.000 $4.250 $3.800 $4.990 $4.500 $3.900 $4.000 $5.630 $5.000
ASPH (MULTI OPTION)
GAL 11,265.000 $3.000 $2.450 $2.920 $3.700 $2.900 $3.250 $3.080 $11.000
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 1,324.000 $90.000 $129.000 $137.090 $168.000 $87.000 $100.000 $163.990 $73.000
ASPH (AC-15P OR AC-20-5TR)
GAL 39,612.000 $3.000 $3.100 $3.520 $3.400 $3.500 $3.250 $2.810 $5.000
CEM STABIL BKFL
CY 17.000 $82.000 $49.000 $159.300 $190.000 $100.000 $225.000 $133.200 $75.000
FLOWABLE BACKFILL
CY 5.890 $232.000 $226.000 $174.190 $245.000 $1,100.000 $450.000 $159.840 $330.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 60.000 $210.000 $131.000 $279.880 $240.000 $210.000 $200.000 $294.150 $230.000
RIPRAP (CONC)(CL B)
CY 2.100 $1,000.000 $1,700.000 $1,255.200 $2,400.000 $1,500.000 $1,000.000 $1,110.000 $1,300.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 63.000 $500.000 $504.000 $705.610 $420.000 $540.000 $425.000 $740.370 $890.000
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 34.000 $525.000 $910.000 $1,226.790 $655.000 $590.000 $500.000 $622.710 $930.000
CONC BOX CULV (8 FT X 3 FT)(EXTEND)
LF 72.000 $710.000 $888.000 $1,080.600 $950.000 $710.000 $675.000 $1,005.660 $1,300.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 6.000 $5,150.000 $4,800.000 $8,144.860 $9,300.000 $6,000.000 $6,000.000 $8,228.430 $8,500.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 4.000 $6,000.000 $6,830.000 $8,644.860 $9,300.000 $7,000.000 $10,000.000 $8,880.000 $10,700.000
SET (TY I)(S= 8 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $5,830.000 $10,500.000 $16,164.720 $9,300.000 $10,000.000 $14,000.000 $10,664.880 $17,900.000
SET (TY I)(S= 8 FT)(HW= 4 FT)(4:1) (C)
EA 6.000 $5,830.000 $7,970.000 $16,074.770 $9,300.000 $12,000.000 $11,000.000 $8,341.650 $18,600.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 90.000 $1,067.000 $1,360.000 $1,116.470 $1,000.000 $1,700.000 $1,300.000 $1,229.880 $1,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $1,642.000 $1,710.000 $1,598.720 $1,500.000 $2,100.000 $1,900.000 $1,365.300 $1,700.000
CLEAN EXIST CULVERTS
EA 19.000 $1,375.000 $1,460.000 $2,592.710 $800.000 $1,800.000 $875.000 $4,002.720 $3,000.000
REMOV STR (SET)
EA 108.000 $591.000 $391.000 $289.510 $710.000 $510.000 $250.000 $264.260 $375.000
REMOV STR (PIPE)
LF 1,894.000 $15.000 $10.000 $13.760 $24.000 $18.000 $8.000 $30.140 $7.000
MOBILIZATION
LS 1.000 $343,765.000 $372,000.000 $381,100.000 $89,000.000 $99,945.930 $480,000.000 $314,575.660 $550,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $6,500.000 $2,700.000 $1,473.810 $5,000.000 $15,000.000 $2,600.000 $3,330.000 $6,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 30.000 $28.000 $72.000 $40.000 $42.000 $110.000 $32.000 $166.500 $70.000
ROCK FILTER DAMS (REMOVE)
LF 30.000 $9.500 $44.000 $13.750 $29.000 $46.000 $15.000 $83.250 $60.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 78.000 $34.000 $25.000 $27.500 $36.000 $74.000 $25.000 $68.820 $55.000
CONSTRUCTION EXITS (REMOVE)
SY 78.000 $8.500 $7.200 $11.750 $15.000 $17.500 $10.000 $44.400 $25.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,060.000 $2.400 $4.050 $2.650 $4.000 $3.200 $3.250 $3.720 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,060.000 $0.770 $1.400 $0.880 $1.000 $0.650 $2.250 $1.390 $1.500
INTERSECTIONS (ACP)
SY 562.000 $22.000 $62.000 $73.550 $63.000 $150.000 $32.000 $25.880 $100.000
DRIVEWAYS (ACP)
SY 1,710.000 $24.000 $65.000 $37.730 $68.000 $120.000 $24.000 $25.880 $72.000
RUMBLE STRIPS (SHOULDER)
LF 41,872.000 $0.200 $0.250 $0.180 $0.200 $0.140 $0.300 $0.220 $0.350
RUMBLE STRIPS (CENTERLINE)
LF 13,490.000 $0.180 $0.350 $0.260 $0.200 $0.170 $0.350 $0.200 $0.400
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 8.000 $222.000 $194.000 $193.500 $210.000 $780.000 $200.000 $225.330 $200.000
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 6.000 $4,000.000 $4,280.000 $4,127.520 $4,000.000 $4,600.000 $4,000.000 $4,329.000 $3,900.000
CONDT (PVC) (SCH 40) (2")
LF 1,110.000 $10.000 $14.000 $14.880 $11.000 $17.500 $10.000 $15.540 $13.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 250.000 $28.000 $19.000 $41.340 $37.000 $17.250 $25.000 $43.290 $18.000
ELEC CONDR (NO.8) INSULATED
LF 4,215.000 $2.250 $1.900 $1.570 $1.900 $2.000 $1.350 $1.610 $2.000
GROUND BOX TY A (122311)W/APRON
EA 1.000 $1,100.000 $701.000 $1,269.750 $1,800.000 $1,100.000 $1,000.000 $1,332.000 $640.000
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
EA 1.000 $7,500.000 $7,650.000 $8,812.550 $7,200.000 $7,900.000 $8,500.000 $9,213.000 $6,900.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 16.000 $537.000 $572.000 $550.500 $620.000 $560.000 $600.000 $715.950 $520.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 8.000 $745.000 $750.000 $718.500 $812.000 $820.000 $750.000 $782.550 $680.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 8.000 $673.000 $833.000 $797.250 $900.000 $720.000 $850.000 $852.480 $800.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $885.000 $1,000.000 $954.750 $1,100.000 $950.000 $1,000.000 $939.060 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $890.000 $1,060.000 $1,007.250 $1,100.000 $1,200.000 $1,100.000 $967.920 $955.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 2.000 $949.000 $972.000 $928.500 $1,000.000 $820.000 $650.000 $1,078.920 $880.000
REMOVE SM RD SN SUP&AM
EA 42.000 $73.000 $67.000 $74.610 $73.000 $86.000 $100.000 $94.350 $60.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 10.000 $171.000 $167.000 $167.250 $180.000 $160.000 $200.000 $316.350 $150.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 52.000 $56.000 $117.000 $119.630 $126.000 $63.000 $150.000 $75.480 $110.000
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 7,907.000 $3.500 $1.650 $1.590 $1.800 $6.100 $1.750 $1.670 $1.750
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 8,160.000 $4.000 $1.650 $1.590 $1.800 $4.000 $1.750 $1.670 $1.750
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 23,693.000 $2.000 $1.100 $1.060 $1.200 $2.200 $1.250 $1.110 $1.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 20,172.000 $2.000 $1.100 $1.060 $1.200 $2.200 $1.250 $1.110 $1.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 76.000 $8.400 $17.000 $17.030 $18.000 $10.250 $20.000 $16.650 $15.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,144.000 $1.300 $1.100 $1.290 $1.000 $1.150 $1.000 $1.110 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,144.000 $1.280 $1.100 $1.290 $1.000 $0.900 $1.000 $0.940 $1.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,829.000 $0.580 $0.650 $0.680 $0.750 $0.750 $0.750 $0.670 $0.600
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 40.000 $6.000 $17.000 $18.190 $18.000 $5.000 $18.000 $16.650 $15.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 42,496.000 $0.220 $0.350 $0.320 $0.400 $0.270 $0.400 $0.330 $0.350
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 2,718.000 $0.270 $0.350 $0.370 $0.400 $0.300 $0.400 $0.360 $0.350
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 30,889.000 $0.230 $0.350 $0.320 $0.400 $0.280 $0.400 $0.330 $0.350
PREFAB PAV MRK TY C (W) (ARROW)
EA 13.000 $170.000 $194.000 $191.250 $210.000 $210.000 $200.000 $194.250 $200.000
PREFAB PAV MRK TY C (W) (WORD)
EA 13.000 $221.000 $250.000 $243.750 $210.000 $250.000 $300.000 $249.750 $230.000
REFL PAV MRKR TY I-C
EA 82.000 $3.150 $4.450 $5.390 $5.000 $2.400 $5.000 $4.440 $4.000
REFL PAV MRKR TY II-A-A
EA 1,525.000 $3.000 $3.900 $3.740 $5.000 $3.700 $4.000 $3.890 $4.000
ELIM EXT PAV MRK & MRKS (8")
LF 1,184.000 $1.350 $0.550 $0.610 $0.600 $1.300 $1.000 $0.560 $0.500
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
EA 1.000 $3,722.000 $1,560.000 $2,407.550 $2,400.000 $2,500.000 $5,500.000 $2,442.000 $1,500.000
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 1.000 $562.000 $1,060.000 $381.050 $1,000.000 $740.000 $600.000 $299.700 $960.000
D-GR HMA TY-B PG70-22
TON 5,465.000 $80.000 $104.000 $102.420 $108.000 $90.000 $122.000 $109.130 $123.000
D-GR HMA TY-D PG64-22 (LEVEL-UP)
TON 6,636.000 $84.000 $118.000 $106.020 $113.000 $111.000 $130.000 $117.050 $123.000
D-GR HMA TY-D SAC-B PG70-22
TON 9,261.000 $70.000 $105.000 $108.260 $118.000 $95.000 $115.000 $112.960 $125.000
TACK COAT
GAL 19,342.000 $3.000 $3.850 $3.850 $3.500 $2.900 $3.500 $4.350 $4.500
THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)
LF 96.000 $81.000 $76.500 $61.960 $0.000 $0.000 $0.000 $0.000 $0.000
THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)
LF 1,304.000 $63.000 $44.000 $53.980 $0.000 $0.000 $0.000 $0.000 $0.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 660.000 $90.000 $72.000 $68.000 $73.000 $63.000 $50.000 $72.150 $50.000
TMA (STATIONARY)
DAY 162.000 $200.000 $10.000 $187.820 $180.000 $270.000 $265.000 $222.000 $95.000
TMA (MOBILE OPERATION)
HR 480.000 $75.000 $10.000 $139.390 $60.000 $52.000 $20.000 $72.150 $75.000
1
RC PIPE (CL III)(18 IN)
LF 1,304.000 $63.000 $0.000 $0.000 $75.000 $82.000 $62.000 $68.820 $85.000
1
RC PIPE (CL III)(24 IN)
LF 96.000 $81.000 $0.000 $0.000 $82.000 $130.000 $86.000 $82.140 $105.000
Totals: $4,476,289.040 $5,154,966.440 $5,278,765.832 $5,324,427.220 $5,384,504.000 $5,421,714.050 $5,709,111.958 $6,462,084.500