Show Job Controls
Bid Cobra

NUECES SH 358 (0617-01-196)

Items: 106

County: NUECES
Length: N/A
Highway: SH 358
District: CORPUS CHRISTI
Control Number: 0617-01-196
DBE Goal: N/A
Project: NH 2018(843)
Guaranty: N/A
Time: 117 WORKING DAYS
Engineer's Estimate: $5,929,130.50
Date: 05/02/2018 (8 years ago)
Contract Number: N/A
Type: NOVACHIP ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$5,929,130.50
1
Awarded
$7,489,379.23
Over/Under Est: 26.31% $1,560,248.73
Over/Under Est: 36.66% $2,173,436.85
Amt Left: 8.19% $613,188.12

Bid Items & Bid Tabulations

106 Total 0 of 106
NUECES  |  SH 358  |  CORPUS CHRISTI  |  0617-01-196  |  05/02/2018  |  $5,929,130.50  |  NH 2018(843)  |  NOVACHIP ROADWAY  |  117 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BAY LTD.
CLARK CONSTRUCTION OF TEXAS, INC.
REMOVING CONC (RIPRAP)
SY 96.000 $15.000 $64.000 $23.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 3,623.000 $5.000 $4.400 $10.350
REMOVING CONCRETE(MOW STRIP)
LF 1,240.000 $10.000 $6.400 $10.220
REMOVING STAB BASE AND ASPH PAV (0-4")
SY 660.000 $9.000 $12.000 $17.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 1,141.000 $10.000 $69.000 $25.480
D-GR HMA TY B SAC-B PG (64-22)
TON 8,164.000 $60.000 $77.000 $97.160
TBWC (MEMBRANE)
GAL 63,913.000 $3.000 $3.000 $2.500
TBWC (ASPHALT)
TON 922.000 $132.000 $130.000 $148.080
TBWC (AGGREGATE)(TY C)
TON 15,137.000 $135.000 $120.000 $148.080
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 10,944.000 $20.000 $29.000 $34.150
PLANE ASPH CONC PAV (2 1/2")
SY 59,282.000 $1.000 $1.700 $2.000
PLANE ASPH CONC PAV (0" TO 3/4")
SY 10,825.000 $0.500 $1.900 $3.500
PLANE ASPH CONC PAV (3/4")
SY 20,756.000 $0.500 $1.900 $3.500
CEM STABIL BKFL
CY 63.000 $110.000 $84.000 $204.700
CUT & RESTORING PAV
SY 90.000 $105.000 $160.000 $175.310
TRENCH EXCAVATION PROTECTION
LF 134.000 $9.000 $11.250 $6.900
CL C CONC (RAIL FOUNDATION)
CY 675.000 $350.000 $820.000 $621.000
RIPRAP (CONC)(4 IN)
CY 184.000 $350.000 $600.000 $603.750
RIPRAP (MOW STRIP)(4 IN)
CY 133.000 $500.000 $550.000 $561.490
CLEANING AND SEALING EXISTING JOINTS
LF 1,273.000 $50.000 $43.000 $43.080
RAIL (TY T552)
LF 4,785.000 $50.000 $71.000 $84.050
RETROFIT RAIL (TY T552)
LF 16.000 $250.000 $2,400.000 $359.380
RC PIPE (CL III)(24 IN)
LF 81.000 $70.000 $160.000 $166.940
RC PIPE (CL III)(30 IN)
LF 16.000 $85.000 $380.000 $185.740
RC PIPE (CL III)(42 IN)
LF 16.000 $150.000 $440.000 $218.500
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000 $3,000.000 $6,300.000 $4,025.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 3.000 $3,700.000 $4,600.000 $4,600.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
EA 1.000 $4,400.000 $4,800.000 $5,175.000
INLET (COMPL)(PSL)(FG)(4FTX5FT-3FTX3FT)
EA 1.000 $6,000.000 $8,900.000 $5,405.000
CLEAN EXIST CULVERTS
EA 1.000 $2,000.000 $3,200.000 $2,875.000
REMOV STR (INLET)
EA 1.000 $800.000 $390.000 $1,138.500
REMOV STR (PIPE)
LF 101.000 $20.000 $67.000 $115.000
MOBILIZATION
LS 1.000 $450,000.000 $552,000.000 $600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $7,000.000 $9,000.000 $2,500.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 452.000 $7.000 $7.700 $4.600
BIODEG EROSN CONT LOGS (REMOVE)
LF 452.000 $1.000 $1.750 $1.150
PTB (FUR & INST)(STEEL)
LF 2,820.000 $60.000 $200.000 $225.630
PTB (MOVE)(STEEL)
LF 6,600.000 $10.000 $9.700 $8.520
PTB (STKPL)(STEEL)
LF 2,820.000 $15.000 $11.500 $13.000
CONC CURB & GUTTER (TY II)
LF 193.000 $22.000 $56.000 $56.350
MTL W-BEAM GD FEN (TIM POST)
LF 2,150.000 $20.000 $43.000 $32.200
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,600.000 $3,900.000 $5,175.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 11.000 $1,000.000 $3,300.000 $1,725.000
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $800.000 $1,800.000 $1,725.000
REMOVE METAL BEAM GUARD FENCE
LF 6,390.000 $2.000 $14.500 $3.450
REMOVE TERMINAL ANCHOR SECTION
EA 16.000 $200.000 $1,400.000 $575.000
GUARDRAIL END TREATMENT (INSTALL)
EA 11.000 $2,500.000 $5,600.000 $4,025.000
GUARDRAIL END TREATMENT (REMOVE)
EA 16.000 $200.000 $1,600.000 $575.000
CRASH CUSH ATTEN (INSTL)
EA 6.000 $19,000.000 $30,200.000 $31,050.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 8.000 $2,500.000 $470.000 $534.930
CRASH CUSH ATTEN (REMOVE)
EA 5.000 $1,000.000 $760.000 $855.890
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 5.000 $8,000.000 $6,000.000 $6,846.530
REPLACE LUMINAIRE W/LED (150W EQ)
EA 44.000 $800.000 $930.000 $977.500
REPLACE LUMINAIRE W/LED (250W EQ)
EA 19.000 $800.000 $1,000.000 $1,092.500
REPLACE LUMINAIRE W/LED (400W EQ)
EA 144.000 $900.000 $1,200.000 $1,207.500
IN RD IL (TY ST) 40T-8 (250W EQ) LED
EA 2.000 $3,500.000 $3,900.000 $4,082.500
IN RD IL (TY SP) 48S-8-8 (400W EQ) LED
EA 2.000 $4,600.000 $5,300.000 $5,520.000
ELEC CONDR (NO.12) INSULATED
LF 2,000.000 $1.000 $1.300 $1.380
ELEC CONDR (NO.8) BARE
LF 1,200.000 $1.500 $2.100 $2.190
ELEC CONDR (NO.8) INSULATED
LF 2,400.000 $2.000 $2.100 $2.190
GROUND BOX TY A (122311)W/APRON
EA 8.000 $950.000 $1,200.000 $1,265.000
REMOVE ELECTRICAL SERVICES
EA 8.000 $600.000 $410.000 $425.500
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
EA 7.000 $7,000.000 $8,400.000 $8,740.000
ELC SRV TY A 240/480 060(NS)SS(E)GC(U)
EA 1.000 $7,000.000 $7,600.000 $7,935.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 114.000 $28.000 $32.000 $50.600
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 477.500 $28.000 $26.000 $27.600
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 6,254.750 $30.000 $30.000 $31.050
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 9.000 $460.000 $580.000 $603.750
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 54.000 $500.000 $690.000 $718.750
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 11.000 $775.000 $1,400.000 $1,437.500
REMOVE SM RD SN SUP&AM
EA 52.000 $60.000 $99.000 $74.750
REMOVE LRSA
EA 5.000 $1,700.000 $2,300.000 $2,357.500
REMOVE SIGN WALKWAY
EA 19.000 $1,000.000 $2,500.000 $2,587.500
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 48.000 $61.000 $93.000 $97.750
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 221.000 $15.000 $16.500 $17.250
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 40.000 $15.000 $16.500 $17.250
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 234.000 $16.000 $16.500 $17.250
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 35.000 $25.000 $29.000 $29.900
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 3.000 $30.000 $29.000 $29.900
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 9,009.000 $1.000 $1.100 $1.150
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 3,841.000 $1.000 $1.100 $1.150
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 11,226.000 $1.000 $1.050 $1.250
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 19,388.000 $0.750 $0.900 $0.920
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 2,243.000 $1.000 $1.650 $1.730
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 5,772.000 $1.000 $1.650 $1.730
REFL PAV MRK TY II (W) 4" (BRK)
LF 19,606.000 $0.250 $0.150 $0.160
REFL PAV MRK TY II (W) 4" (SLD)
LF 48,099.000 $0.150 $0.150 $0.160
REFL PAV MRK TY II (W) 8" (SLD)
LF 19,388.000 $0.500 $0.310 $0.320
REFL PAV MRK TY II (W) 12" (LNDP)
LF 2,243.000 $2.000 $0.650 $0.690
REFL PAV MRK TY II (W) 12" (SLD)
LF 5,772.000 $2.000 $0.650 $0.690
REFL PAV MRK TY II (Y) 4" (SLD)
LF 48,806.000 $0.150 $0.150 $0.165
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 19,606.000 $0.250 $0.390 $0.400
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 48,099.000 $0.250 $0.390 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 48,806.000 $0.250 $0.390 $0.400
REFL PAV MRKR TY II-C-R
EA 2,621.000 $3.500 $3.300 $3.450
ELIM EXT PAV MRK & MRKS (4")
LF 12,327.000 $1.000 $0.330 $0.350
ELIM EXT PAV MRK & MRKS (8")
LF 21,296.000 $1.000 $0.500 $0.520
ELIM EXT PAV MRK & MRKS (12")
LF 8,525.000 $1.000 $1.000 $1.040
ELIM EXT PAV MRK & MRKS (24")
LF 4,132.000 $2.750 $1.200 $1.270
REMOVE FOUNDATION
EA 2.000 $600.000 $1,400.000 $897.000
RAISE AND LOWER RING (HIGH MAST LIGHT)
EA 4.000 $1,000.000 $560.000 $586.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 5.000 $10,000.000 $8,200.000 $14,000.000
CONDUIT (PREPARE)
LF 1,200.000 $2.350 $2.400 $2.470
REPLC LED HI MST IL(6 FIXT)(ASYM)(TY A)
EA 4.000 $15,000.000 $16,300.000 $17,077.500
TMA (STATIONARY)
EA 4.000 $10,000.000 $12,400.000 $23,000.000
TMA (MOBILE OPERATION)
HR 300.000 $130.000 $45.000 $75.000
Totals: $5,929,130.500 $7,489,379.230 $8,102,567.358