REMOVING CONC (RIPRAP)
|
SY
|
276.000
|
$220.000
|
$32.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
1,173.000
|
$22.000
|
$14.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
40.000
|
$165.000
|
$27.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
171.000
|
$350.000
|
$340.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
14.000
|
$10.000
|
$61.000
|
|
|
SPOT SODDING
|
SY
|
14.000
|
$18.000
|
$49.000
|
|
|
VEGETATIVE WATERING
|
MG
|
0.600
|
$80.000
|
$1,200.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
47,173.000
|
$4.000
|
$3.500
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
1,240.000
|
$125.000
|
$265.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
|
SY
|
12,561.000
|
$80.000
|
$73.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(7")
|
SY
|
1,316.000
|
$180.000
|
$111.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
381.000
|
$300.000
|
$190.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 4")
|
SY
|
24,554.000
|
$6.000
|
$4.500
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
110,205.000
|
$4.000
|
$2.150
|
|
|
PLAN & TEXT ASPH CONC PAV (0" TO 3/4")
|
SY
|
55,046.000
|
$4.000
|
$1.400
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
4.000
|
$900.000
|
$623.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
143.000
|
$740.000
|
$589.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
284.000
|
$100.000
|
$82.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
7.000
|
$2,500.000
|
$3,100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$291,101.000
|
$245,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$10,000.000
|
$28,400.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
240.000
|
$5.000
|
$7.550
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
240.000
|
$2.000
|
$3.650
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
940.000
|
$9.000
|
$6.350
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
940.000
|
$3.000
|
$1.500
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
32.000
|
$50.000
|
$50.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
3,949.000
|
$60.000
|
$129.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
190.000
|
$120.000
|
$79.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
5.000
|
$2,500.000
|
$3,870.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
2.000
|
$3,000.000
|
$4,050.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
32,944.000
|
$0.650
|
$0.300
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
16,472.000
|
$0.650
|
$0.450
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
228.000
|
$160.000
|
$212.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,850.000
|
$40.000
|
$32.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,500.000
|
$2,500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,800.000
|
$1,920.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,975.000
|
$7.000
|
$3.650
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,750.000
|
$3,920.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
6.000
|
$300.000
|
$242.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
3.000
|
$760.000
|
$1,390.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
43.000
|
$25.000
|
$45.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
72.000
|
$35.000
|
$49.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
142.000
|
$25.000
|
$47.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
19.000
|
$112.000
|
$149.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
15,862.000
|
$0.550
|
$0.650
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
7,646.000
|
$10.000
|
$8.450
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
4,195.000
|
$0.550
|
$0.650
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
47,360.000
|
$0.550
|
$0.650
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
2,370.000
|
$3.500
|
$6.050
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
7,304.000
|
$2.000
|
$3.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
7,797.000
|
$2.000
|
$3.200
|
|
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
|
LF
|
102.000
|
$0.700
|
$0.750
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
20.000
|
$0.700
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
1,304.000
|
$0.700
|
$1.000
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
11,981.000
|
$0.600
|
$0.500
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
56,137.000
|
$0.600
|
$0.500
|
|
REFL PAV MRK TY II (W) 8" (DOT)
|
LF
|
20.000
|
$0.700
|
$0.750
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
1,304.000
|
$0.700
|
$0.750
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
505.000
|
$7.000
|
$1.000
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
2,344.000
|
$10.000
|
$1.450
|
|
REFL PAV MRK TY II (Y) 6" (BRK)
|
LF
|
4,195.000
|
$0.650
|
$0.500
|
|
REFL PAV MRK TY II (Y) 6" (DOT)
|
LF
|
102.000
|
$0.700
|
$0.500
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
53,093.000
|
$0.650
|
$0.500
|
|
|
PAVEMENT SEALER 4"
|
LF
|
9,650.000
|
$0.750
|
$0.500
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
11,981.000
|
$0.600
|
$0.850
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
56,137.000
|
$0.600
|
$0.850
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
4,295.000
|
$0.650
|
$0.850
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
53,093.000
|
$0.650
|
$0.850
|
|
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
|
LF
|
370.000
|
$20.000
|
$24.000
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
505.000
|
$10.000
|
$7.250
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
2,182.000
|
$15.000
|
$16.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
54.000
|
$200.000
|
$182.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
2.000
|
$270.000
|
$387.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
32.000
|
$270.000
|
$303.000
|
|
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
|
EA
|
27.000
|
$60.000
|
$18.000
|
|
PREFAB PAV MRK TY C (Y) (12") (SLD)
|
LF
|
418.000
|
$10.000
|
$8.450
|
|
REFL PAV MRKR TY I-C
|
EA
|
304.000
|
$2.500
|
$6.050
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
421.000
|
$3.000
|
$6.050
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
794.000
|
$3.000
|
$6.050
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
9,650.000
|
$1.000
|
$0.300
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
0.200
|
$3,000.000
|
$44,500.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
2.000
|
$400.000
|
$1,330.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
1.000
|
$500.000
|
$1,330.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
71.000
|
$600.000
|
$984.000
|
|
|
DOWNSPOUT CLEANING
|
EA
|
2.000
|
$1,000.000
|
$428.000
|
|
|
D-GR HMA TY-B SAC-B PG70-22
|
TON
|
4,391.000
|
$140.000
|
$217.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
12,132.000
|
$150.000
|
$219.000
|
|
|
TACK COAT
|
GAL
|
8,825.000
|
$4.000
|
$3.500
|
|
|
TBWC (MEMBRANE)
|
GAL
|
16,161.000
|
$4.000
|
$5.250
|
|
|
TBWC PG76-22 SAC-A TY C
|
TON
|
4,044.000
|
$194.000
|
$249.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
7.000
|
$13,727.000
|
$5,900.000
|
|
|
TMA (STATIONARY)
|
DAY
|
77.000
|
$200.000
|
$492.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
61.000
|
$100.000
|
$870.000
|
|
Totals: |
$7,573,245.650
|
$8,824,811.900
|