NUECES SH 44 (0373-02-096)

Items: 93

County: NUECES
Length: N/A
Highway: SH 44
District: CORPUS CHRISTI
Control Number: 0373-02-096
DBE Goal: 0.0%
Project: C 373-2-96
Guaranty: N/A
Time: 90 WORKING DAYS
Engineer's Estimate: $7,573,245.65
Date: 03/05/2024 (2 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
ERNEST LONGORIA
FIDENCIO LOPEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$7,573,245.65
$8,824,811.90
Over/Under Est: 16.53% $1,251,566.25
Subcontractor Percentage Amount
HIGHWAY BARRICADES AND SERVICES, LLC 3.96% $377,455.29
K. L. DURHAM CONSTRUCTION, L.L.C. 1.93% $183,961.79
EPIC ENERGY SERVICES LLC 1.55% $147,741.34
DEPENDABLE FENCE 1.04% $99,129.67
CHEROKEE SERVICES 0.20% $19,063.40
H J HENKE, LLC 0.11% $10,484.87
SOIL TECH ADVANCE INC. 0.09% $8,578.53
Total: 8.88% $846,414.89

Bid Items & Bid Tabulations

93 Total 0 of 93
NUECES  |  SH 44  |  CORPUS CHRISTI  |  0373-02-096  |  03/05/2024  |  $7,573,245.65  |  C 373-2-96  |  RESURF ROADWAY  |  90 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANDERSON COLUMBIA CO., INC.
REMOVING CONC (RIPRAP)
SY 276.000 $220.000 $32.000
REMOVING CONC (CURB)
LF 1,173.000 $22.000 $14.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 40.000 $165.000 $27.000
BACKFILL (TY A OR B)
STA 171.000 $350.000 $340.000
FURNISHING AND PLACING TOPSOIL (4")
SY 14.000 $10.000 $61.000
SPOT SODDING
SY 14.000 $18.000 $49.000
VEGETATIVE WATERING
MG 0.600 $80.000 $1,200.000
ASPH (MULTI OPTION)
GAL 47,173.000 $4.000 $3.500
AGGR(TY-PB GR-3 SAC-B)
CY 1,240.000 $125.000 $265.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 12,561.000 $80.000 $73.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(7")
SY 1,316.000 $180.000 $111.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 381.000 $300.000 $190.000
PLAN & TEXT ASPH CONC PAV(0" TO 4")
SY 24,554.000 $6.000 $4.500
PLANE ASPH CONC PAV(0" TO 2")
SY 110,205.000 $4.000 $2.150
PLAN & TEXT ASPH CONC PAV (0" TO 3/4")
SY 55,046.000 $4.000 $1.400
RIPRAP (CONC)(FLUME)
CY 4.000 $900.000 $623.000
RIPRAP (MOW STRIP)(4 IN)
CY 143.000 $740.000 $589.000
CLEANING AND SEALING EXISTING JOINTS
LF 284.000 $100.000 $82.000
CLEAN EXIST CULVERTS
EA 7.000 $2,500.000 $3,100.000
MOBILIZATION
LS 1.000 $291,101.000 $245,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $10,000.000 $28,400.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 240.000 $5.000 $7.550
TEMP SEDMT CONT FENCE (REMOVE)
LF 240.000 $2.000 $3.650
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 940.000 $9.000 $6.350
BIODEG EROSN CONT LOGS (REMOVE)
LF 940.000 $3.000 $1.500
CONC CURB & GUTTER (TY II)
LF 32.000 $50.000 $50.000
INTERSECTIONS (ACP)
SY 3,949.000 $60.000 $129.000
CONC SIDEWALKS (5")
SY 190.000 $120.000 $79.000
CURB RAMPS (TY 1)
EA 5.000 $2,500.000 $3,870.000
CURB RAMPS (TY 7)
EA 2.000 $3,000.000 $4,050.000
RUMBLE STRIPS (SHOULDER)
LF 32,944.000 $0.650 $0.300
RUMBLE STRIPS (CENTERLINE)
LF 16,472.000 $0.650 $0.450
CONC DIRECTIONAL ISLAND
SY 228.000 $160.000 $212.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,850.000 $40.000 $32.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $2,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,800.000 $1,920.000
REMOVE METAL BEAM GUARD FENCE
LF 1,975.000 $7.000 $3.650
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,750.000 $3,920.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $300.000 $242.000
RELOCATE SM RD SN SUP&AM TY S80
EA 3.000 $760.000 $1,390.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 43.000 $25.000 $45.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 72.000 $35.000 $49.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 142.000 $25.000 $47.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 19.000 $112.000 $149.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 15,862.000 $0.550 $0.650
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 7,646.000 $10.000 $8.450
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 4,195.000 $0.550 $0.650
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 47,360.000 $0.550 $0.650
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 2,370.000 $3.500 $6.050
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 7,304.000 $2.000 $3.200
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 7,797.000 $2.000 $3.200
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
LF 102.000 $0.700 $0.750
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
LF 20.000 $0.700 $1.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 1,304.000 $0.700 $1.000
REFL PAV MRK TY II (W) 6" (BRK)
LF 11,981.000 $0.600 $0.500
REFL PAV MRK TY II (W) 6" (SLD)
LF 56,137.000 $0.600 $0.500
REFL PAV MRK TY II (W) 8" (DOT)
LF 20.000 $0.700 $0.750
REFL PAV MRK TY II (W) 8" (SLD)
LF 1,304.000 $0.700 $0.750
REFL PAV MRK TY II (W) 12" (SLD)
LF 505.000 $7.000 $1.000
REFL PAV MRK TY II (W) 24" (SLD)
LF 2,344.000 $10.000 $1.450
REFL PAV MRK TY II (Y) 6" (BRK)
LF 4,195.000 $0.650 $0.500
REFL PAV MRK TY II (Y) 6" (DOT)
LF 102.000 $0.700 $0.500
REFL PAV MRK TY II (Y) 6" (SLD)
LF 53,093.000 $0.650 $0.500
PAVEMENT SEALER 4"
LF 9,650.000 $0.750 $0.500
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 11,981.000 $0.600 $0.850
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 56,137.000 $0.600 $0.850
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 4,295.000 $0.650 $0.850
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 53,093.000 $0.650 $0.850
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
LF 370.000 $20.000 $24.000
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 505.000 $10.000 $7.250
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 2,182.000 $15.000 $16.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 54.000 $200.000 $182.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 2.000 $270.000 $387.000
PREFAB PAV MRK TY C (W) (WORD)
EA 32.000 $270.000 $303.000
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 27.000 $60.000 $18.000
PREFAB PAV MRK TY C (Y) (12") (SLD)
LF 418.000 $10.000 $8.450
REFL PAV MRKR TY I-C
EA 304.000 $2.500 $6.050
REFL PAV MRKR TY II-A-A
EA 421.000 $3.000 $6.050
REFL PAV MRKR TY II-C-R
EA 794.000 $3.000 $6.050
ELIM EXT PAV MRK & MRKS (4")
LF 9,650.000 $1.000 $0.300
TREE TRIMMING / BRUSH REMOVAL
MI 0.200 $3,000.000 $44,500.000
TREE REMOVAL (4" - 12" DIA)
EA 2.000 $400.000 $1,330.000
TREE REMOVAL (12" - 18" DIA)
EA 1.000 $500.000 $1,330.000
DRAIN INLET CLEANING
EA 71.000 $600.000 $984.000
DOWNSPOUT CLEANING
EA 2.000 $1,000.000 $428.000
D-GR HMA TY-B SAC-B PG70-22
TON 4,391.000 $140.000 $217.000
D-GR HMA TY-D SAC-B PG70-22
TON 12,132.000 $150.000 $219.000
TACK COAT
GAL 8,825.000 $4.000 $3.500
TBWC (MEMBRANE)
GAL 16,161.000 $4.000 $5.250
TBWC PG76-22 SAC-A TY C
TON 4,044.000 $194.000 $249.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 7.000 $13,727.000 $5,900.000
TMA (STATIONARY)
DAY 77.000 $200.000 $492.000
TMA (MOBILE OPERATION)
DAY 61.000 $100.000 $870.000
Totals: $7,573,245.650 $8,824,811.900